Information

  • PWD/ROICC/OICC/FSC Office:

  • Conducted on

  • Final overall score (Equals lowest rating for any one category):

  • Location
  • Contractor

  • Contract % complete:

  • Total monthly man-hours:

  • Contract title:

  • QC Manager:

  • Total cumlative man-hours:

  • Superintendent:

  • Person completing inspection:

  • Site Safety Health Officer (SSHO):

  • SSHO Level (1), (2), (3), (4), (5), or (6)

  • Questions answered "NO" are to be entered into the Site Safety and Occupational Health Deficiency Tracking System for correction (Refer to EM 385-1-1 01.A.12.d)

Preparatory Phase/ORM Planning

  • 1. Accepted Accident Prevention Plan (APP) on-site and updated to reflect current management?

  • 2. Applicable UFGS 013526 available in site?

  • 3. Competent Person employed full time as Site Safety and Health Officer (SSHO) unless specified differently in contract?

  • 4. SSHO on site at all times when work is being performed?

  • 5. Safety inspections/audits conducted by competent persons, of the work site, material, and equipment documented in writing and available on request?

  • 6. Safety and health bulletin board erected in area commonly accessed and in clear view of the on-site workers?

  • 7. Safety and occupational health deficiency tracking system established and updated daily (Refer EM 385-1-1 01.A12.d)?

  • 8. Qualified person conducting /documenting all training, meetings and indoctrination for new employees?

  • 9. Activity hazard analysis (AHA) with competent person identified and proof of qualifications attached and accepted by government designated authority for each work activity on site?

  • 10. Work not started until activity hazard analysis reviewed by contractor, subcontractor(s) and government on-site representatives during preparation and initial phase meeting?

  • 11. Are required weekly safety meetings for all workers to review past activities, plan for new or changed operations, review AHA's by trade, establish safe working procedures for upcoming hazards, provide safety and health training being held and documented?

  • 12. Are required monthly safety meetings for all supervisors on the project location to review past activities, plan for new or changed operations reviewed AHAs by trade, establish safe working procedures for upcoming hazards, provide safety and health training being held and documented?

  • 13. Witten hazard communication program submitted and implemented IAW EM 385-1-1 section 06.B.01?

  • 14. MSDS for each hazardous substance maintained with site map attached?

  • 15. Prime contractor assuring subcontractor compliance with requirements of EM 385-1-1?

  • Add media

Office Trailer / Signage / General

  • 16. Office and storage trailers properly anchored?

  • 17. Emergency phone numbers posted?

  • 18. Temporary project fencing which extends from grade level to a minimum of 48" above grade (unless GDA determines otherwise based on risk analysis)

  • 19. Signs warning of the presence of construction hazards and requiring unauthorized persons to keep out Posted on fence every 150 feet?

  • 20. Contractor aware of immediate notification for all injuries required by PWD/ROICC/OICC/FSC Office?

  • 21. Emergency plans in case of fire or other emergency prepared in writing and reviewed?

  • 22. Drinking water with disposable cups and a waste receptacle available?

  • 23. Toilet facilities with washing facilities available?

  • 24. Highly visible map delineating best route to nearest medical facility posted on safety bulletin boards?

  • 25. First-aid kit, type III, 16 unit, and one pocket mouth piece or CPR barrier provided and maintained with inventory log available?

  • 26. All employees on site wearing as a minimum short sleeve shirt, long pants, leather or other protective work shoes or boots?

  • 27. Every floor, working place and passageway kept free from protruding nails, splinters, loose boards, clutter and unnecessary holes and openings?

  • 28. Work areas inspected daily for adequate housekeeping and recorded on daily safety inspection report?

  • 29. Traffic control around site adequate?

  • Other? Extra Credit?

  • Add media

Fire Prevention

  • 30. Written fire prevention plan on site abnd used to brief employees?

  • 31. Fire extinguishers available, fully charged, easily visible within 75 for low hazard areas?

  • 32. Fire extinguishers inspected monthly, recorded on tags, and initialed?

  • 33. Fuel stored in safety cans labeled/listed and painted red with yellow band and contents indicated?

  • 34. Are hot work permits being obtained for welding, cutting, or operating other flame-producing/spark producing devices from the fire department?

  • 35. Are fire watches provided?

  • Other? Extra Credit?

  • Add media

Personal Protective Equipment (PPE)

  • 36. Workers wearing safety-toed leather shoes or boots meeting ASTM F 2412-05 and F 2413-05?

