Title Page
-
Audit Title
-
Document No.
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Contractor/Subcontractor
Positive Behaviors Observed/Actions taken to encourage safe behavior
-
undefined
-
undefined
-
undefined
Opportunities for Improvement
-
undefined
-
undefined
-
undefined
-
What topic(s) are you covering?
- Admin
- IIPP Assessment
- Disposal facility
- Aerial Scissor Lifts
- Asbestos
- Confined Space
- Cranes/ hoist
- Demolition
- Electrical Safety
- Excavation/ Trenching
- Fall Prevention/ Protection
- Fire Prevention/ Protection
- Hand and Power Tools
- Hazard Communication
- Heavy/Motorized Equipment
- Hot Works Operations
- Housekeeping
- Ladders/Stairs
- Material Handling
- Rigging
- Medical/First Aid/Emergency
- Occupational/Environmental
- PPE
- Scaffolding
- Site/Public Protection
- Steel Erection
- Heat Illness Prevention
- Wildfire Smoke
- JHA/Pre-Task Plan
Category: Administration
-
Accountability Plan Utilized
-
Annual Program Evaluation
-
Competent Person List
-
DART/TRC Compliance Goals Met
-
Employee Involvement
-
Incident Investigation Program
-
Monthly Reporting Up-To-Date
-
SDS Manual Current
-
Orientation Program Documented
-
Post-Incident Review Held
-
Pre-Con Meeting Documented
-
Return To Work Program
-
Safety Inspections Completed
-
Safety Recognition Program
Category: IIPP Assessment
-
Persons with authority and responsibility for implementing program are properly identified
-
System for ensuring employees comply with safe and healthful work practices
-
System for communicating with employees in a form readily understandable by all affected employees about safety and health
-
Procedures for identifying and evaluating workplace hazards to include scheduled inspections
-
Procedure to investigate occurrence of injuries or illnesses
-
Methods for correcting unsafe work conditions, work practices, in a timely manner based on seriousness of hazard
-
Training program to instruct on general and job-specific safety and health practices
-
Adequate documentation for inspections, training, and other standard-specific requirements
Category: Aerial/Scissor Lifts/Personnel Lift
-
Proper Clearance From Overhead Lines
-
Controls Legible and Functioning
-
Daily Inspections Documented
-
Fall Protection In Use
-
Equipment loaded properly
-
Gate Or Chain Secured
-
Surface Free Of Holes/Flat
-
Operators Trained
-
Area Below Protected
-
Nothing to increase height
Category: Asbestos
-
Area Air Monitoring Conducted
-
Worker Licenses Posted
-
SDS Manual Available
-
Manometer Present
-
HEPA Machine Cert. Available
-
Fire-Retardent Poly Used
-
Decon Established
-
Dumpster Secured
-
Fire Extinguisher Present
-
Emergency Response Plan
Category: Confined Space
-
Respiratory Protection
-
Entry Supervisor
-
Confined Space Inventory
-
Permit Posted/Completed
-
Proper PPE In Use
-
Authorized Entrant
-
Air Monitoring Conducted
-
Monitor Calibrated/In Use
-
Rescue Plan/Equipment Present
-
LOTO Required/Completed
-
Entry Trained/Documentation
-
Attendant Present
-
Adequate Ventilation
Category: Cranes and Hoisting Equipment
-
Signal Person Trained
-
Hoist/Lift Plan On File
-
Annual inspection current
-
Daily Inspections Documented
-
Valid Hoisting License
-
Load chart posted
-
Boom Angle Indicator On Crane
-
Operators Manual In Crane
-
Weight of load verified
-
Rigging Inspected/Rated/Tagged
-
Safety Latches On Hooks
-
Swing Radius Barricaded
-
Tag Lines Used
-
Proper Clearance from Overhead Lines
-
Crane Leveled On Firm Surface
-
Proper Sized Cribbing
-
No Overhead Loads
-
Fire extinguisher in crane
-
Load Secured/Rigged Properly
-
Outriggers Fully Extended
-
Anti-Two Block Device
-
Means of Communication
-
No Personnel under a load
Category: Demolition
-
Engineering Survey/Demolition Plan
-
Hazardous Materials Survey
-
Pre-Demo Checklist/Walkthru
-
Utilities Clearly ID'd/Protected
-
Demolition Debris Removed
-
Fire Protection Addressed
-
Systems Drained/Locked Out
-
Access Controlled/Restricted
-
Dust Control
-
Fall Protection In Use
-
Housekeeping/Access Maintained
-
Flamm/Comb Materials Removed
Category: Electrical Safety
-
Outlets/Panels Mounted Properly
-
