Information

  • Address:

  • UPRN:

  • Front of Property:

  • Property Type:

  • Property Style:

  • Flat Floor Level

  • Main Contractor:

  • Produce on Behalf and For XXX Limited by :

  • Date of site visit:

General

General Observations

  • Insulation

  • K/B Extractor Fan

  • Quantity

  • Fan 1

  • Fan Route

  • Fan 2

  • Fan Route

  • Fan 3

  • Fan Route

  • Sloping Ceiling

  • Satellite Dishes and TV arials

  • Quantity

  • Location

  • Remove and refix

  • Additional costing for aerial refix

  • Type of fixing needed

  • Renew or replace

  • Quantity

  • Skip Location

  • Skip Shute used

Primary Roof Level

  • Chimney

  • Quantity

  • Chimney 1

  • Shared

  • With Who

  • Chimney Removal

  • Quantity (m2)

  • Chimney Pot

  • Quantity

  • Replace

  • Quantity

  • Flaunching

  • Quantity (m2)

  • Chimney Pointing

  • Quantity (m2)

  • Chimney Flashing

  • Quantity (LM)

  • Chimney 2

  • Shared

  • With Who

  • Chimney Removal

  • Quantity (m2)

  • Chimney Pot

  • Quantity

  • Replace

  • Quantity

  • Flaunching

  • Quantity (m2)

  • Chimney Pointing

  • Quantity (m2)

  • Chimney Flashing

  • Quantity (LM)

  • Chimney 3

  • Shared

  • With Who

  • Chimney Removal

  • Quantity (m2)

  • Chimney Pot

  • Quantity

  • Replace

  • Quantity

  • Flaunching

  • Quantity (m2)

  • Chimney Pointing

  • Quantity (m2)

  • Chimney Flashing

  • Quantity (LM)

  • Chimney 4

  • Shared

  • With Who

  • Chimney Removal

  • Quantity (m2)

  • Chimney Pot

  • Quantity

  • Replace

  • Quantity

  • Flaunching

  • Quantity (m2)

  • Chimney Pointing

  • Quantity (m2)

  • Chimney Flashing

  • Quantity (LM)

Tiles

  • Existing Material

  • Existing Underfelt Present

  • Reclaim Potential

  • Proposed Material

  • Proposed Material Quantity

  • Ridge Tile Replacement

  • Quantity (LM)

  • Hip Tile Replacement

  • Quantity (LM)

  • Verge Replacement

  • Quantity (LM)

  • Bonding Gutter

  • Quantity (LM)

  • Roof Valleys

  • Quantity (Lm)

  • Eavesguard Replaced

  • Quantity (LM)

  • Tile Flashings Replaced

  • Quantity (LM)

  • Lead Slate Replaced/Installed

  • Quantity (No.)

  • Soil Vent Pipes

  • Through Roof

  • Eaves/Swan neck adjustment required

  • Quantity (No.)

Flue

  • Active Boiler flue

  • Location

  • Proximity to Scaffolding

Roofline

  • Facia, Soffit, Gutters measure inc. Eaves overhang (LM)

  • Facia Replacement

  • Soffit Replacement

  • Gutter Replacement

  • Downpipe Replacement

  • Quantity (No.)

  • Quantity (LM)

  • Clean down Existing Facia, Soffit, Gutters

Scaffolding

  • Property Levels

  • Scaffolding Servicing Roof Covering (LM)

  • Chimney Scaffold

  • Location

  • Table Lift Scaffold

  • Quantity (LM)

  • Handrail Protection

  • Quantity (LM)

  • Barrow Run Scaffold

  • Quantity (LM)

Secondary Roof

  • Is there a secondary Roof

Roof Level

  • Chimney

  • Shared

  • With Who

  • Chimney Pot

  • Quantity

  • Replace

  • Quantity

  • Flaunching

  • Quantity (m2)

  • Chimney Pointing

  • Quantity (m2)

  • Chimney Flashing

  • Quantity (LM)

  • Chimney Removal

  • Quantity (m2)

Tiles

  • Existing Material

  • Existing Underfelt Present

  • Reclaim Potential

  • Proposed Material

  • Proposed Material Quantity

  • Ridge Tile Replacement

  • Quantity (LM)

  • Hip Tile Replacement

  • Quantity (LM)

  • Verge Replacement

  • Quantity (LM)

  • Bonding Gutter

  • Quantity (LM)

  • Roof Valleys

  • Quantity (Lm)

  • Eavesguard Replaced

  • Quantity (LM)

  • Tile Flashings Replaced

  • Quantity (LM)

  • Lead Slate Replaced/Installed

  • Quantity (No.)

  • Soil Vent Pipes

  • Through Roof

  • Eaves/Swan neck adjustment required

  • Quantity (No.)

Flue

  • Active Boiler flue Location

  • Proximity to Scaffolding

Roofline

  • Building Perimeter for Facia, Soffit, Gutters (LM)

  • Facia Replacement

  • Soffit Replacement

  • Gutter Replacement

  • Downpipe Replacement

  • Quantity (No.)

  • Quantity (LM)

  • Clean down Existing Facia, Soffit, Gutters

Scaffolding

  • Property Levels

  • Scaffolding Servicing Roof Covering (LM)

  • Chimney Scaffold

  • Location

  • Table Lift Scaffold

  • Quantity (LM)

  • Handrail Protection

  • Quantity (LM)

  • Barrow Run Scaffold

  • Quantity (LM)

  • Can the handover be completed in one visit

  • Why can't the roof be handed over at this point

Canopy's

  • Canopy's

  • Leadwork replacement

  • Quantity (LM)

  • Material Quantity (m2)

  • Roofline Works

  • Building Perimeter for Facia, Soffit, Gutters (LM)

  • Facia Replacement

  • Soffit Replacement

  • Gutter Replacement

  • Downpipe Replacement

  • Quantity (No.)

  • Quantity (LM)

  • Clean down Existing Facia, Soffit, Gutters

Asbestos Removal

  • Asbestos Removed

  • Quantity (LM)

Snagging

  • Location

  • Defect Description

  • Photo

  • Priority/ Health & Safety

Signature

  • Content Within Including Measures Agreed on Behalf and For Equans Regeneration Limited by:

  • Signature

  • Signature

  • Signature

  • Acis Representative

  • Signature

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.