Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
New Equipment
-
Modified Equipment
-
Equipment Name
-
Line/Location of Equipment
Inspection Team
-
General Manager
-
Plant Egineer
-
Safety Manager
-
Initiator
-
Ops Manager
-
Technical Services
-
Machine Operator
-
Maintenace Mechanic
-
Environmental Manager
Lockout/Tagout
-
Is the machine capable of being locked out?
-
Has the equipment specific lockout/tag out procedure been developed?
-
Are there any special lockout devices needed, if so have they been ordered and distributed to the appropriate personnel?
-
Have Sanitation, production, and maintenance employees been properly trained on the lockout procedures?
-
Have the FSIS IIC been briefed on the new pocedures?
Mechanical Hazards
-
Are equipment disconnects and operating controls labeled?
-
Are the start and stop controls within easy reach of the operator?
-
Is there a PM for the equipment? Are maintenace personnel trained to perform the PM?
-
Can the machine be oiled without removing the safeguards?
-
If there is more than one operator, are separate controls provided?
-
Are Emergency Stops accessible to the operator and working?
Machine Guarding
-
Have all pinch points and points of operation been properly guarded?
-
Have all chains and sprockets been properly guarded?
-
Are there any exposed set screws, key ways, collars, etc?
-
Have all pulleys and belts been properly guarded?
-
Have augers (if present) been properly guarded?
-
Are all machine guards securely attached?
-
Are interlocks prohibited from being bypassed if applicable?
-
Test all interlocks to ensure functioning properly if applicable?
-
Saw blades, is only the length necessary to cut product exposed?
-
Are all shafts ends covered with a non-rotating cap or cut down to a length of less than 1/2 the diameter of the shaft?
Electrical
-
Is the machine wired to NEC and NFPA code?
-
Is the machine grounded?
-
Is the power supply correctly fused and protected?
-
Will additions or modifications require an Arc Flash analysis?
-
Are all electrical connections secured, cords only the length necessary, conduit only used where required (no cords running through walls, under doors, etc)?
-
Is there any temporary equipment S/O cord -allowed for only 90 days- if any follow up required?
Personal Protective Equipment
-
Has PPE Hazard Analysis been conducted for new jobs?
-
Is required PPE available and issued to operators?
-
Have operators been properly trained in use and care of required PPE?
Hearing
-
Have appropriate measures been taken to safeguard workers against noise hazards?
-
Has an area survey been conducted?
-
If above 85 dB, has noise reduction measures been considered?
Evacuation/Egress
-
Have existing means of egress been obstructed or changed (at least 28")?
-
Have exit routes been rerouted if necessary?
-
Have employees been trained in new exit routes?
-
Has the emergency evacuation drawing been updated?
-
Is head room at least 7 feet high with no overhead obstructions below 6'8"?
-
Have all emergency exits been designated by appropriate signage/lighting?
-
Are new sprinkler systems operational and tested?
-
Fire Extinguisher accessible and adequately marked?
Ventilation
-
Does the new equipment generate hazardous vapors/gasses/fumes which will require additional ventilation?
-
If yes, has ventilation been installed?
-
If ventilation has not been installed, have employees been instructed in temporary hazard abatement procedures?
Ergonomics
-
Has an ergonomic audit (EJMS) been conducted of the new/modified equipment?
-
Have identified ergonomic hazards been corrected?
Confined Spaces & Hazardous Locations
-
Has the new equipment created a hazardous location?
-
What is the nature of the hazard?
-
Are confined spaces, if any, permit required?
-
Are all hatches and other means of entry labeled as confined spaces?
-
If yes, have space specific entry procedures been developed?
-
If yes, have employees been trained on entry procedures?
Fall Protection
-
Will the new equipment create a situation in which employees must work more than 4' above the floor and outside of a standard guard rail?
-
Has appropriate fall protection equipment been provided to employees?
-
Have employees been trained in the use of required fall protection equipment?
-
Have any slip/trip/fall hazards been created?
Hazard Communication
-
Has the new equipment introduced any new hazardous chemicals into the facility?
-
Have employees been trained in the hazards and protective measures for the new chemical?
Training
-
Does the new/modified equipment require additional process training?
-
If yes, has the training been conducted?
-
Have new training requirements, if any, been forwarded to the Training Department?
Food Safety / USDA
-
Is the new equipment designed and manufactured to be easily cleaned?
-
Is there an SOP in place to break down the equipment for cleaning?
-
Has USDA been notified of the addition and the start up of the equipment?
-
Has the Cleaning Contractor been notified of the addition and the start up date of the equipment?
Air Permits
-
Has equipment received the necessary air permits?
-
Has the regulatory agency been notified of start up?
-
Has an SOP been modified or created to control the equipment per regulations?
-
Has an updated SOP been submitted to regulators for approval?
-
Does the facility have spare/redundant critical equipment to keep equipment running within compliance standards?
Wastewater Compliance
-
Has the equipment recieved the necessary waste water permits and/or notifications?
-
Has an SOP been modified/created to control the equipment to not impact Waste Water?is wastewater
-
Is wastewater treatment operations prepared to handle the impact of this process change?
SPCC/Storm water
-
Are secondary containment and/or storm water controls in place?
-
Has the SPCC and/or STW plan been updated, including site maps?
-
Has a "BMP" been created for this potential pollution source?
ISO 14001
-
Are the necessary "Operational Controls" established and documented in the EMS?
-
Have any new reporting requirements been added to the Environmental calendar?
-
Is the process change an Aspect or Significant Aspect?
-
Has the training schedule been updated to include the process change?
Waste/Chemical Notification /Utilities
-
Are the procedures in place to handle the waste (haz or non haz) from the process change?
-
Has notification to regulators occurred to address EPCRA requirements?
-
Are appropriate back flow connections installed to prevent contamination of potable water?
-
Are the appropriate mechanical and procedural systems installed to minimize energy/water usage?
-
Please list any other issues or concerns which may have arisen during the inspection of the equipment.
-
Safety
-
Engineering
-
Production