Information
-
Add media
-
Job Name
-
Job Number
-
Builder / Contractor
-
Job Site Address
-
Conducted on
-
Prepared by
-
Add media
GENERAL
-
Safety Plan On-Site
-
IIPP, COSP, MSD Sheets On-Site
-
Emergency Phone Numbers and Medical Facility Map Readily Available
-
First Aid Kit On-Site
-
Safety Toolbox Talk Completed
-
Daily Safety Checklist Completed
-
Appropriate Quantity of Drinking Water is Available and/or Readily Accessible
-
Housekeeping Condition
-
Hazardous Materials in Approved Containers and Properly Stored
-
Any Unsafe Work Conditions Present
-
Add media
PPE
-
Hard Hats in Use
-
Safety Glasses in Use
-
Proper Gloves in Use (When Handling any Metal and/or Chemicals)
-
Proper Footwear (Work Boots)
-
Safety Vest in Use
-
Hearing Protection in Use for Elevated Noise (as needed)
-
Add media
LADDER SAFETY
-
Proper Ladder Being Used for Project and In Good Working Condition
-
Ladder Extends 3' Beyond the Roof's Edge or Working Surface
-
Ladder Properly Secured
-
Add media
FALL PROTECTION
-
Is Fall Protection Required on This Project
-
Add media
-
If Yes, What Fall Protection System(s) Are In Use
- SRL
- Rope Grab
- Roof Anchor Brackets
- Parapet Clamps
- Horizontal Lifeline
- Warning Lines
- Parapet Guardrails
- Safety Carts
-
Are Fall Protection Systems Properly Installed and Used
-
Add media
-
Is Fall Protection Equipment In Good Working Condition
-
Are Roof Openings Properly Marked, Covered, and Secired
-
Add media
-
Skylight Covers In Place and/or Properly Secured
-
Add media
POWER TOOLS & ELECTRICAL
-
Properly Rated Extension Cords in Good Working Condition (no frays, all prongs in place)
-
Add media
-
GFCI's In Use
-
Add media
-
Power Tools in Good Working Condition With NO Modifications (all guards in place)
-
Add media
-
Utilizing Proper Lockout/Tagout Procedures and Equipment
-
Add media
FORKLIFTS & OTHER EQUIPMENT
-
Daily Inspection Completed
-
Operators Trained, Hold a Current Certification, and Are Authorized
-
Wheel Chocks Available
-
Add media
NOTES:
-
Add drawing
FOREMAN
-
Add signature