Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Job Number

  • Job Type

  • Select date

  • Engineers on site

  • Is this a true SAT job?

  • If it is not SAT it is...

The following information constitutes an on-site risk assessment for the job. A Method Statement is also required.

  • Access to hight will be by:

  • Via Velux window or rooflight Sky SAT procedures with roped access techniques in use.

  • Ladder. With minimum control measures ( sky's fall arrest systems, eye bolting ML and LM or equivalent from the Ladder Hierarchy.

  • Via dormer Sky SAT procedures as trained with roped access techniques in use.

  • Other means ( give details below ) Specify minimum control measures required.

  • Additions to or variations from standard control measures. Any other relevant information- Please specify clearly.

  • Which (if any) ladders are to be used? Select all required.
    NOTE: All PPE and ladder hierarchy should be used as minimum control measure.

  • 8 rung ladder

  • Single section

  • Double section

  • Triple section

  • DAT roof ladder

  • Extended DAT roof ladder (CAT extensions)

  • Combi ladder

  • If LM or ML cannot be used, state what alternative is to be used. An eyebolt or other attachment point must be used for all dish installs and all service work.

  • If anchor points are needed for Roped Access are they:

  • Existing and Fixed ( and in date and granted permission to use?)

  • Temporary - e.g. 20mm eyebolt (primary & back up?)

  • Part of the building structure- Checked and verified by both Engineers?

On-site identified hazards.

  • Can the following Hazards identified be removed. If hazard is not present select N/A

  • Adverse weather

  • Third parties

  • Existing equipment

  • Garden Hazards

  • Ground Hazards

  • Any other Hazard ( give details below)

  • Additional Hazard information

  • Can Hazards be controlled or minimised?

  • If Hazards cannot be controlled or minimised then they must be escalated (give details below)

Method Statement.

  • A clear and detailed method for carrying out the work must be recorded here before the work commences. Items to be covered include site details, pre job preparation, roof type (flat/sloping(give apps angles)); rescue considerations (if standard rescue techniques say so, otherwise specify in detail). The method statement should have sufficient detail to allow another SAT team to understand how they would carry out the work. Add photos/draw diagrams as necessary to illustrate.

  • Add media

  • Add drawing

  • Both engineers must sign before work commences.

  • SAT Engineer 1

  • SAT Engineer 2

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.