Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Scaffold vicinity
-
Has public protection been provided?
-
Have safeguards against overhead electric lines been provided?
-
Is there control over crane operation?
-
Is there control over vehicle movement?
-
Are scaffolds erected a safe distance away from trenches or excavations?
-
Scaffold description
Soleboards and baseplates
-
Are there enough soleboards?
-
Are the soleboards of suitable size and in good condition <br>
-
Are there enough baseplates?
-
Are the baseplates secure?
Scaffold structure
-
Are the standard spacing's correct<br>
-
Are the standards plumb or as designed?
-
Have the joints in the standards been staggered
-
Are ledger joints staggered
-
Are the ledgers correctly secured?
-
Are the joints in standards correctly positioned?
-
Are the ledgers continuous or as designed?
-
Are the standards bearing firmly? <br>
-
Are the braces within 300mm of a node point
-
Are the ledgers level or as designed?<br>
-
Does the façade bracing go bottom to top
-
Is the façade bracing in every 6th bay
-
Is the bracing satisfactory?<br>
-
Are the lift heights correct?
-
Is the scaffold stable?<br>
-
Are the joints in ledgers correctly secured—tube and coupler scaffold?
-
Are there enough transoms or putlogs?
-
Are the ties correctly positioned and correctly fixed?
-
Are the transoms or putlogs correctly positioned and secured?<br>
-
Are there transoms within 300mm of a brace
-
Is the scaffold safe and fit for use
-
Is the correct signage on the scaffold
Platforms
-
Does the scaffold have the required number of working platforms?<br>
-
Are the working platforms at the required locations?<br><br>
-
Are catch platforms correctly positioned?<br><br>
-
Are the platforms and supporting scaffold constructed for the relevant duty live loads?<br>
-
Are the platform dimensions suitable for the intended work?<br><br>
-
Is there satisfactory edge protection?<br><br>
-
Are the platforms correctly constructed?<br>
-
Are planks secured against wind?<br>
Entry and exit
-
Is there safe entry and exit to every scaffold platform?<br><br>
-
Are entries, exits and access platforms correctly installed?<br><br>
-
Are ladders at least 1.05m above the lift
-
Do the ladder access have the correct ladder trap or ladder gate
-
Are the ladders in a good working condition
-
Are ladder traps/gates in good working order
Containment sheeting
-
Has the scaffold been designed for wind loading on containment sheeting?<br><br><br>
-
Has the retention of rainwater and its effect on increasing weight been considered? <br><br><br><br>
-
Are the fixing ties secure?<br><br><br><br>
-
Are there rips or tears?<br><br><br>
-
Are the overlap joints satisfactory?<br>
General fitness for purpose
-
Is there provision for material handling?<br><br><br><br><br>
-
Are the clearances between the scaffold and adjacent structures correct?<br><br><br><br><br>
-
Is there protection from falling debris?<br><br><br><br><br>
-
Has the scaffold been safely designed to support attachments?
-
Are approaches and platforms effectively lit?
Site File
-
Is there a site file folder
-
Are operatives signed on to the Risk and method statements
-
Are daily task briefings being done and are they up to date
-
Are weekly toolbox talks being done and are they up to date
-
Is the harness register filled in
Housekeeping
-
Are materials stacked neatly
-
Are all working lifts clear of loose materials
-
Are materials out of the way of other contractors
-
Are materials lent up
-
Are materials that are stood up tied off
-
Add location
Sign off
-
Signed by inspector
-
Signed on behalf of the client
Operatives
-
Are operatives wearing there P.P.E
-
Is the P.P.E being worn correctly
-
Is the P.P.E in good condition
-
Are the operatives working safely
-
Are operatives working to T.G2013