Title Page
-
Survey Location
-
Rainbow International Ref / Job Number
-
Conducted on
-
Prepared by
-
External Photo of Property
-
Instruction Description
Primary Checks
Initial findings
-
Description of what has happened and damage caused.
-
Has then been an escape of water?
-
Has the leak been fixed?
-
Is trace and access needed to find leak?
-
Why is this needed?
-
is a plumber needed to fix leak?
-
what is needed?
-
Are the Electrics safe to use?
-
What is needed to make safe?
Mould contamination
-
Is there mould contamination?
-
Areas affected by mould.
-
Levels of mould contamination.
- Good
- Moderate
- Unhealthy for sensitive groups
- Unhealthy
- Very unhealthy
- Hazardous
Manifestations
-
Location / Room
-
Screenshot of room size.
-
Description of damage
-
Evidence
-
Excessive Moisture (e.g. WME/MC/REL)
-
Readings WME/MC/REL etc.
-
Evidence Readings
Strip Out Works
-
Are strip out works needed to aid the drying.
-
Is a Electrician needed?
-
What is needed?
-
Is a plumber needed?
-
What is needed?
-
Is a builder needed for strip out works?
-
What is needed ?
-
Is hire equipment needed?
-
What is needed ?
-
Is Contents storage needed?
-
What is needed ?
Builders information
-
Is flooring replacement needed?
-
What is the flooring type?
-
Is this continuous into other areas with outdoor bars?
-
list areas.
-
Do skirting boards need replacement?
-
Skirting board height
-
Pictures of skirting boards.
-
Is redecorating needed?
-
Which rooms are in need of redecoration?
-
what is the wall colour?
-
Are kitchen units damaged?
-
How many units need to be replaced?
-
Pictures of all damaged units.
-
do kick boards need to be replaced?
Drying
-
Is drying needed?
-
Estimate drying times after strip out works if needed.
-
What type of drying is needed?
- Standard drying
- Wall injection drying
- floor injection drying
- Wall & floor injection drying
-
what Equipment is needed?
Rainbow information
-
Is there further works needed from Rainbow technicians?
-
What is needed?