Title Page

  • Conducted on

  • Prepared by

  • Location
  • Contractor/Company name

  • Contact phone number & email

Health & Safety

  • Do you have a recent and reviewed Health & Safety Policy?

  • What is the company's internal audit schedule?

  • Are all persons performing maintenance authorised?

  • Are staff given adequate training and provided adequate supervision?

  • Do you regularly have Health & Safety meetings? Please attach copy/sample of last 3 meeting minutes

  • Do you have a Drug & Alcohol Policy and are your staff randomly drug tested?

Maintenance Items

  • Are there sufficient staff to perform the maintenance within satisfactory timeframes?

  • Maintenance personal duty times - are staff are within duty time limits?

  • How are you complying with applicable ADs?

  • Are defects discovered during maintenance being proceeded with correctly?

  • What is your process for unserviceable parts?

  • When engineer comes across items that are reportable defects to CAA under Part 12, are they identified during scheduled or unscheduled maintenance?

  • Are replacement parts used in compliance with the company's SMS/exposition? (sourced and stored)

  • Is the tech log being filled out correctly when unscheduled maintenance is required? (defect written by pilot and signed off by engineer)

  • Are tech logs complete when issued? eg. check 'hours to run' filled in, any approved extensions included on page 1, pilot maintenance itemised?

  • Are ground tests being performed prior to release of an aircraft to service? Please attach copy sample of engine log book and work package inc. copy of ground run sheet

  • Are only authorised persons carried on flight tests?

  • Are all Engineering Notices recorded and followed correctly?

  • Are work packages being completed IAW Part 145/Part 43?

Please provide a sample work package/evidence for HEH that includes the following:

  • Maintenance Job Package Checklist is attached to each work package and filled out

  • Maintenance Record Checklist attached and completed

  • Work package complete including pages itemised on Checklist page

  • Inspections identified and signed

  • Parts used are traceable through work package - if a separate parts sheet is used, is this identified on worksheets?

  • All spaces for entries are complete

  • All required signatures are complete

  • All release numbers are noted on 'parts used'

  • Tech log attached

  • Have aircraft records been retained or transferred as appropriate?

  • What tool control processes do you have in place?

Feedback

  • Thank you for your time, we appreciate you completing this audit. Is there anything else you would like to add? e.g. Anything else you think we should be looking into, or you would like to show us, any questions or feedback about this audit form?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.