Title Page
-
Conducted on
-
Prepared by
-
Job Number
-
Postcode
-
Date and Time of visit
-
Name of Escalation point (TM or MDU engineer)
-
Have you attended an MDU visit which is not fully operational?
-
Was the visit completed?
-
Has the head end/cab been assessed?
-
What was not working on the system?
-
What did you do on the visit?
- Replaced SkyQ
- Replaced SkyHD+
- Replace ct100 fly lead
- Replaced F connectors
- Other
-
If “Other” was selected what was completed?
-
Was the customer satisfied with the service and information you have provided?
-
Please add pictures of any MDU equipment, data logs or other useful info.
-
Add signature