Title Page

  • Safety Audit

  • Date of Inspection:

  • Jobsite:

  • Jobsite Picture:

  • Weather (Take Screenshot from Heat Index App)

  • Project Manager:

  • General Superintendent:

  • Project Superintendent:

  • Assistant Superintendent:

  • Audit Performed By:

1.0 GENERAL SAFETY & HEALTH

  • 1.1 Government / All-In-One Posters Up to Date (English & Spanish) (Scan QR Code on Poster to Verify) Order New Ones from Southern Safety

  • 1.2 Weekly Safety Meeting Completed (attach a picture of the sign in sheet)

  • 1.3 Stretch & Flex Being Done

  • 1.4 Pre-Task Plans (Attach Pictures of all PTP's from One Random Day) (PTP's Need to be Double Sided English and Spanish)

  • 1.5 Green Tape Wrapped Completely Around Hard Hat to Identify a New Hire (Tape is placed towards top)

  • 1.6 Red Tape Wrapped Around Hard Hat to identify a Transferred Employee From Another UFI jobsite (Tape is placed towards top)

  • 1.7 Orange Tape Wrapped Completely Around Hard Hat to Identify the Crew Foreman (Tape is placed towards bottom)

  • 1.8 Yellow Tape Wrapped Completely Around Hard Hat to Identify Carpenters (Tape is placed towards bottom)

  • 1.9 Green Tape Wrapped Completely Around Hard Hat to Identify Laborers (Tape is placed towards bottom)

  • 1.10 Blue Tape Wrapped Completely Around Hard Hat to Identify Carpenter Helper (Tape is placed towards bottom)

  • 1.11 Workers Aware of Earbuds / Cellphone Use Policy (Spot Check one Worker Wearing a Face Covering)

  • 1.12 UFI Site Specific Plan Available (attach photo)

  • 1.13 Traffic Control / Training / Stop Slow Paddle w/ 7 Foot Handle / Hi-Viz Garment

  • 1.14 Water Kegs or Bottles / Sanitary / Cups / Trash Receptacle

  • 1.15Next Company Safety Meeting at the Groveland Yard - TBD

2.0 MEDICAL / EMERGENCY INFORMATION

  • 2.1 First Aid & CPR Current for Project Superintendent(s) - (Verify on Dropbox 01 Certificate Folder)

  • Name(s):

  • 2.2 OSHA 10 Hour (4 Year Current) for Project Superintendent(s) - (Verify on Dropbox 01 Certificate Folder)

  • Name(s):

  • 2.3 First Aid & CPR Current for Assistant Superintendent(s) - (Verify on Dropbox 01 Certificate Folder)

  • Name(s):

  • 2.4 OSHA 10 Hour Minimum (4 Year Current) for Assistant Superintendent(s) (Verify on Dropbox 01 Certificate Folder)

  • Name(s):

  • 2.5 First Aid & CPR Current for Site Safety Coordinator(s) (Verify on Dropbox 01 Certificate Folder)

  • Name(s):

  • 2.6 OSHA 10 Hour Minimum (4 Year Current) for Site Safety Coordinator(s) (Verify on Dropbox 01 Certificate Folder)

  • Name(s):

  • 2.7 First Aid Kit Readily Available and Stocked Properly (attach photo)

  • 2.8 One-Site Health & Safety (Medic) Flyer Posted

  • 2.9 Urgent Care Map Posted

  • 2.10 Nearest Emergency Room Map Posted

  • 2.11 Place Designated for Cooling Off

  • 2.12 Muster / Rally Point Identified & Communicated to Workers

3.0 ELEVATED LEVELS

  • 3.1 Working at Elevated Levels

  • 3.2 Netting in Place on Permanent Guardrail

  • 3.3 Perimeter Lacing Installed on all Unsecured Shores to Prevent Accidentally Falling Out of Place

  • 3.4 Task Lighting / Daylight / Night Time Pours Walkways & Ladders

  • 3.5 Post Tension Cable Pulling Operations Protected with Barricades & Signs

  • 3.6 STAIRS BEING USED

  • 3. 7 Stairways Equipped with Handrails Installed Between 30-37"

