Title Page
-
Document No.
-
Job Reference
-
Job Description
-
Date
-
Prepared by
-
Location
-
Personnel
-
Emergency Plan
-
Nominated First Aider and First Aid kit onsite. Location of First Aid Kit
-
Documents on site. JA/ SWMS, MSDS sheets and other related documents onsite Documents Location
-
Are all personnel inducted to site (BRS and Principle)
-
Has all staff signed off on/onto SWMS/JSA and appropriate signage/isolation/barricading controls been implemented to work area?
-
Traffic management plan required
-
Traffic Management Diagram no.
Instruction 2 - Determine what Plant and Equipment is likely to be used
-
List Plant and Equipment
- Truck
- Digger
- Drill
- Tool Wagon
- Hydro-Vac
- Ladder/ Harness
- Small Plant (Cutter/ Wacker/ Compactor
- Jinker Trailer
- Roller
-
Close approach Consent Required
-
Confirm working outside of MAD
-
Safety Observer required
Instruction 3 – State and Review the Job Analysis or SWMS/s that are required for this task
-
Name of JA/SWMS
- 0207 Directional Drilling
- 0208 Concrete Cutting
- 0210 Excavation and Trenching
- 0021 Confined Spaces
- 0029 Hauling Cables/ Testing Tubes
- 0031 Working at Heights
- 0037 Hauling Fibre Optics
- 0028 Working with Asbestos
-
Hazards Identified by JA/ SWMS.
-
Place a tick if the hazards are identified in the Job Analysis or SWMS selected in instruction 3.
- Electrical
- Chemical
- Tools
- Gasses
- First aid
- Vehicles
- Heights
- Depth
- Weight
- Lighting
- Pressure
- Access
- Vibration
- Noise
- Trenches
- Weather
- Bacteria
- Dust
- Slip / Trip
- Remote site
- Hot / Cold Objects
- Rotating Equipment
- Moving Equipment
- Lifting Equipment
- Underground Services
- Confined Space
- Dehydration
- Radiation (Sun)
- Manual Handling
- Exposed holes
- Overhead
- Sharps/needles
- Pedestrians
- Amenities
- Working Alone
-
Personal Hazards
- Hit by moving objects
- Caught in / between
- Strain / repetitive
- Dropped objects
- Strike against
- Inhalation
- Burns
- Exposure to gas / heat / fumes
- Exposure to dust / chemicals
-
Also Consider
- Pollution to the environment
- Soil erosion / contamination
- Runoff to drainage systems
- Simultaneous operations
- Security
- Damage to equipment
- Air / fumes and odours
- Public Liability
- Waste management
- Other Hazards
Instruction 4 – List Site Specific Hazards and Conduct Risk Assessment
-
Hazard
-
Initial Risk
-
Controls
-
Residual Risk
Instruction 5 – Determine what PPE is likely to be used
-
What PPE is likely to be used? Tick Box if used
- Respiratory Protective Device
- Harness / Lifeline
- Eye Protection: Glasses/Goggles/Visor
- Hand Protection/Gloves
- Safety Boots / Gum Boots
- Overalls / Disposable Overalls
- Barricading and Signage
- Lock Out Tag Out Kit
- Hearing Protection
- Safety Helmet
- Communications Equipment
- Torch/Lighting
- Fire Fighting Equipment
- Mechanical Ventilation Device
- Sun Hat
-
Other PPE not listed above
Instruction 6 –Toolbox this document with all personnel on site sign on I have read and understood the Job Analysis/Safe Work Method Statement and agree to perform the work according to the requirements of this Job Start Form and associated SDS, procedures, legislative requirements.
-
Signature
-
Signature
-
Signature
-
Signature
-
Signature