LO/TO Procedures Verified
-
Generators Grounded
-
Energized Parts Protected
-
Cords In Good Condition
-
Cords Protected From Traffic
-
Elec Rooms/Panels Secured/Signage
-
Energized Work Procedure/NFPA 70E
-
GFCI's used
-
Circuits Labeled
-
Proper Temp Lighting/Guards/Cages
-
Knock-outs Covered/Protected
Category: Excavation and Trenching
-
Excavations >20' Engineered
-
Competent Person Present
-
Benched Appropriately (Type A/B Only)
-
All Utilities Marked (Markings Must Remain)
-
Utilities Protected/Supported
-
Daily Inspections Documented
-
Trench Box Installed Properly/Certs Available
-
Sloped/Shored Properly
-
4' Depth - Safe Access
-
>6 - Fall Protection Installed
-
Atmospheric Hazards
-
Perimerter Protection/Barricades
-
Soil Classified/Tested (A/B/C)
-
Spoils 2' From Edge
-
Surface Encumbrances Supported
-
Surface Traffic Exposure Controlled
-
Water Entering Excavation Controlled
-
Access Within 25'
Category: Fall Prevention and Protection
-
Top Rail 39-45"
-
Proper Anchor Points (5,000#)
-
Competent Person Present
-
Workers Trained/Docum
-
Equipment Inspected/Functioning
-
Falling Object Protection
-
Guardrails in Place (Floor/Wall Openings)
-
Hole Covers Adequate/Secured/Marked
-
Toeboards Present
-
Contolled Access Zone Established
-
Safe Ladder Use/Access
-
Rescue Provisions In Place
-
Harness/Lanyard Used Properly (PFAS)?
-
Stair/Ramp/Walkway Protected
-
Impalement Protection/Rebar Caps
Category: Fire Prevention and Protection
-
Emergency Vehicle Access
-
Extinguisher Charged/Inspected
-
Extinguisher Mounted/Signed Properly
-
Fire Suppression Equip Available
-
Fire Watch Present
-
Smoking in designated areas only
-
Proper Signs In Storage Area
-
Proper Liquid/Gas Storage
-
Proper Comb. Material Storage
-
No Propane Stored Indoors
-
Proper Fuel Containers Used
-
Tarps/Enclosures Flame Retardant
Category: Hand and Power Tools
-
Whip Checks Installed
-
Tool In Good Condition
-
Cords In Good Condition
-
Ground Prong/Double Insulated
-
Guards In Place
-
Manufacturer supplied handles used
-
Information Label On Tool
-
Proper Tool For The Job
-
Strain Relief Functioning
-
Emergency Shut-Off Switch
-
Signage for Laser
-
Powder Actuated Used Appropiately
Category: Hazard Communication
-
Employees Trained
-
SDS Readily available
-
SDS (site specific)
-
PPE per SDS
-
Proper Labels On Containers
-
Inventory List
Category: Heavy/Motorized Equipment
-
ROPS (Roll-Over Protection)
-
Moving Parts Guarded
-
Inspections Completed
-
Training Documentation Available
-
Flagman Used If Applicable
-
Equipment Manual Available
-
Back-Up Alarm Functioning
-
Seat Belts Used
-
Hoisting/Operator's Licenses
-
Glass free of obstructions
-
Horn functioning
-
Strobe Lights
-
Secure loads prior to transport
Category: Hot Work Operations
-
Fire Extinguisher Present
-
Flamm/Comb Materials Removed
-
Bottles Upright/Capped/Secured
-
CG Cylinders Stored Properly
-
Flash Arrest On Torches
-
Welding Screens Provided
-
Gauges Working Properly
-
Leads In Good Condition
-
Proper PPE In Use
-
Torch Hoses in Good Condition
-
Welding Machine Ventilated
-
Hot Work Permit Issued/Posted
-
Fire Watch Present
-
Lead Terminals Covered
Category: Housekeeping
-
Work Area Clean
-
Clear Access to Building/Site
-
Cords/Hoses On Floor/Walkway
-
Proper Material Storage
-
Slip/Trip/Fall Hazards
-
Walkways/Aisles Clear & Clean
-
Designated employee parking
-
Impalement protection
-
Roadway Around Project Clear
-
Trash In Protected Containers
Category: Ladders/Stairs
-
Ladder Set-Up Appropriate
-
3-Points Of Contact Maintained
-
Extend 3' Above Landing
-
Safe Access Break > 19"(>18"Cal)
-
Extension Ladder 4:1 Pitch
-
Inspected For Defects
-
Job-Made Ladders Built Properly
-
Ladders Secured In Place
-
Proper Use Of Ladder
-
Coral/Gate/Offset at Landing
-
Top/Bottom Of Ladders Clear
-
Safe Work Distance From Hazards
-
Stair/Handrails Present (36-37")
-
Landings And Stair Treads Filled
-
Stairs Illuminated
-
Slip Trip Exposure Eliminated
Category: Material Handling
-
Assistance for Heavy/Awkward Items
-
Use of Mechanical Aid
-
No personnel under a load
-
Safe/Efficient Work Station
-
Proper Lifting Technique
-
Pre-Fabrication Possible?