  • 3.8 Metal Pan Stairs Filled with Wood or Concrete

  • 3.9 Stair Landings Lighted with Clear and Clean Access

  • 3.10 Scaffold Safety Awareness for Stair Towers

  • 3.11 Decking Being Performed

  • 3.12 Adequate Temporary Guardrails Installed Properly

  • 3.13 Hand Rails Installed Properly up to Leading Edge Barricades

  • 3.14 Horizontal Lifelines Installed Properly

  • 3.15 Fall Protection Required Beyond Signs In Place

  • 3.16 Orange Netting in Place for Active Deck

  • 3.17 Adequate Permanent Guardrails Installed Properly / Wood & Cable

  • 3.18 Holes 2 Inches or Wider Covered / Secured / Labeled

  • 3.19 Concrete Anchor Straps Ordered and of Proper Length

  • 3.20 In Addition to Guardrails, Elevator Shaft Cover Installed & Maintained Such that any UFI Worker will not Fall more than 25 Feet (attach photo of cover)

  • 3.21 Is Stripping Formwork Being Done

  • 3.22 OSHA Planks Being Used

  • 3.23 Stripping Nets in Good Shape

  • 3.24 Ground Level Barricades with Signs and Spotter(s)

  • 3.25 Lower Level Controlled Access Zone Set up Properly During Stripping Process

  • 3.26 Stripping Signs Posted with area Barricaded

  • 3.27 Fall Hazard Areas Barricaded Properly with Signage

4.0 PERSONAL PROTECTIVE EQUIPMENT

  • 4.1 Hearing Protection being Used Where Required (Pans / Grinding / Chipping / Blowing off Deck / Assembling Tables)

  • 4.2 Safety Helmet Tightly Attached and Secured Under the Chin, With No More Than 2-finger Gap Between Strap & Chin

  • 4.3 Clear Glasses being used Inside Building

  • 4.4 Respirator Being Used (Double Strap or Pink Half Face)

  • 4.4.1 Training on Vacuums, Grinder Shroud, Emptying Bag, Sweeping, Drilling, Chipping with Water

  • 4.4.2 Using more than 4 Hours per Day?

  • 4.4.3 Worn more than 30 Days Per Year?

  • 4.4.4 Fit Test Current (Required Every 12 months. Verify Certificate on Dropbox)

  • Medical Clearance Required (Chest X-Ray, OSHA Medical Questionnaire, Lung Capacity Test, TB Test) (Schedule with Tom)

  • 4.5 Full Body Harness Worn Correctly (Leg Straps in Rubber Band Keeper)

  • 4.6 Retractable Lifelines Removed from Service if Defective

  • 4.7 Hand Protection - Task and General Contractor Specific

  • 4.9 Foot Protection (Sturdy work boots, cover heal) (General Contractor Specific)

  • 4.10 Employees Aware of Metal Inserts for Boots (Nail Punctures)

  • 4.11 Proper Clothing, Hi-Viz Vests or Shirt (General Contractor Specific)

5.0 CONCRETE CONSTRUCTION

  • 5.1 Generators Being Used

  • 5.2 Fire Extinguisher (10#) Easily Accessible with Red Flag / Certification Current / Properly Charged

  • 5.3 Employees Aware of Shut Down and Refueling Procedure (shut off during breaks, then refuel once break is over)

  • 5.4 Proper Funnel being used to Re-Fuel

  • 5.5 Placed on Firm and well Ventilated Area

  • 5.6 Is the Generator Located on Dirt

  • 5.7 Plywood Under Generator

  • Per SWPPP requirements and Florida statute, anything that is fuel powered that cannot drive must have protection between the equipment and the bare earth to prevent groundwater contamination.

  • 5.8 Impalement Protection In Place

  • 5.9 Concrete Being Placed?

  • 5.10 Eye-Wash Station Available for Current & Future Concrete Pours

  • 5.11 Washing Facilities Provide with Clean Water, Non-Alkaline Soap, and Clean Towels. Readily Accessible to Exposed Employees and Adequate for the Number of Employees Exposed

  • 5.12 Proper Gloves and Waterproof Boots Provided (high enough to prevent wet cement from getting inside)

  • 5.13 Training Provided and Hazards of Exposure to Portland Cement Communicated to Employees. Review SDS

  • 5.14 Two Week Look Ahead for Elevation Changes for Upcoming Slabs: Verify Proper Equipment such as Ladders, Stripping Bars, Stripping Nets, Concrete Tie Off Straps, Styrofoam for Tables, Table Leg Adjustment, PVC for HLL, Etc...)

