Title Page
-
Site conducted
-
Conducted on
-
Description of the Task/Activity
-
Project Name:
-
Project Ref:
-
Site Address/Location
-
Project Start Date
-
Project End Date
-
Personnel Involved:
Person
-
Name and Surname
-
Role/Trade
-
Works Supervisor:
-
Role:
-
Contact Number:
Key Plant and Tools Required:
-
undefined
Key Materials Required:
-
undefined
Other Essential Equipment:
-
undefined
-
Specific Identified Residual Hazards:
Specific Staff Training Requirements:
-
undefined
Sequence of Operations:
-
undefined
-
Temporary Supports and Props needed to facilitate the works:
-
Method of Access and Egress to the work area:
-
Fall Protection Measures:
-
Required Personnel Protective Equipment:
- Gloves
- Foot (Boots)
- Eye protection
- Protective Hearing Devices (earplugs, muffs)
- Hard Hats
- Respirators
- Full Body Suits
- Full Body Climbing Harness
- Masks or Shields
- Other
-
Please specify
-
Emergency Procedures:
-
Name of on-site First Aider:
-
First Aid Box Location:
-
Nearest Hospital:
-
Nearest Hospital:
-
Other Information & Comments, Ex: 1. All workers are responsible for taking care of their PPE. 2. Whenever possible use mechanical lifting equipment and keep manual handling to a minimum. 3. Ensure all tools are inspected upon use.
-
Prepared by
-
Designation
-
Select date
-
Reviewed by
-
Designation
-
Select date
-
gff