Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • The person receiving the contents of this report

  • Signature

SCAFFOLD BASE

  • Are all baseplates and sole boards present ?

  • Risk Factor 0-10

  • Are all baseplates on a solid and even surface ?

  • Risk Factor 0-10

GEOMETRY

  • Are the ledger and standard joints staggered between lifts ?

  • Risk Factor 0-10

  • Are ledgers and standards horizontal and vertical ?

  • Risk Factor 0-10

  • Are the transoms correctly spaced ?

  • Risk Factor 0-10

PLATFORMS

  • Are scaffold boards sound and secure ?

  • Risk Factor 0-10

  • Are the butt joints at least 50mm and no more than 150mm ?

  • Risk Factor 0-10

  • Are platforms fully boarded ?

  • Risk Factor 0-10

BRACING

  • Are all facade bracings correct ?

  • Risk Factor 0-10

  • Are all ledger bracings correct ?

  • Risk Factor 0-10

  • Are all plan bracings correct ?

  • Risk Factor 0-10

MATERIALS

  • Are materials in good condition ?

  • Risk Factor 0-10

  • Are check couplers in place and correct ?

  • Risk Factor 0-10

  • Are the correct couplers being used ?

  • Risk Factor 0-10

  • Are all couplers tightened ?

  • Risk Factor 0-10

HANDRAILS + TOE BOARDS

  • Are all handrails present and gaps not exceeding 470mm ?

  • Risk Factor 0-10

  • Are all handrails secured and at least 950mm above the platform ?

  • Risk Factor 0-10

  • Are all toe boards in place, correctly fitted and at least 150mm high ?

  • Risk Factor 0-10

ACCESS & LADDERS

  • Are all ladders sound and fitted correctly ?

  • Risk Factor 0-10

  • Are Ladder gates / hatches fitted ?

  • Risk Factor 0-10

  • Are access staircases sound and tied to the main structure ?

  • Risk Factor 0-10

  • Are all stair treads tightened

  • Risk Factor 0-10

LOADING

  • Are Materials evenly distributed and within the load class >

  • Risk Factor 0-10

  • Are materials stacked safely are brickguards required ?

  • Risk Factor 0-10

TIES

  • Have ties been tested and recorded ?

  • Risk Factor 0-10

  • Are ties fixed and correctly attached ?

  • Risk Factor 0-10

  • Are there a sufficient amount of ties installed ?

  • Risk Factor 0-10

SHEETING

  • Does the scaffold require debris net or plastic weather clad ?

  • Risk Factor 0-10

  • Is all debris net or weather clad fixed and secured in place correctly ?

  • Risk Factor 0-10

DESIGN

  • Is the structure of a generic type TG20:13 compliant scaffold?

  • Does the structure have or require a design to be compliant with TG20:13 ?

NOTES

  • ANY OTHER MATTERS TO BE ADDRESSED

  • Add media

SUMMARY OF FINDINGS

  • SUMMARY, OVERALL VIEW AND RECOMMENDATIONS OF THE SCAFFOLD

ACTION DATE

  • All of the faults with the scaffold contained with in this report must be actioned within 7 days.
    Alternatively the scaffold is to be put out of service and all site personnel are prohibited to use any areas not actioned.

    Please provide date and signature of the person taking action:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.