Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Add media

Notices displayed

  • Health and safety law

  • She policy statements

  • Site Specific RAMS in place and available

  • Reversing Vechicles

  • Employers Liability insurance

  • Emergency Evacuation Procedure

  • First Aider(s)

  • Project Notices

  • Site Rules

  • F10

Registers

  • Plant Hire Register

  • IPAF Register

  • PAT Testing Register

  • Plant Inspection Sheet

Site Safety Audits

  • Weekly Site Safety Audits carried out

  • PASMA Inspection forms completed

  • Observation of task forms completed

  • Site Induction Sheets completed,NTH & Main Contractor

  • Daily Signing in Sheet completed including Site Labour Sheet

  • Hand & Arm Vibration Sheet Completed

  • RAMS Acknowledgement Sheet Signed by all Operatives including Sub-Contractors

  • Accident Reports Completed

Welfare Facilities

  • Canteen

  • Drying Room

  • Toilets

  • Hot Food Available or the Facility to make hot food

Site Entry

  • Traffic Management

  • Public Safety

  • Relevant Site Signage in Place

  • Donseed in operation

Site Tidiness

  • Access & Egress

  • House Keeping

  • Storage

  • Tripping Hazards

Fire Precautions

  • Office Exstinguishers

  • Work Place Extinguishers

  • Hot Works Permits

  • Storage of Flammables on site

  • Site Fire Plan

  • Fire Risk Assessment

  • Means of escape

  • Relevant/Statutory Signs

PPE

  • Appropriate PPE worn by all trades

  • Helmets

  • Footwear

  • Hi Viz Vests

  • Safety Glasses

  • Gloves

  • Respiratory devices

  • Ear Defenders

  • Safety Harnesses

Plant

  • Plant being used in a correct and safe manner

  • Suitable PPE being worn by plant operatives

  • Plant warning beacons in operation where applicable

Excavations

  • Appropriate edge protection

  • Is there appropriate shoring in place

  • Is there a safe working procedure implemented

Site Power

  • Work permits are they required

  • Site Transformers

  • Distribution Boards

  • Site lighting/Emergency Lighting

  • Task Lighting

  • Trailing leads

Floor Openings

  • Provision of protection

  • Relevant Signage

Waste

  • Provision of skips

  • Instructions on disposal

  • Recycling of materials regime in place

Noise

  • Relevant and appropriate signage in place

  • Appropriate ear protection being worn in designated areas

  • Operatives within 2m made aware of noise and wearing appropriate PPE

Asbestos

  • Asbestos survey/register in place

  • Asbestos clearance certificate available

  • Asbestos awareness training

Training

  • Adequate to tasks being under taken

  • All operatives carry a current CSCS,ECS card or equivalent

  • All operatives have and carry relevant and current licenses

  • Wayne Jones

Action Points

  • Action by / Date

  • Action
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.