  • 5.15 Will Employee's Be Changing Task in the Next Week? Example: end of job, break down, loading trucks, banding material, remedial work.

  • 5.16 Do Employee's Have Proper P.P.E. (nail plates, gloves,)

  • 5.17 Have Employee's Received Training and Hazard Awareness for this new Task?

6.0 HOUSEKEEPING

  • 6.1 Work Space Clean & Free From Excess Trash / Nails / Debris from Cutting Wood / Banding

  • 6.2 Materials Stored and Stacked on Firm Foundation at Least 10 Feet from Edge of Slab

  • 6.3 Garbage Receptacle Outside Office / Emptied at Regular Intervals?

  • 6.4 Walkways Clear

7.0 LADDERS & STAIRWAYS

  • 7.0 STEP LADDER BEING USED

  • 7.1 Labels in Place and Readable

  • 7.2 Anti-Slip Rubber Feet Not Worn, Torn or Missing

  • 7.3 Areas Around Top & Bottom of Ladder Clear

  • 7.4 Side Rails Not Split or Broken

  • 7.5 Steps Clean, Free of all Oil, Grease, Dirt, Paint, Not Bent, Connections all Tight

  • 7.6 Ladders Being Used on Stable & Level Surface

  • 7.7 Can the Job be Done Without Using the Top Step of a Ladder

  • 7.8 Used Correctly (Opened with Spreaders Locked Securely)

  • 7.9 Does the Ladder's Length Allow to Safely Reach the Work Area

  • 7.10 EXTENSION or STRAIT LADDERS BEING USED

  • 7.10 Labels in Place and Readable

  • 7.11 Anti-Slip Rubber Feet Not Worn, Torn or Missing

  • 7.12 Areas Around Top & Bottom of Ladder Clear

  • 7.13 Side Rails Not Split or Broken

  • 7.14 Steps Clean, Free of all Oil, Grease, Dirt, Paint, Not Bent, Connections all Tight

  • 7.15 Ladders Being Used on Stable & Level Surface

  • 7.16 Is the Ladder able to use the 4-1 Rule? And Does it Extend at Least Three Feet Above the Landing

  • 7.17 Extension Ladder Sections not Separated

  • 7.18 Secured / Walk-Thru Grab Bars (temporary deck access only)

  • 7.19 Does the Ladder's Length Allow to Safely Reach the Work Area

  • 7.20 Locks Functional, Flippers in Place and Clear of Debris

  • 7.21 Rope Connected to Fly Section of the Ladder and not Worn, Torn or Frayed

  • 7.22 Pull Rope in Place so Employees can Safely Lift Tools or Equipment to Upper Levels

  • 7.23 PODIUM or PLATFORM LADDERS BEING USED

  • PODIUM (Has a wider work platform (20") than a platform ladder (15") and extend 3 feet above the height of the platform)

  • 7.24 Areas Around Top & Bottom of Ladder Clear

  • 7.25 Side Rails Not Split or Broken

  • 7.26 Gate Attachment Properly Assembled & Used (Podium Only)

  • 7.27 Steps Clean, Free of all Oil, Grease, Dirt, Paint, Not Bent, Connections all Tight

  • 7.28 Ladders Being Used on Stable & Level Surface

  • 7.29 Used Correctly (Opened with Spreaders Locked Securely)

  • 7.30 Anti-Slip Rubber Feet Not Worn, Torn or Missing

  • 7.31 Labels in Place and Readable

  • 7.32 More Than One Single Ladder OR One Double Gang (Two Way) Ladder for 25 or more People on any Level

  • 7.33 Safe Access to Dumpsters / Concrete Buckets

  • 7.34 Safe Access to Flatbed Trailer (Red Ladder)

9.0 HAZARD COMMUNICATION

  • 9.1 Employees Trained

  • 9.2 Chemical Drums (55 Gallon) Stored on Pallet and Secured

  • 9.3 SDS Readily Available (Site Specific) (Dropbox Updated)

  • 9.4 Chemical Contents Clearly Labeled as to Contents / Form Oil / Diesel / Gasoline / Curing Compound

10. TOOLS & EQUIPMENT

  • 10.1 Broken Tools Removed from Service / Tagged Out

  • 10.2 Hand Tools Observed in Good Shape

  • 10.3 Air Compressor Being Used

  • 10.4 Shut Off Valve on Blow Pipe

  • 10.5 Condition of Hoses

  • 10.6 Whip Checks in Place to Prevent Accidental Disconnect

  • 10.7 Face Shields being Used While Blowing off Deck

  • 10.8 Electrical Cords in Good Repair, without Damage to the Outer Jacket Insulation, Plugs, or Pins

