Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Documentation
-
CCB Release Approval (for SAMS Build)
-
Build checklist up-to-date (per build)?
-
User Manual Updated?
-
SAMS ESA Build Release Technical Bulletin Completed?
-
MSSC Sign Off?
-
SCPE Sign Off?
-
SCPO Sign Off?
-
SCPM Sign Off?
-
SCPT Sign Off?
-
SCPW Sign Off?
System configuration
-
Password managed and logged?
-
Boot/logon information per standards?
Mission data
-
DAFIF up-to-date with latest distribution?
-
ECHUM is up-to-date with latest distribution?
Distribution
-
Image Posted on EFD?
-
Image shipped to non-EFD capable sites (OL's)?