Inspection Overview
-
Site photo from Bldg B entrance
-
Was erection phase/area prepared and signed off by Ryan foreman?
-
Has grouting/shimming been completed for previous day's setting?
-
What piece types are being set today?
- Columns
- Structural Panels
- Beams
- Spandrels
- Double Tees
- Insulated Panels
- Solid Plank
- Hollowcore Plank
- Stair Sections
- Structural Steel
-
List pieces set today
QC Inspection Issues
-
Were there QC inspection issues today?
- Columns
- Structural Panels
- Beams
- Spandrels
- Double Tees
- Insulated Panels
- Solid Plank
- Hollowcore Plank
- Stair Sections
- Structural Steel
-
1. List piece number
2. List issue (eg. bolt setting, base plate, bracing, erection/shipping damage)
3. Take picture and log with Wells foreman
Column Issue
-
Photo of column issue
-
1. List piece number
2. List issue (eg. Finish, base or panel connection, bracing, bowing, joint inconsistency, erection/shipping damage)
3. Take picture and log with Wells foreman
Panel Issue
-
Photo of panel issue
-
1. List piece number
2. List issue (eg. Setting pin, ledge inconsistency, elevation bust, erection/shipping damage)
3. Take picture and log with Wells foreman
Beam Issue
-
Photo of beam issue
-
1. List piece number
2. List issue (eg. Finish, column connection, pocket/blockout, erection/shipping damage)
3. Take picture and log with Wells foreman
Spandrel Issue
-
Photo of spandrel issue
-
1. List piece number(s)
2. List issue (eg. Surface finish, flange connection, level setting/shimming, drainage, blockout, expansion joint, erection/shipping damage)
3. Take picture and log with Wells foreman
Double Tee Issue
-
Photo of Double Tee issue
-
1. List piece number
2. List issue (eg. Finish, base/panel connection, bowing, bracing, erection/shipping damage)
3. Take picture and log with Wells foreman
Elevator Tower Panel Issue
-
Photo of Panel issue
-
1. List piece number
2. List Issue (eg. finish, embed plates, connections, erection/shipping damage)
3. Take picture and log with Wells foreman
Solid Plank Issue
-
Photo of Plank Issue
-
1. List piece number
2. List issue (eg. underside finish, keyway connection, embed plate, erection/shipping damage)
3. Take picture and log with Wells foreman
HC Plank Issue
-
Photo of HC Plank Issue
-
1. List piece number
2. List issue (eg. surface finish, embeds, level setting/shimming, erection/shipping damage)
3. Take picture and log with Wells foreman
Stair Issue
-
Photo of Stair issue
-
1. List piece number
2. List issue (eg. Finish, size, level setting/shimming, welds, erection/shipping damage)
3. Take picture and log with Wells foreman
Steel Issue
-
Photo of Steel issue
-
No QC issues were seen on-site today
Jobsite Safety
-
Were there any safety issues on-site today?
-
Explain any safety issues
-
Add media
-
No safety issues were seen on-site today
-
Is tie-off and leading edge protection in-place and consistently in use?
-
Photo of missing protection or safety violation
Finishes
Detailing QC
-
Is PC detailing taking place today?
-
Are all connecting structural pieces grouted and approved for loading
-
Are pieces backfilled, braced and set level, plumb and true?
-
Has camber come out of pieces as designed?
-
Is all exposed steel or rebar stainless or epoxy?
-
Are connection welds inspected and approved?
-
Galvanized or black steel welds have been ZRC'd?
-
Are double tee flange connectors welded at a depth of 1.5" and free from chipping and cracking?
-
Are pieces set and level to conform to sloping requirements<br><br>Maximum of 1/2" korlath shim to be used with vosco pad, if more is necessary metal shims must be used!
-
Are joint widths uniform, within tolerance and level?
-
Are blockouts fully formed, free of excess concrete and debris?
-
Is structural steel detailing taking place today?
-
Are connection welds inspected and approved?
-
Are welds bondo'd, ground smooth and prepped for paint?
-
Are concrete curbs being placed today?
-
Are gaps at pour-back areas uniform and within tolerance (1"-2" depending on location)?
-
Is all caulking and detailing complete under curb area in daily pour?
-
Has mix design been approved and discussed with concrete crew?
-
Has reinforcement been installed, inspected and tied-in to surrounding structural pieces?
-
Is the concrete crash wall being poured or prepped today?
-
Has reinforcement been installed, inspected and tied-in to structural pieces?
-
Has wall finish (vertical light broom) been discussed with Ryan concrete Foreman?
-
Is the expansion joint being set today?
-
Is blockout fully-formed, of uniform depth and width?
-
Has mechanical joint been installed by Wells per structural detail and bond-break foam been placed?
-
Is tee-to-tee transition level and finish uniform?
-
Are drains being placed today?
-
Are drain blockouts prepared for coring or concrete placement?<br><br>Is tee surface level to support drain body flange?<br><br>Has Wells checked tee flange blockout locations for reinforcement issues?
-
Is top of drain body 3/4" below tee finish elevation?
-
Has secondary reinforcement been placed on top of drain body?
-
Is panel coring taking place today by trades other than Wells?
-
Has Wells marked strand or reinforcement locations within panels/spandrel/plank to be cored?
Caulking/Membrane QC
-
Is caulking/membrane placement taking place on-site today?
-
Have all joints been welded, skimmed, prepped for caulk and checked by Wells foreman?
-
Are joints dry and bonding agents fully cured (72 HRS or manuf. min)?
-
Have all penetrating or waterproof sealers been kept out of caulk joints (vertical and horizontal)
-
Have all joints been wire brushed/ground/chipped to expose and roughen caulking surface?<br><br>Has slurry/slag been removed from deck/exposed plank?<br><br>Has area been brushed, washed or swept?
-
Has correct size backer rod been installed to adequate depth?
-
Are joints of uniform width from end to end and within tolerance(s)?<br>Double Tee - 7/8" +/- 1/8"<br>Panel/Spandrel - 5/8" +/- 1/8"
-
Are panels flush or offset by less than 1/4" between panels AND 1/4" in 10' / 3/8" in 100' MAX
-
Are tooled concrete joints uniform and clean?
-
Drain blockouts are fully formed, cured and caulked prior to membrane placement?
-
Caulking has been installed in a uniform manner, joints are tooled and protected after installation?
-
Has area to receive membrane received shot blasting preparation or bonding agent?<br><br>Has installer brushed off surface with air gun prior to application?
-
Stop caulkers from scope of work and notify Wells foreman
-
Photos from daily QC Inspection
-
QC Inspection Completed By: