Title Page

  • Conducted on

  • Prepared by

  • Location
  • Client/Site

  • Site Contact Name

  • Site Contact Phone Number

  • Site Contact Mobile Number

  • Site Contact email

  • Decision Maker Name

  • Decision Maker Phone Number

  • Decision Maker Mobile Number

  • Decision Maker email

Checklist

  • Ensure all balls are emptied from hopper

  • Switch of Power Tee ensuring the tee is in its lowered position.

  • Replace Control Panel stand covers

  • Winch trailer back to full height.

  • Lock Pins.

  • Take off winch strain.

  • Winch tow bar electric winch to full height.

  • Drive truck tow bar into position to load the trailer.

  • Lower trailer onto the tow bar via electric tow bar winch.

  • Lock the trailer in place with the padlock.

  • Attach the chains back on to the truck.

  • Attach the lights power lead to the truck.

  • Take photos of the truck and trailer before setting off.

  • Signed

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.