  • 37. Hard hats being worn properly and meeting ANSI Z89.1?

  • 38. Are workers involved in activities that subject hands to injury using hand protection appropriate for the hazard?

  • 39. Safety glasses used where appropriate?

  • 40. Hearing protection being used where appropriate? (If you need to yell to converse, hearing protection is required)

  • 41. Workers wearing respirators where appropriate?

  • 42. Impalement protection provided where personnel could work above vertical impalement hazards (rebar, etc.)?

  • 43. Are protective leg chaps worn by workers who operate chain saws?

  • 44. High visibility vests being worn when workers are exposed to vehicular or equipment traffic at up to 45 MPH, there is limited or reduced visibility for workers around mobile/heavy equipment or workers are working close to vehicular traffic with no protective barriers?

  • Other? Extra credit?

  • Add media

Scaffold Safety

  • 45. Has a site specific fall protection plan and prevention plan and AHA been accepted by the GDA prior to commencing work in elevated areas?

  • 46. All erection, moving, dismantling, or altering of scaffolds systems under the supervision of a scaffolding competent person?

  • 47. Competent person using a color-coded tagging system? (Green = Inspected & safe to use) (Red = Scaffold is unsafe to use)

  • 48. Planks overlapped not less than 6" or more than 12" over end support with toe boards in place?

  • 49. Scaffold pinned properly and all corner bracing in place?

  • 50. Scaffold height not more than 4 times smallest base dimension and system is secured to structure?

  • 51. All guardrails in place?

  • 52. Full work platform or decks at each working level with no cracks/splits?

  • 53. Work Platform or deck securely fastened to scaffold?

  • 54. Safe access provided to each working level?

  • 55. Is scaffold plumb and level?

  • 56. Suspended scaffold systems using independent personal fall arrest system?

  • 57. Personnel prohibited from riding on manually propelled scaffolds?

  • Other? Extra credit?

  • Add media

Fall Protection

  • 58. Has site-specific fall protection and prevention plan been accepted?

  • 59. Workers using fall protection equipment using "Buddy System" to begin rescue of fallen worker if required?

  • 60. All workers above 6 foot fall protection threshold protected from falling to a lower level?

  • 61. Are employees trained for fall protection systems in use?

  • 62. Has the contractor designated a competent person for fall protection?

  • 63. Is a written rescue plan (IAW ANSI Z359.2) been prepared and maintained when workers are working at heights?

  • 64. Is a full body harness used?

  • 65. All workers aloft tied off at all times (100%) to structural element capable of supporting 5,000 lbs?

  • 66. Have standard guardrails been provided where needed?

  • 67. Access to work areas greater than 20 feet provided with a stair system?

  • 68. Have horizontal lifelines, if used been designed and installed under the supervision of a qualified person?

  • Other? Extra Credit?

  • Add media

Ladder Safety

  • 69. Ladders extend 3 feet above landing platform and tied to structure?

  • 70. Are ladders used with hand tools only?

  • 71. Are ladder base distances from structure 1/4 height?

  • 72. Are floor openings either covered or surrounded by a guardrail?

  • 73. Electricians not using conductive ladders?

  • 74. Stairways provided on all structures over 20 feet during construction / with guardrail?

  • 75. All flights of stairs with 4 or more risersd have standard stair railings or handrails?

  • 76. Portable step ladders over 20 feet not used on the site?

  • 77. Are ladders properly used?

  • Other? Extra credit?

  • Add media

Excavations

  • 78. Has excavation/trenching plan in accordance with (section 26.A.01.a-n) been submitted and been accepted by the GDA prior to beginning operations?

  • 79. Competent person able to demonstrate training, experience, and knowledge of soil analysis: protective systems and requirements of 29 CFR 1926 Subpart P and has authority to stop work when required?

  • 80. Competent person inspected and documented excavation daily?

  • 81. High visibility apparel worn by all workers exposed to vehicle traffic or working around equipment?

  • 82. Hydraulic excavators, wheel/trucks/backhoe loaders used to transport or hoist loads with rigging comply with EM 385-1-1 Section 16 "S" and have AHA specific to these operations?

  • 83. Written proof of qualification of equipment operators, riggers involved in hoisting, transporting operations?

  • 84. Operational test performed as described in EM385-1-1 Section 16.F?

  • 85. Manufactures operating manual with equipment?

  • 86. Proper use of rigging, including positive latching device?

  • 87. Inspection of rigging?

  • 88. Barricade of radius of equipment and load?

  • 89. Over 4 feet deep must have a ladder within 25 feet and two means of egress?

  • 90. Has proper slope or trench box/shoring been provided?

  • 91. Is water controlled/removed?

  • 92. Is excavated material at least 2 feet back from trench edge?

  • 93. Has safe access/protection been provided to prevent personnel, vehicles, and equipment from falling into excavations?

  • 94. Perimeter protection that meets class I or class II or class III requirements been provided?

  • Other? Extra credit?

  • Add media

Electrical

  • 95. Has a sketch of temporary power distribution been submitted and accepted by the GDA?

  • 96. Electrical work performed by qualified personnel with verifiable credentials?

  • 97. Energized work permit submitted to GDA prior to any work on energized lines on equipment and IAW NFPA70E and EM 3851.E.. 02c(1)-(8)

  • 98. Are ARC flash requirements known and adhered to?

  • 99. Are temporary power panel and receptacles protected from weather?

  • 100. GFCI's in use for site tools? (Applies to existing outlets in renovation projects as well)

  • 101. Temporary lights insulated from supports properly with all lamps working and guarded?

  • 102. Overhead power lines in area, operations prohibited unless maintaining proper clearance distances?

  • 103. Has hazardous energy control program been submitted and accepted by GDA? (OLD Tock out / Tag out)

  • 104. Vertical clearance of temporary wiring of at least 10 feet maintained?

  • 105. All flexible cords inspected at least daily? Documented?

  • 108. Flexible cords not spliced except hard service cords #12 or larger with molded or vulcanized spliced by qualified electrician?

  • Other? Extra Credit?

  • Add media

Cranes

  • 107. Before crane/hoisting equipment is placed in service has it been inspected, tested, and certified in writing by a competent person to be in accordance with the manufacturer's recommendations and the requirements of the EM 385?

  • 108. Crane operator designated qualified and proof of qualification in writing provided to GDA?

  • 109. Project has adequate means for monitoring local weather conditions, including a wind-indicating device?

  • 110. ARE EM385-1-1 16.D.08 (At the beginning of each shift) start up inspections performed by operator and submitted with DRI?

  • 111. Has the periodic inspection been performed prior to use on site IAW EM 385-1-1 Table 16-1 and 16.D.10?

  • 112. Is crane equipped with anti two-block device if required?

  • 113. Is the crane level and on firm ground and outriggers in use with appropriate cribbing?

  • 114. IAW 16.G.09 when cane is operated within 20 foot of power lines (operating work zone is area 360 degrees around crane) has a determination been made that all power lines are energized?

  • 115. IAW Table 16-3 crane not allowed to work closer than 10 foot of energized power lines (Depending on actual voltage of lines)

  • 116. Is crane side loading prohibited?

  • 117. are rigging cables and slings inspected by a competent person before each shift?

  • 118. Are workers protected from crane swing radius and prevented from passing under the load?

  • Other? Extra Credit?

  • Add media

Confined Space

  • 119. All confined space work IAW EM 385-1-1 Section 34.A.06?

  • 120. Is confined space competent person (CSCP), in writing, identified?

  • 121. Is atmosphere being monitored?

  • 122. Is space being ventilated?

  • 123. Are entrants, attendants and entry supervisor properly trained?

  • 124. Is rescue/retrieval equipment in place for permit required confined places?

  • 125. Are entry permits posted at point of entry and signed by entry supervisor?

  • 126. Is the point of entry posted "Danger Confined Space"?

  • 127. Has blanking or locking out of systems taken place?

  • Other? Extra credit?

  • Add media

Roofing

  • 128. Has structural analysis of the roof been conducted by a qualified person?

  • 129. Has competent person completed a daily inspection?

  • 130. Has competent person developed a fall protection plan, submitted/accepted by GDA?

  • 131. Are kettles at least 25 feet away from the buildings?

  • 132. Is kettle attendant wearing proper PPE at all times?

  • 133. Are two fire extinguishers at the kettle?

  • 134. Are skylights and roof penetrations covered or barricaded appropriately?

  • 135. Has the roof been evaluated for its ability to support the intended construction loads?

  • 136. If warning lines on low sloped roofs are used, are they properly installed / maintained?

  • 137. Are fuel cylinders a minimum of 10 feet from open flame?

  • Other? Extra Credit?

  • Add media

Equipment

  • 138. All machinery or equipment inspected daily, when in use, by competent person?

