Information

  • Audit Title

  • Client / Site

  • Job No.

  • Building Number

  • Building Name

  • UQ Contract Supervisor

  • Contractor Name

  • Prepared by

  • Conducted on

  • Site or building picture

  • Work Location

  • Trade Type

  • Foreman/Workers Name

  • Contact Telephone

1. Working at Heights

  • 1.1. Fall risks of 2m or more? (including voids, pits, and trenches)

  • 1.2. Lack of edge protection?

  • 1.3. Unsafe or incomplete edge protection?

  • 1.4. Two persons conducting works

  • 1.5. Contractor consulted the UQ Roof Safety Management Plan

  • 1.6. Elevated work platforms are competently operated with licenced operators if required?

2. Plant and Equipment

  • 2.1. Unsafe or damaged plant/equipment? (including missing or damaged guards)

  • 2.2. Incorrect plant /equipment for job? (e.g. grinding discs for cutting)

  • 2.3. Unsafe or incompatible attachments used with plant/equipment?

  • 2.4. Unlicensed operators?

  • 2.5. Lack of safe work instructions?

  • 2.6. Lack of training in safe operation, clean-up and maintenance?

  • 2.7. Lack of LOTO procedures for cleaning, servicing and maintenance?

  • 2.8. Lack of pre-operational checks?

  • 2.9. Plant warning devices operable?

3. Scaffolds

  • 3.1. Unlicensed persons erecting scaffold above 4m?

  • 3.2. Unsafe or incomplete scaffold?

  • 3.3. Lack of inspection protocol for scaffold?

  • 3.4. Incompatible scaffold components? Unlabelled or do not meet AS?

  • 3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)

4. Handling & Lifting Equipment

  • 4.1. Unsafe or damaged plant?

  • 4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?

  • 4.3. Lack of maintenance, testing and inspection?

  • 4.4. Lack of SWL information displayed?

  • 4.5. Lack of daily inspection protocol?

  • 4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?

  • 4.7. Lifting equipment unlabelled, does not meet AS, no SWL displayed?

  • 4.8. Unlicensed operators?

  • 4.9. Lack of LOTO procedures for cleaning, servicing and maintenance?

  • 4.10. SWL of plant or any lifting equipment exceeded?

5. Harness, Equipment & Anchor Points

  • 5.1. Unsafe or damaged harness or equipment?

  • 5.2. Incompatible hooks/equipment?

  • 5.3. Unlabelled or does not meet standards, is it in date?

  • 5.4. Unsafe or uncertified anchor points?

  • 5.5. Lack of inspection protocol for equipment?

  • 5.6. Lack of or inadequate formal training for operators?

6. Ladders

  • 6.1. Unsafe or damaged ladders?

  • 6.2. Unsafe positioning of ladders?

  • 6.3. Ladder not properly secured?

  • 6.4. Ladder unsuitable for job? (e.g. metal ladder used for electrical work)

7. Hazardous Manual Tasks

  • 7.1. Lack of identification hazardous manual tasks?

  • 7.2. Lack of assessment of hazardous manual tasks?

  • 7.3. Inadequate risk controls? (examples: no job rotation, lighter loads, trolleys, lifting equipment, etc)

  • 7.4. Lack of training in risk controls and safe lifting/ team lifting techniques?

8. Hazardous Chemicals (including fuel and oil)

  • 8.1. Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)

  • 8.2. Incompatible chemicals stored near each other?

  • 8.3. Inadequate spill containment equipment?

  • 8.4. Safety Data Sheets not accessible on site?

  • 8.5. Lack of emergency procedures for injury/spills/fire etc?

  • 8.6. Excessive quantities stored on site or in vehicles?

  • 8.7. Insufficient ventilation?

  • 8.8. Insufficient, or incorrect, PPE?

  • 8.9. Unsuitable storage containers? (unlabeled or stored in food containers)

9. Emergency Response & First Aid

  • 9.1. Lack of, or no emergency or evacuation plans for site?

  • 9.2. Emergency procedures not displayed at site?

  • 9.3. UQ Emergency Number Knowledge

  • 9.4. Lack of, or inadequate first aid kits aid equipment for site?

  • 9.5. Any recent incidents? Expand.

  • 9.6. Unsuitable or inadequate communication equipment?

  • 9.7. Fire extinguisher available if required?

10. Traffic Management & Road Works

  • 10.1. Lack of, or inadequate, Traffic Management Plan (TMP) in place?

  • 10.2. Lack of training in TMP for all persons on site? <br>(contractors and visitors)

  • 10.3. Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)

  • 10.4. Lack of signage in place?

