Title Page

  • Document No.

  • Client / Site

  • Conducted on

  • Location
  • Prepared by

Inspection

  • All PIV inspection cards found to be completed and without issue.

  • PIV travel and flow consistent with training and PDC guidelines.

  • PPE utilized as per training (gloves when handling metal, gloves and face shield when changing batteries, etc.).

  • Aisles and intersections free and clear of all obstructions allowing for easy travel.

  • Fire exits, breaker boxes, fire extinguishers, eye wash and emergency shower free and clear of obstructions.

  • Parts properly stored in active and reserve locations (secure, stable, pushed in, etc.).

  • Battery stops in place to prevent battery from coming off of rollers.

  • No items present that could present a stored energy hazard ( leaning pallets, bars, pipes, etc.).

  • Electrical cords and battery cables in good order and free of cuts or other defects.

  • Comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.