Title Page
-
Document No. RV THUWAL REFIT 2017
-
Vessel image
-
Vessel information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
Project brief
Project Brief
-
Date
-
Location
-
Project brief
-
images
Underwater assessment
Hull and underwater assessment
-
Rudder and steering assessment
-
Report on rudder and steering system
-
images
-
-
Vessel hull condition and welds
-
Report and reference to NDT testing, report on paint condition.
-
Hull and weld images
-
Shaft condition (Comment on size, steel grade and keyway)
-
Shaft condition report
-
images
-
-
Propellor condition (Comment on blade condition and any cavitation)
-
Propellor report, Notes and measurements
-
Propellor images
-
-
Anodes (Comment on Qty on vessel hull)
-
Report
-
Images
-
Valves, condition and assessment.
-
Report
-
Report on Engine room keel cooling valve
-
Images
-
Hamilton Water jets condition assessment
-
Report
-
Images
-
Condition assessment
-
Sterntube
-
report
-
Add media
-
-
Add an additional item
Equipment / System
-
Details
-
Further information / report
-
images
Scientific instrument installation
Blister fabrication
-
Select date
-
Add media
Scientific intrument installation
-
Select date
-
Add media
Sea Trial and final assessment of instrument and system installation
-
Select date
-
Add media
Engineering
Yanmar Main aft Engines and gearbox service
-
Date
-
add information
-
images
Caterpillar main engine
-
Date
-
Report
-
Images
Bilge System upgrade (Pumps and pipework)
-
Date
-
Report
-
Images
Engine Room ventilation and battery ventilation
-
Date
-
Details of ventilation system in engine room and upgrade details
-
images
Hot water boiler upgrade
-
Date
-
Images
-
Report
-
Add an additional item
System / Equipment
-
Details
-
Report
-
Images
Electrical upgrade
Electrical milestone 1
-
Date
-
Report
-
Images
Electrical milestone 2
-
Date
-
Report
-
Images
Electrical milestone 3
-
Date
-
Report
-
Images
Electrical milestone 4
-
Date
-
Report
-
Images
HVAC Upgrade
HVAC upgrade 1st milestone
-
Date
-
Report
-
Images
HVAC upgrade 2nd milestone
-
Date
-
Report
-
Images
HVAC upgrade 3rd milestone
-
Date
-
Report
-
Images
HVAC upgrade 4th milestone
-
Date
-
Report
-
Images
Hydraulic System assessment and upgrade
Hydraulic System assessment
-
Date
-
Details and proposal
-
Images of current system in place
Hydraulic System repair
-
Date
-
Report
-
Images
Bow Thruster assessment and repair
-
Date
-
Report
-
images
Anchor Winch repair / service
-
Date
-
Images
-
Report
Galley upgrade
Galley and ventilation upgrade
-
Date
-
Report
-
Details of new galley equipment
-
Galley Images
-
Ventilation system images
Refrigeration upgrade - replacement of aft freezer, fridge and hermatic compressors
Replacement Of Aft Freezer, Fridge And Hermatic Compressors
-
Date
-
Add media
Interior works
Facia / Panels to be constructed around ducting for A/C system in cabins and throughout the vessel where applicable.
-
Date
-
Report
-
images
Aft deck toilet refirbish
-
Date
-
Report
-
Images
Laboratory upgrade
New sinks, fridge / freezer and eye wash system
-
Date
-
Report Laboratory upgrade
-
images
Final report
-
Date
-
Final Report
-
Signed Project Manager Ocean Time Marine
-
Signed KAUST representitive