Title Page
-
Store Name.
-
Store Number.
-
PPM SOP Reference number(s).
- R1 ... Packs and condensing unit maintenance.
- R2 ... Gas condenser maintenance .
- R5 ... Integral maintenance.
- R7 ... Coldroom maintenance.
- R14 ... PRV Inspection
- R13 ... Refrigeration gas compliance.
- E1 ... Routine Electrical Testing
- E2 ... Earth Loop Impedance Testing
- E3 ... RCCD Testing
- E4 ... Power Factor Correction check.
- E5 ... Generator Off Load Test.
- E7 ... Electrical Vehicle Charging Post.
- HV1 ... All HVAC Equipment.
- HV4 ... Dosing Pot / Water Sampling.
- HV/R1 ... HVAC Equipment containing refrigerants.
- G1 ... Gas Safety Inspection.
- G2 ... Gas Pipework Inspection. (CP15).
- P1 ... All Water and Heating Pumps
- P2 ... Cold Water Tanks.
- P3 ... Pressurisation Units and Pressures Vessels.
- P4 ... Calorifier and Immersion Heaters.
- P5 ... PRV Inspection.
- P6 ... All water pipework and fittings.
- P7a ... Water Softener.
- P7b ... Electrolytic Water Conditioner.
- P8 ... Water Temperature Outlet Check.
-
Metix Task Number(s).
-
Verisae Task Number(s).
-
Engineer
-
BEFORE STARTING WORK, RISK ASSESS YOUR WORKING AREA AND ENSURE YOU COMPLY WITH ALL HEALTH & SAFETY REGULATIONS.
-
Ensure you log on and off of Verisae in real time.
-
Enter the PPM SOP Reference number.
- R1 ... Packs and condensing unit maintenance.
- R2 ... Gas condenser maintenance .
- R5 ... Integral maintenance.
- R7 ... Coldroom maintenance.
- R14 ... PRV Inspection
- R13 ... Refrigeration gas compliance.
- E1 ... Routine Electrical Testing
- E2 ... Earth Loop Impedance Testing
- E3 ... RCCD Testing
- E4 ... Power Factor Correction check.
- E5 ... Generator Off Load Test.
- E7 ... Electrical Vehicle Charging Post.
- HV1 ... All HVAC Equipment.
- HV4 ... Dosing Pot / Water Sampling.
- HV/R1 ... HVAC Equipment containing refrigerants.
- G1 ... Gas Safety Inspection.
- G2 ... Gas Pipework Inspection. (CP15).
- P1 ... All Water and Heating Pumps
- P2 ... Cold Water Tanks.
- P3 ... Pressurisation Units and Pressures Vessels.
- P4 ... Calorifier and Immersion Heaters.
- P5 ... PRV Inspection.
- P6 ... All water pipework and fittings.
- P7a ... Water Softener.
- P7b ... Electrolytic Water Conditioner.
- P8 ... Water Temperature Outlet Check.
-
Do you need to order any spare parts to complete the PPM?
-
Do you need to arrange a return visit to complete the work?
-
If a return visit is required, please briefly explain why.
-
If a return visit is required, please call the PPM team/SME to arrange a date for a retun visit to complete the work once all spares are available.
-
Is the PPM complete?
-
Does any of the equipment need adding to the delapidation list?
-
Space for you to add any further information.
-
Store Managers Name and Signature.