Title Page

  • Site / Town

  • Bun Code

  • Conducted on

  • Panama Engineer

  • EPOS / Primary Line / Circuit Number (CHECK THE PHONE LINE INFO FROM RTS CORRESPONDS WITH THE LINES ONSITE)

  • Ensure this number is confirmed using Test Phone (Tracing cable back)

  • Photo of Labelled socket

  • WiFi / Secondary Line / Circuit Number (CHECK THE PHONE LINE INFO RTS CORRESPONDS WITH THE LINES ONSITE )

  • Ensure this number is confirmed using test Phone (tracing cable back)

  • Photo of Labeled socket

Pre Migration Tasks

  • Meet Site Contact

  • Receipt of Port Map

  • Engineer to report any issues to RTS before start

  • Comments

Migration Start

  • RTS will have started works remotely from 8am

  • Project Support confirmed ready for engineer to start patching

  • Engineer to repatch APs as per port map

  • Engineer to connect VOIP phones to IOT port and connect their laptop to IOT port ensuring their laptop is on DHCP

RTS Equipment Test

  • Engineer to check all phones are online & tested (Ensure all phones can make and receive external calls & all internal calls are fully functional - Kitchen phones cannot make or receive external calls)

  • Engineer to check customer WIFI is online and working

  • Engineer to to test IOT and staff WIFI is online and working

  • Engineer to do Speed tests and include screenshot

  • Comments

  • Engineer to complete heatmap (Take Photo)

  • Comments

  • Photo

EPOS Equipment Test

  • Checks to be Carried out on EPOS equipment (GM required to ensure all devices functioning correctly)

  • Comments

Other Network Equipment

  • All other equipment to be tested by Engineer / Manager

  • Comments

Completion and Sign Off

  • Fix Port Map Diagram inside cabinet door - see example (Take Photograph)

  • Take Photo of ONT / ONT Power Supply Plugs (FTTP Sites)

  • Final Set up of Comms Cabinet (or otherwise) upon completion (Take Photograph)

  • List any parts used from Boot Stock (eg. PDU / Shelf / Cable Tidy)

  • Any Additional Comments

  • GM to sign off on IAuditor everything has been tested and that they are happy with all works complete

  • Final Sign off from RTS completed

  • Name of RTS analyst

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.