-
No Twisting
-
No Over-Reaching
-
Material Stored On Rack/Dolly/Etc
-
Manual Lifting In 'Power-Zone'
-
Clear Paths/Housekeeping
Category: Medical/1st Aid/Emergency
-
Team Contact Numbers
-
Exits Marked/Signed
-
Address Displayed On Perimeter
-
Adequate 1st Aid Kits
-
Eye Wash Station
-
Coordination With Local FD
-
Emergency Action/Crisis Management Plan
-
Emergency Numbers Posted
-
First-Aid/CPR On Site
-
Map to Medical Facility
Category: Occupational & Environmental
-
Ventilation Adequate
-
Containers labeled
-
Signage for Lead/Asbestos Posted
-
Proper Lighting
-
Hand Washing Station Present
-
Hazardous Material Properly Stored
-
Eye Wash Present
-
Asbestos/Lead/Mold/Silica
-
Moisture Control Plan in Place
-
Noise Exposure/Monitoring
-
Nuisance dust
-
Concrete cut wet & vacuumed
-
Air Monitoring for Contaminant
-
Silica Control Plan in Place
-
Spill Containment Adequate
-
SWPP In Place
Category: P.P.E
-
Safety Goggles
-
Face Shield
-
Safety Glasses
-
Gloves
-
Metatarsal protection
-
Hard Hats
-
Hearing Protection
-
High Visibility Clothing/Reflective Vest
-
Foot Protection
-
Proper Clothing
-
Respiratory Protection
Category: Scaffolding
-
Toeboards
-
Competent Person Present
-
Suspended Scaffold Tiebacks
-
Guardrails Installed
-
Falling Object Protection
-
Rolling Scaffold Brakes Set
-
Inspection Daily & Documented
-
Properly Secured To Structure/Tie-Backs
-
Access To Scaffold Appropriate
-
Proper Height To Base Ratio
-
Bracing And Pins In Place
-
Compatible Components Used
-
Fully Planked
-
Proper Loading Of Materials
-
Sills, Plates, Jacks Installed
-
Surface In Safe Condition
-
Proper Clearance From Overhead Lines
- Compliant
- Improve it
- Reoccurring
- N/A
Category: Site/Public Protection
-
Traffic Control Plan
-
Walkways Clear
-
Falling Object/Overhead Protection
-
Public Protection Signage
-
Pedestrian Crosswalk Appropriate
-
Adequate Lighting
-
Security Systems In Place
-
Access Restricted
-
Police Detail Present
-
Walkways Delineated/Protected
-
Excavations protected
-
Site/Perimeter Fences
-
Fencing Secured/Weighted
-
Barricades Installed Properly
Category: Steel Erection
-
Anchorage Points Meet Requirement
-
Written Approval Concrete Strength
-
Structural Flooring Requirements
-
Site-Specific Steel Erection Plan
-
Site Layout/Sequence Plan
-
Proper Anchorage Of Columns/Beams
-
Multi Lift/Rigging/Connector Training
-
Multi Lift Procedure Utilized
-
Falling Object Protection
-
Fall Protection Training Provided
-
Erector Notified Of Modification
-
CDZ Training/Utilized
Disposal Facility
-
Danger Signs Posted
-
Daily Log Posted
-
Critical Barriers Established
-
Contractor License Valid
-
Personal Air Samples Posted
-
Work Plan Submitted
Heat Illness Prevention
-
Heat Illness Prevention Program in place
-
Cool, clean potable water available
-
Competent person assigned
-
Acclimatization
-
Heat Wave Procedures
-
Heat Wave Procedure
-
High Heat Procedure
-
Personnel training
Wildfire Smoke
-
Program in place
-
Identification of Harmful Exposure
-
Exposure Communicated to employees
-
Control of Harmful Exposure in Place
-
Personnel Trained
-
Other
Rigging Components
-
Missing or Illegible Identification/Tag
-
Excessive wear, nicks, cuts, gouges
-
Acid or caustic burns
-
Melting or charring of any part of the sling (Nylon)
-
Broken or worn stitching on load bearing splice
-
Discoloration and brittle - Ultraviolet/Sunlight damage
-
Broken wires (wire rope)
-
Kinking, crushing, bird caging (Wire rope)
-
Heat damage/Weld spatter, arc strike
-
Severe corrosion
-
Cracks or bent components
-
Damaged hardware/ missing hardware
Pre-Task Plan/JHA
-
Pre-Task Plan/JHA Available
-
Pre-Task Plan/JHA Complete
-
All Crew members participate in Pre-Task Plan/JHA development
-
Pre-Task Plan revisited when task changes