Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location & Store Number
Sainsburys Top Stocking Sign Off
Site Set up
-
Have you signed in with the store and received instructions regarding the Fire Muster point?
-
Do you have your Site File which includes RA+MS documents, insurances, H&S policy
-
Do you have access to a first aid kit & eyewash? Please do a weekly check that the contents are in date
-
Do all operatives have 3 point PPE - Boots, Hi Viz & Gloves
-
Have you segregated the work area with barriers?
-
Are there suitable arrangements for disposing of waste?
Gables
-
How many Grey Gables have you been asked to install on the Scope of Works
-
Have all Grey Gabes been fitted
-
Please take photos of all the Grey Gables fitted
-
Please list details of any snagging on Grey Gables. (Please list any equipment required to complete the job)
-
Have you been asked to fit any Orange Gables
-
Have all Orange Gabes been fitted
-
Please take photos of the orange gables fitted
-
Please take photos of the orange gables fitted
-
Please list details of any snagging on Orange Gables. (Please list any equipment required to complete the job)
-
Have you been asked to fit any Copper Gables
-
Have all Copper Gabes been fitted
-
Please take photos of the Copper Gables fitted
-
Please take photos of the copper gables fitted
-
Please list details of any snagging on Copper Gables. (Please list any equipment required to complete the job)
-
Have you been asked to fit any Yellow Gables
-
Have all Yellow Gabes been fitted
-
Please take photos of the yellow gables fitted
-
Please take photos of yellow gables fitted
-
Please list details of any snagging on Yellow Gables. (Please list any equipment required to complete the job)
-
Have you been asked to fit any Blue Gables
-
Have all Blue Gabes been fitted
-
Please take photos of the blue gables fitted
-
Please take photos of the blue gables fitted
-
Please list details of any snagging on Blue Gables. (Please list any equipment required to complete the job)
INQ
-
Have you been asked to remove any INQ bays - Provide photo of existing INQ
-
Have all INQ bay been removed
-
Have all floor bolt holes been filled - Picture required of under each post
-
Any other comments regarding the INQ
Existing Equipment
-
Have all existing equipment been palletised and banded ready for collection?
-
Please take photos of the palletised equipment
General
-
Any other comments
-
Have you walked the shop floor with the manager to identify and confirm all the gable locations?
-
Have all gables been fitted to locations on the plan
-
Give details of reason why and actual locations
Obstructions
-
Are there any fitted gables where ceiling obstructions ( light track/aisle Sign) which prevents the header from opening?
-
Give details of which gable are affected
-
If a gable is obstructed and is prevented from opening, have you screwed this shut to prevent potential damage
Sign Off
-
Has all packaging and rubbish been disposed of?
-
RMS Representative
-
Store Manager / Site Representative