  • 10.9 Hammer Head in Good Shape with no Grinder Cuts

  • 10.10 Side Handles & Guards In Place on Grinders and Drills

  • 10.11 Saw Horse Being Used / Top Plate Inspected for Proper Blade Adjustment

  • 10.12 Name of Employee Questioned About the Morning's Pre-Task Meeting - Emphasis on Small Tools and Warning Signs for Heat Exposure.

  • 10.13 Was the Answer Satisfactory

11.0 FUTURE USE

12.0 FIRE PROTECTION

  • 12.1 Diesel Tank Being Used for Heavy Equipment

  • 12.2 Properly Barricaded from Construction Traffic

  • 12.3 No Smoking Sign Posted

  • 12.4 Fire Extinguisher (20#) no Further than 75 Feet, Mounted on Sign Stand with Red Flag / Properly Charged

  • 12.5 Bonding Strap Available for Transferring Diesel

  • (Transfer of Category 1, 2, or 3 flammable liquids from one container to another shall be done only when containers are electrically interconnected (bonded).

  • 12.6 Tank Inside a Bath Tub (required by Skanska and Turner)

  • 12.7 Flammable Storage Tank Used for More Than 25 Gallons of Fuel

  • 12.8 5 Gallon Safety Can Not Dented with Flash Arrestor Screen Inside Neck

  • 12.9 Is There a Chopsaw Being Used

  • 12.10 Fire Extinguisher (10#) Easily Accessible with Red Flag / Certification Current / Properly Charged

  • 12.11 Faceshield Being Used with Safety Glasses

  • 12.12 Is There a Torch Set Being Used

  • 12.13 Fire Extinguisher (10#) Easily Accessible with Red Flag / Certification Current / Properly Charged

  • 12.14 Torch Set / Gauges / Flash Back Arrestors / Hose Condition /

  • 12.15 Oxygen & Acetylene Tanks Properly Stored

14.0 EXCAVATIONS

  • 14.1 Excavation Work Being Done

  • 14.2 Inspection Completed & Documented

  • 14.3 Heavy Equipment Evaluations Completed for Qualified Operators

  • 14.4 Is Compressor Being Used to Chip Pile Caps

  • 14.5 Proper P.P.E. Being Used

  • 14.6 Employees Aware of Hazards

  • 14.7 Training Completed

15.0 CRANE, RIGGING & LIFTING EQUIPMENT

  • 15.1 Crane Being Used

  • 15.2 Mobile Crane Swing Radius Barricaded

  • 15.3 Base of Tower Crane Enclosed and Capable of Being Locked After Hours

  • 15.4 Crane Radius Plan Available

  • 15.5 Nylon Straps Condition (no red yarn showing, legible ID Tag)

  • 15.6 Port-A-John with Proper Rigging (legible tag)

  • 15.7 Qualified Crane Signal Person/Rigger Identified with Orange Brim Guard

  • 15.8 Concrete Column Bucket (wire rope, tag legible, shackle cotter pin)

  • 15.9 Chain Sling condition (tag in place and legible, hooks)?

  • 15.10 Skip Pan / Wire Rope / Shackles / Weight Limits Legible

  • 15.11 Tag Lines of Proper Length for Specific Tasks

16.0 OUTRIGGER

  • Is Outrigger Being Used

  • 16.1 Guardrail systems are in place and at proper height?

  • 16.2 Plywood Installed on Both Sides at Landing Area - Top to Bottom

  • 16.3 Double 2x4 In Place at the End of Outrigger?

  • 16.4 Tie off Anchors Identified and in Place?

  • 16.5 Orange Cones and Cone Bars in Place Around Entrance of Outrigger?

  • 16.6 Shackle Pins Fixed from Rotation?

  • 16.7 Fall Protection Required Beyond this Point Sign in Place at Entry?

  • 16.8 Blue Notice Sign 5,000 Pound Cart Load in Place?

EMAIL AUDIT TO THE FOLLOWING:

  • Project Manager, General Sup't, Project Sup't and copy Todd Volheim, Bill Nagele, Heman Higgins, Tom Isola

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.