Information
-
PPPL ES&H Project Safety Inspection
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Details
-
Site / Project Name
-
Use this audit to assess the following aspects of this site as Safe, At Risk or Not Applicable. Unsafe response indicate that attention is required to bring items to a satisfactory standard. Notes and photos should be attached where appropriate, particularly to At Risk items.
Documentation
-
Do you wish to examine documentation on this safety walk?
-
JHA filled out and available
-
Pre task plan completed
Work Areas
-
Do you wish to examine housekeeping of work areas on this safety walk?
-
General Housekeeping (neat, tidy, dust free)
-
Walkways (free of debris and obstructions)
-
Work Surfaces (clear of clutter)
-
Sides or Holes (safety guards or covered with label)
-
Impalement Hazards (none present, or adequately marked/protected)
-
Material Storage/Lay Down (neat and tidy)
-
Barricades and signage in place (as required)
Personal Protective Equipment (PPE)
-
Do you wish to examine PPE on this safety walk?
-
Hard Hats or Helmets being worn
-
Safety Glasses with Side Shields being worn
-
Face Shield / Goggles (available and worn when applicable)
-
Respiratory Protection (task appropriate, in good condition, and worn when applicable)
-
Hearing Protection (available and worn when applicable)
-
Appropriate Hi-Vis Clothing
-
Gloves (being worn and task appropriate)
-
Foot Protection (safety toe footwear required at all times)
Fall Protection Equipment
-
Do you wish to examine fall protection equipment on this safety walk?
-
Fall protection equipment inspected inspected regularly and before use
-
Appropriate for task and used properly by crew where applicable
-
Suitable Anchorage Points
-
Fall Rescue Plan available?
Ladders
-
Do you wish to examine ladders on this safety walk?
-
Inspected prior to use
-
Ladders are well maintained and in satisfactory condition
-
Ladder base, footing and set up is to standard
-
Proper Ladder for Task
Scaffolding
-
Do you wish to examine scaffolding on this safety walk?
-
Users have competent person training
-
Scaffolding is appropriately tagged and inspected
-
Guardrails and Toeboards installed
-
Pins and retaining clips installed
-
Platform/Decking secured
-
Appropriate leveling or footing installed
-
Proper access/egress
Tools and Equipment
-
Do you wish to examine tools and equipment on this safety walk?
-
General condition of tools
-
Guards are in place
-
Proper tools being used for task
-
Equipment inspected prior to use and recorded
-
Spotter in use (when applicable)
Excavations
-
Do you wish to examine excavations on this safety walk?
-
Access/Egress is safe and frequency of egress is acceptable (25 ft)
-
Excavation/Trench exceeds 5 ft
-
Proper shoring/shielding or bench/slope in place
-
Barricades are in place as required
-
Spoil Pile, materials, and equipment at least 2 ft from excavation/trench
-
Water accumulation in excavation
Electrical Safety
-
Do you wish to examine electrical safety on this safety walk?
-
Ground fault circuit interrupters in use
-
Extension Cords are in good condition and not causing trip hazards or used inappropriately
-
Power Tools are undamaged and being used fit for purpose
-
Lock out/Tag out perform
-
Proper locks and tags in use
Cranes and Rigging/Signaling
-
Do you wish to check cranes and rigging/signaling this safety walk?
-
Rigging inspected for damage and capacity tags
-
Hooks and latches inspected
-
Tag lines in use
-
Chainfalls/Come-alongs inspected
-
No working under lifted materials
-
Crane swing radius no access zone
-
Proper signaling in use
Hot Work/Fire Safety
-
Do you wish to examine hot work and fire safety at this inspection?
-
Hot work permit in place
-
Fire watch in place (1 hour after hot work is completed)
-
Fire extinguisher present near area where hot work is being performed (20 lb ABC minimum)
-
Hot work area clear of combustable materials
-
Gas Cylinders are properly stored (upright and secured when in use; caps on, regulators off, secured and separated when not.)
-
Hoses, regulators, and flashback arrestors are installed properly and free of damage
Confined Space
-
Do you wish to examine confined space safety at this inspection?
-
Entrants and attendants have training
-
Permit is in place (if required)
-
Air monitoring being performed (if required)
-
Retrieval gear and harness in use and inspected
-
Lock out/Tag out performed before entry
-
Systems locked out have proper tags and locks
Chemicals
-
Do you wish to examine chemical safety at this inspection?
-
SDS submitted for chemical
-
Chemicals properly stored onsite
-
Correct PPE in use while working with chemicals
Concrete Work
-
Do you wish to examine concrete work safety at this inspection?
-
Silica control plan in use
-
Correct PPE in use
Positive Observations
-
Do you wish to report any positive observations made during the inspection?
-
Add description
-
Add photos
General Comments
-
Any further comments or recommendations arising from this inspection?
-
Add any additional relevant photos
-
Have all required corrective actions been added as Actions to this inspection?
-
Please add any corrective actions to the appropriate questions above before completing this report
Sign Off
-
Name & Signature of Inspector
-
Name & Signature of Site Supervisor / Foreman