11. Personal Protective Equipment (PPE)

  • 11.1. Lack of, or inadequate PPE (including sun protection)

  • 11.2. Lack of system to issue, inspect, replace and monitor PPE?

  • 11.3. Lack of training in safe use, clean-up and inspection of PPE?

12. Site Condition, Amenities & Work Environment

  • 12.1. Management of, Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)

  • 12.2. Insufficient lighting?

  • 12.3. Inadequate housekeeping?

  • 12.4. Lack of, or inadequate noise/ vibration control?

  • 12.5. Work areas are barricaded to prevent non-authorised access?

  • 12.6. Free access/egress is available for staff/students around work area?

  • 12.7. Site/Work area is free from rubbish and obstructions?

  • 12.8. Building materials are stored within the confines of the work area?

13. Electrical Hazards

  • 13.1. Unsafe electrical leads? (damaged, out of test date or untested)

  • 13.2. Lack of RCD protection?

  • 13.3. Contact with underground assets?

  • 13.4. Contact with overhead electrical lines?

  • 13.5. Overloading outlets?

  • 13.6. Leads placed on ground or on metal structures?

  • 13.7. Electrical equipment near water?

  • 13.8. Electrical equipment near flammables?

  • 13.9. Electrical equipment near chemicals that could cause damage?

  • 13.10. Electrical leads that may be damaged from contact with moving machinery parts?

  • 13.11. Electrical leads on work surfaces?

  • 13.12. Isolation: Lack of Lock-out/tag-out (LOTO) procedures for electrical equipment?

  • 13.13. Trade Licence Observed

  • 13.14. Live Work, Low Voltage, Rubber Mats?

  • 13.15. LCD Rescue Kit and observer?

  • 13.16. Workers LVR trained, Resus.?

  • 13.17. Tools, leads, plugs, sockets and switches appear to be in good condition.

14. Environmental Hazards & Waste Management

  • 14.1. Lack of/or inadequate Environmental Management plan (EMP)?

  • 14.2. Lack of/or inadequate, dust suppression system?

  • 14.3. Lack of/or inadequate systems to prevent contaminants entering stormwater drains?

  • 14.4. Lack of water re-use systems?

  • 14.5. If waste removed by skip bin located on site, is it compliant?

15. Administrative Procedures

  • 15.1. Lack of/or inadequate Site Safety Plan?

  • 15.2. Failure to obtain permits (Council, EPA, WHS, also Hot Works, Confined Space etc)

  • 15.3. Lack of, or inadequate site induction for workers, contractors, visitors?

  • 15.4. Lack or, or inadequate, supervisory arrangements?

  • 15.5. Lack of/or inadequate training, licenses, general induction, skills, experience?

  • 15.6. Lack of/or inadequate Safe Work Method Statements (SWSM) for high- risk work?

  • 15.7. Lack of, or inadequate system to review SWMS as needed?

  • 15.8. Lack of/or inadequate incident notification procedures?

  • 15.9. Lack of, or inadequate, routine inspections, monitoring, audits?

  • 15.10. Lack of/or inadequate consultative arrangements?

  • 15.11. Lack of Hazard Identification Process, Risk Assessment, Took Box Talks & Start up discussions?

  • 15.12. Workers on site have UQ Induction

  • 15.13. Correct UQ work order on site?

16. Confined Spaces

  • 16.1. Contractor consulted UQ Confined Space Safety Management Plan?

  • 16.2. Confined space permit completed?

  • 16.3. Rescue procedures developed and all persons trained.

  • 16.4. Two persons conducting works

17. Other Controls & Methods

  • 17.1 Work area fire isolated if welding /brazing /grinding?

  • 17.2. Flashbacks in place?

  • 17.3. Apprentice is under supervision?

18. Comments

  • 18.1. Additional Observations

  • 18.2. Additional Media

20. Corrective Actions

  • 20.1. Enter any corrective actions that will be undertaken

  • 1. If person/s being audit has no UQ ID or is not inducted, they must stop works and either sign in to obtain UQ ID or complete induction. This would constitute a Non Conformance on the contractor.
    2. Plant pre-operational checks – these are documented checks / inspections on any mobile plant, such as bobcat, forklift etc
    3. LOTO – this stands for Lock Out/ Tag Out of electrical supplies of the item or plant being working on.
    4. Welding zone isolation – the fire zone  where welding or oxy sets are being used must be isolated to ensure fire detection system does not go into alarm where work is being carried out.
    5. MDSD’s – Safety Data Sheet – this must be kept in a folder with works and each MSDS must be within 5 years.

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.