Information

  • Site conducted

  • Audit title

  • Project

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Paperwork

  • 1.1- Is the proper paperwork being filled out and completed prior to work being performed?

  • 1.2- Have Locates been completed and documented?

  • 1.3- Have the Dig Permits been properly and completely filled out?

  • 1.4- Has Equipment checklist paperwork been completed and filled out properly?

  • 1.5- Has the AHA on site been signed by all assigned team members?

  • 1.6- Has the AHA been amended and signed by all team members?

2. General Lighting

  • 2.1- Is there good natural lighting?

  • 2.2- Is temporary lighting put in place?

  • 2.3- Do the temporary lights have any missing cages?

  • 2.4- Are there any bulbs missing or bulbs that need to be replaced in the temporary lighting?

  • 2.5- Is emergency exit lighting operable?

3. Building Safety

  • 3.1- Are floor surfaces even and uncluttered?

  • 3.2- Are entry and walkways kept clear?

  • 3.3- Are stairs and risers kept clear?

  • 3.4- Are safety railings in good condition?

  • 3.5- Are fall preventative measures in place and used where gaps occur in floors?

  • 3.6- Are cords out of walkways?

  • 3.7- Are there signs showing where to exit the building?

4. Housekeeping

  • 4.1- Are trash cans located at suitable points around site?

  • 4.2- Are trash cans emptied regularly?

  • 4.3- Are conduit scraps picked up and not on the floor?

  • 4.4- Are loose materials picked up and not on the floor?

  • 4.5- Are work areas clean?

5. Fire Prevention

  • 5.1- Is the evacuation plan displayed and understood by all employees?

  • 5.2- Are the evacuation procedures discussed regularly?

  • 5.3- Are fire extinguishers in place and clearly marked for the type of fire?

  • 5.4- Have fire extinguishers been recently serviced or inspected?

  • 5.5- Are fire extinguishers clear of obstructions?

  • 5.6- Are flammable storage cabinets used with proper signs posted?

  • 5.7- Are fire extinguishers within 50 feet of flammable storage cabinets?

6. Hazardous Chemicals

  • 6.1- Are SDS available on site?

  • 6.2- Is fuel being properly stored?

  • 6.3- Are fuel cans labeled correctly?

  • 6.4- Are chemicals properly labeled?

  • 6.5- Are chemicals being properly disposed of?

7. Storage Design and Use

  • 7.1- Are materials stored in racks and bins wherever possible?

  • 7.2- Is conduit stored correctly?

  • 7.3- Are floors around storage area clear of obstructions?

  • 7.4- Are the gang boxes clean and orderly?

  • 7.5- Are ladders kept in a secure location?

8. Equipment

  • 8.1- Is all paperwork regarding equipment completed?

  • 8.2- Is equipment being maintained and kept clean?

  • 8.3- Are equipment checklists current and available for inspection?

  • 8.4- Do operators have certification cards on their person as required?

  • 8.5- Do the operators know how to operate safely?

  • 8.6- Are spotters being used to ensure safe movement of equipment?

9. PPE

  • 9.1- Are employees wearing the proper footwear for the job?

  • 9.2- Are employees wearing proper PPE?

  • 9.3- Do employees need new safety gear?

  • 9.4- Do the employees have PPE

  • 9.5- Are safety shields being used when needed?

10. Ladders

  • 10.1- Are ladders inspected before use?

  • 10.2- Are ladders used according to manufacturer's recommended use?

  • 10.3- Are extension ladder ropes, pulleys and treads in good state of repair?

  • 10.4- Are ladders properly labeled?

  • 10.5- Is the right ladder being used for the job?

11. Trench and Excavation

  • 11.1- Has the proper paperwork been filled out before excavation work started?

  • 11.2- Has the soil been classified?

  • 11.3- Are the spoil piles at least two feet or greater away from excavation?

  • 11.4- If excavation is greater than four feet in depth, has it been properly sloped or shored?

  • 11.5- Dose the trench have a way of safe ingress and egress or ramp with proper slope and identified as a entry ramp, or is a ladder in place every 25 feet of lateral movement?

  • 11.6- Has the excavation been fenced off and safe from potential fall hazards?

  • 11.7- Has excavation been properly compacted?

12. Working at Heights

  • 12.1- Are there fall risks of 6 feet or more? (Standing close to a leading edge, also voids, pits, and trenches)

  • 12.2- Is there protection in place for leading edge work of 6 feet in height or more?

  • 12.3- Are workers trained in Fall Protection?

  • 12.4- Are harnesses in safe working condition?

  • 12.5- Are the self-retractable lanyards in safe working condition?

  • 12.6- Are materials brought up in a correct manner?

13. Electrical Safety

  • 13.1- Have portable power tools been tested and tagged?

  • 13.2- Are portable power tools in good condition?

  • 13.3- Is the power tool used per manufactures recommendation?

  • 13.4- Is the power tool missing any safety guards or parts?

  • 13.5- Have the plugs, sockets, or switches been checked?

  • 13.6- Are cords inspected for fraying or damage?

  • 13.7- Are the cords checked if they are under stress?

  • 13.8- Where required are emergency shut-down procedures in place?

  • 13.9- Are all wires capped?

  • 13.10- Are all boxes containing energized conductors covered?

  • 13.11- Have the GFCI receptacles been tested?

  • 13.12- Are knock-out seals in place as needed?

COVID-19 Items

  • Is hand sanitizer full and available?

  • Are hand washing facilities available?

  • Are team members wearing face coverings?

  • Are social distancing guide lines being followed?

  • Are temperature checks being used at beginning of shift?

Temporary Power Systems

  • Is temporary power available to job site?

  • Is temporary power being utilized from existing building power panel?

  • Is temporary power panel properly built to NEC codes?

  • Are all romex cables and conduits entering temporary panel using proper fittings?

  • Does temporary panel have GFCI receptacles mounted to it?

  • Do GFCI receptacles have in-use covers properly installed?

  • Are GFCI receptacles tested on a weekly basis?

  • Are breaker spaces in the temporary panel properly protected with breaker blanks?

  • Are Danger signs properly adhered to the front of the temporary panel?

  • Are signs adhered to temporary panel indicating who to contact in emergency?

Sign Off

  • Project Foreman

  • Safety Auditor

Final Score:

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.