Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
(S)PICOP Details
-
Week No
-
Item Number
-
PPS Reference
-
Location
-
Audit Reference
AUDIT CHECKLIST
POSSESSION OVERRUN CAPTURE SHEET
-
Did the possession overrun
-
Is possession overrun initial findings sheet filled in
-
Are root and underlying causes included
-
Are any lessons learnt listed
(S)PICOP LOG
-
Does log include requested hand back time
-
Does log include details of updates recieved
-
Is log detailed enough taking into account the possession excluding above 2 requirments
-
Comments
RT3198 PICOP RECORD OF ARRANGMENTS FORM
-
Line to be blocked
-
Protecting signals to be kept at danger
-
Possession mileages
-
Protection arrangments
-
Level crossing arrangements
-
Worksite details
-
Engineering supervisor details
-
Is all other information complete as required
TRAIN LOG
-
Were any trains within the possesison
-
Is the VMF completed correctly
OTHER ISSUES
-
Any other issues identified
-
Comments