Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Document No.

1.0 - Site File Compliance

  • 1.1 - Is the Pre Start checklist in place , correctly filled out and countersigned ?

  • 1.2 - Are Method Statements & Risk Assessment in place ?

  • 1.2.1 - Has the Method Statement & Risk Assessment been signed by all operatives

  • 1.2.2 - Has the Method Statement & Risk Assessment been reviewed within the last 6 Months?<br><br>

  • 1.3 - Have the Sign in sheets been filled in by all operatives on a daily basis ?

  • 1.4 - Are Daily Diaries being completed on a daily basis ?

  • 1.5 - Are tool box talks being carried out each week ?

  • 1.5.1 - Are tool box talks being recorded to a sufficient level?

  • 1.6 - Have All scaffolds been inspected in the past 7 days ?

  • 1.6.1 - Are Scaffold Inspection sheets kept in the site file ?

  • 1.7 - Have all Harness inspections been carried out in the last 7 days ?

  • 1.7.1 - Are harness inspection records being maintained in the safety file ?

  • 1.8 - Are time sheets being kept in the site file ?

  • 1.9 - Are action points being closed out from previous audits?

  • 1.10 - Are Anchor tests reports being stored in the site file?

  • 1.11 - Are Training records being updated and stored in the site file?

  • 1.12 - Is the Accident / Incident / Near miss paperwork up to date ? <br>

  • 1.13 Has the LOLER register been maintained?

  • 1.14 - Has the HAVS register Been maintained?

  • 1.15 - Has the PPE register been maintained ?

  • 1.16 - Are Emergency Procedures & First Aid Arrangements in place ?

  • 1.17 - Are the company Policies and procedures in the site file ?

  • 1.17.1 - Is their an up to date copy of Insurance in the site file ?

  • 1.18 - Has PAT testing been carried out in the last 3 months ?

  • 1.19 - Are the most recent revisions of design drawings or compliance sheets onsite ?

  • 1.19.1 - Has the drawing register been maintained?

  • 1.20 - Is the overall site file to an acceptable standard?

2.0 - Foundations

  • 2.1 - No evidence of sinkage

  • 2.2 - No evidence of shrinkage

  • 2.3 - Scaffolding not erected on manhole covers

  • 2.4 - Scaffolding not erected over excavations

  • 2.5 - scaffolding not erected near trenches

  • 2.6 - Are the ground conditions suitable at the time of inspection?

3.0 - Footings ( Base Plate & Sole Boards )

  • 3.1 - Are the sole boards the correct dimensions and in good condition?

  • 3.2 - Are the base plates installed correctly on the sole board?

4.0 - Standards

  • 4.1 Are standards correctly spaced as per design or TG20

  • 4.2 - Are couplers ( sleeves ; joints ) staggered ?

5.0 - Ledgers

  • 5.1 - Are the ledgers Horizontal ?

  • 5.2 - Are sleeves staggered ?

6.0 - Transoms

  • 6.1 - Are transoms horizontal?

  • 6.2 - Have right angle couplers been used (as required) ?

  • 6.3 - Are transom spacing correctly for the support of the boards?

  • 6.4 - Are the tubes sufficiently passed through the coupler?

  • 6.5 - Is the working platform wide enough and to design ?

7.0 - Edge Protection & General Protection

  • 7.1 - Is the top Handrail fitted at correct height?

  • 7.2 - Are the Intermediate rails fitted at the correct height?

  • 7.3 - Are toe boards fitted to all elevations including the haki staircases

  • 7.4 - Are the Ladder Gates / Trap Doors in place and operable?

  • 7.5 - Is the edge protection secured and undamaged. <br>

  • 7.6 - Are Loading Bay Gates in place an operable?

8.0 - Boards

  • 8.1 Are boards free from defect?

  • 8.2 - Are all boards in the correct position and not been tampered with by others?

  • 8.3 - Are the boards secured where applicable?

  • 8.4 - Are boards correctly supported by the Transoms?

  • 8.5 - Are boards placed so they don't cause slips , trips and falls ?

9.0 - Bracing

  • 9.1 - Has the Facade bracing been fitted correctly?

  • 9.2 - Has the Ledger bracing been fitted correctly?

  • 9.3 - Has Plan bracing been fitted where applicable?

  • 9.4 - Have the correct couplers been fitted?

10.0 - Ladders

  • 10.1 - Are the ladders adequate length and rise above the platform by a minimum 1.00m?

  • 10.2 - Are the ladders correctly secured?

  • 10.3 - Are all ladders free from defect?

  • 10.4 - Have the ladders been inspected within the last three months?

  • 10.5 - Are all ladders set at the correct angle i.e 1 to 4?

11.0 - Security and Protection

  • 11.1 - Are controls in place for public protection if required?

  • 11.2 - Is the means to prevent public access adequate ?

  • 11.3 - Is safe passage available to the public

  • 10.4 Is the relevant signage adequate and fixed into place?

12.0 Ties

  • 12.1 - Are ties fitted to right angle couplers ,

  • 12.2 - Is the pull testing up-to date as per company policy (10 percent) ?

  • 12.3 - Is the tie test certification in the site health and safety folder?

  • 12.4 - Have ties been fitted as per the scaffold design or inaccordance with TG20?

13.0 Miscellaneous

  • 13.2 - Has the scaffold structure been erected to the design or the compliance sheets in accordance with TG20?

  • 13.3 - Is the SWL of the scaffold being adhered to ?

  • 13.4 - Has the sheeting / netting been fitted correctly?

Quality Inspection Check sheet

  • Are Exclusion Zones adequate and being maintained?

  • Have all actions been closed out from the previous visit , if not detail those outstanding!

  • Have all personnel completed the Alandale Plant & Scaffolding induction?

  • Are harness been worn correctly by operatives?

  • Does the lorry require a lifting plan and is it available?

  • Is house keeping on site to a good standard?

  • Are the welfare facilities on site to a good standard and and do they conform with CDM2015?

  • Have any relevant warning signs have been erected i.e locations and elevations.

  • Have all scaffolding operatives been issued with tethered tools ?

14.0 - Details of issues arising from this scaffolding inspection

  • 14.1. Recommendations/Person Responsible /Target Date

15.0 - details of actions to be taken.

  • 15.1 - Details of actions taken by competent persons to rectify issues/ date / completed

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.