Are latest construction drawings in use?
-
Have all partitions been set out according to drawing set out?
-
Has the correct head fixing detail been used?
-
Has mastic been used on head/base track if req?
-
Have correct screw centres been used on first skin?
-
Have correct screw centres been used on second skin?
-
Have the correct screw specification and length been used?
-
Have doors and opening been installed with correct specification?
-
Are joints flat and free from damage?
-
Is the boarding finished to high quality?
-
Have pattress been installed?
-
Have pattress brackets been installed and to specification?
-
Has wall insulation been installed?
-
Has wall insulation been installed to correct specification?
-
Have regular pictures of install steps been taken?
-
Is the overall quality of work to standard and manufacturer specification?