Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site / Project office Presentation & Welfare
-
Is site housekeeping in good order?
-
Is the project office housekeeping in good order?
-
Is there adequate H&S / directional / awareness signage in place throughout site?
-
Are the welfare facilities set up correctly and being well managed?
Working Areas
-
Does the site have good access and egress throughout the live working areas?
-
Is there suitable excavation edge protection in place?
-
Is housekeeping in the working areas in good order?
-
Is the lighting adequate?
-
Are materials being stored correctly? Including COSHH materials.
-
Are all activities / tasks covered by approved RAMS?
Working at height
-
Is the temporary edge protection in place and in good order?
-
Is access equipment set up correctly? I.e handrails, guardrails
-
Are all lift shaft / stair core openings adequately closed off and protected with temporary edge protection?
-
Are operatives working as stated in the method statement whilst working at height?
Temporary Works
-
Is there a Temporary Works folder available in the site office?
-
Are all temporary work falsework systems been erected using the correct components?
-
Are all temporary work elements visible on site covered by a suitable design?
-
Have the site managers / supervisors the appropriate temporary works training / qualifications?
Fire and Emergency Procedures
-
Adequate fire points on site?
-
Are there task specific fire extinguishers next to the areas where hot works is taking place on site?
-
Fire escape plan in place and visible on the site notice boards?
Safety First Second Nature
-
Minimum Standards: Implemented and visible throughout site where applicable?
-
Leadership: Are contract managers / project managers visible & managing on site?
-
Engagement & Coordination: Company engagement, planning and coordinating Health & Safety with all other trades on site?
-
Behaviour: Is there any specific culture development / training been completed by the Client / JBS on site?
-
Work Environment: Overall Material Storage, Working Space, Access throughout, Welfare areas.
Conclusion
-
Comments / Actions
Sign Off
-
On site representative
-
Auditor's signature