  • 139. Are operators trained and authorized to operate powered industrial trucks (Forklifts), lift trucks, and similar equipment?

  • 140. Mobile equipment equipped with backup alarms? Rollover cages / moving parts adequately guarded?

  • 141. Are equipment operations maintained safe clearance from electrical power lines?

  • 142. Modifications meet manufacturer instructions (I.E. lifting personnel with forklift - (Not allowed by many manufacturers)?

  • 143. Are safety lashings provided for high pressure hose connections, I.E. air compressors?

  • 144. Are workers clear of blind spots associated with mobile construction equipment?

  • 145. Are daily walk around inspections of all aerial lifts performed and documented by qualified operators?

  • 146. Do aerial lifts have basket / platform with guardrail?

  • 147. Workers not extending over guardrail of aerial lifts?

  • 148. Are articulating boom platforms (JLG type) used with full body harness attached to a proper attachment points on boom or basket?

  • 149. Are dump truck checklists being used and copies kept on site?

  • 150. Inspection, maintenance, and repairs to conveyors performed IAW manufacturer's recommendations by qualified personnel?

  • 151. Exposed moving machinery parts mechanically or electrically guarded?

  • 152. When two or more conveying systems are interfaced are adequate guarding and safety devices in place?

  • Other? Extra credit?

  • Add media

Tree Maintenance and Removal

  • 153. All trees maintenance or removal performed under the direction or a qualified tree worker?

  • 154. Only qualified line-clearance tree trimmer or line-clearance trainee assigned to work in close proximity to electrical hazards?

  • 155. Tree workers in a bucket or work platform using fall protection?

  • 156. All tree work operations above 12 foot have a second worker in the area?

  • 157. Prior to felling operations, has work area been cleared and escape routes planned?

  • 158. All employees working from the uphill side whenever possible?

  • Add media

Demolition

  • 159. Has demolition plan, based on engineering, lead, and asbestos survey by a registered professional engineer been accepted?

  • 160. Waste not being dropped > 6 foot unless in an enclosed chute and area secured from traffic?

  • 161. For building demolition, has notification been made to state having jurisdiction?

  • 162. Are nails removed from scrap lumber / materials?

  • 163. Fragmentation of glass controlled?

  • 164. Material chutes at an angle greater than 45 degrees from the horizontal enclosed?

  • Other? Extra credit?

  • Add media

Abatement

  • 165. Has abatement plan been submitted and accepted?

  • 166. Is independent air monitoring being performed as required inside and outside barriers?

  • 167. Is containment in place without integrity comprimise?

  • 168. Are employees utilizing appropriate PPE?

  • 169. If negative air is used, are fans used continuously and monitored for pressure differential?

  • 170. Has baseline been performed and necessary final clearance readings taken?

  • 171. Are inspections by independent PQP performed prior to barrier removal?

  • 172. Is waste material properly containerized and stored?

  • 173. Are air monitoring results provided to GDA?

  • 174. Are waste shipment records provided to GDA?

  • Other? Extra Credit?

  • Add media

Waterfront Activities

  • 175. Work over or near water and the distance to water surface is less than 25 feet or more and water depth is less than 10 feet are fall protection requirements followed? (PFDs not required)

  • 176. Work over or near water and the distance to water surface is 25 feet or more are fall protection requirements followed?

  • 177. Marine fall protection railing type A or type B provided for vessel decks 6 feet or more above adjacent decks, docks, or other hard surfaces?

  • 178. PFD's worn by personnel in areas where deck perimeter is not present?

  • 179. Is a rescue skiff available?

  • 180. Are emergency life rings available?

  • 181. If diving operations are taking place, has a dive plan been submitted and accepted by the DDC?

  • 182. If diving, is first-aid kit, oxygen resuscitation system (30 minute supply), and a stokes litter or backboard with floatation capability on site?

  • 183. Does dive team consist of proper number and qualifications for employees?

  • 184. Hand rails used for fall protection on all marine vessels for contracts awarded since March 2007

  • 185. Marine (vessel) decks 6 feet or more above other surfaces have type A or type B fall protection provided?

  • Other? Extra credit?

  • Add media

Scoring:

  • Total applicable for each category = X (Where X includes responses for category of "Yes" and "No" but does not include "N/A"

    Total with "Yes" for each category = Y

    Score Equation = Y/X

  • Contractor Representative (First, Last, Title)

  • Contractor Representative Signature

  • NAVFAC Representative (First, Last, Title)

  • NAVFAC Auditor Signature

  • Comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.