Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Document No.
1.0 - Site File Compliance
-
1.1 - Is the Pre Start checklist in place , correctly filled out and countersigned ?
-
1.2 - Are Method Statements & Risk Assessment in place ?
-
1.2.1 - Has the Method Statement & Risk Assessment been signed by all operatives
-
1.2.2 - Has the Method Statement & Risk Assessment been reviewed within the last 6 Months?<br><br>
-
1.3 - Have the Sign in sheets been filled in by all operatives on a daily basis ?
-
1.4 - Are Daily Diaries being completed on a daily basis ?
-
1.5 - Are tool box talks being carried out each week ?
-
1.6 - Have All scaffolds been inspected in the past 7 days ?
-
1.6.1 - Are Scaffold Inspection sheets kept in the site file ?
-
1.7 - Have all Harness inspections been carried out in the last 7 days ?
-
1.7.1 - Are harness inspection records being maintained in the safety file ?
-
1.8 - Are time sheets being kept in the site file ?
-
1.9 - Are action points being closed out from previous audits?
-
1.10 - Are Anchor tests reports being stored in the site file?
-
1.11 - Are Training records being updated and stored in the site file?
-
1.12 - Is the Accident / Incident / Near miss paperwork up to date ? <br>
-
1.13 Has the LOLER register been maintained?
-
1.14 - Has the HAVS register Been maintained?
-
1.15 - Has the PPE register been maintained ?
-
1.16 - Are Emergency Procedures & First Aid Arrangements in place ?
-
1.17 - Are the company Policies and procedures in the site file ?
-
1.17.1 - Is their an up to date copy of Insurance in the site file ?
-
1.18 - Has PAT testing been carried out in the last 3 months ?
-
1.19 - Are the most recent revisions of design drawings or compliance sheets onsite ?
-
1.19.1 - Has the drawing register been maintained?
2.0 - Foundations
-
2.1 - No evidence of sinkage
-
2.2 - No evidence of shrinkage
-
2.3 - Scaffolding not erected on manhole covers
-
2.4 - Scaffolding not erected over excavations
-
2.5 - scaffolding not erected near trenches
-
2.6 - Are the ground conditions suitable at the time of inspection?
3.0 - Footings ( Base Plate & Sole Boards )
-
3.1 - Are the sole boards the correct dimensions and in good condition?
-
3.2 - Are the base plates installed correctly on the sole board?
4.0 - Standards
-
4.1 Are standards correctly spaced as per design or TG20
-
4.2 - Are couplers ( sleeves ; joints ) staggered ?
5.0 - Ledgers
-
5.1 - Are the ledgers Horizontal ?
-
5.2 - Are sleeves staggered ?
6.0 - Transoms
-
6.1 - Are transoms horizontal?
-
6.2 - Have right angle couplers been used (as required) ?
-
6.3 - Are transom spacing correctly for the support of the boards?
-
6.4 - Are the tubes sufficiently passed through the coupler?
-
6.5 - Is the working platform wide enough and to design ?
7.0 - Edge Protection & General Protection
-
7.1 - Is the top Handrail fitted at correct height?
-
7.2 - Are the Intermediate rails fitted at the correct height?
-
7.3 - Are toe boards fitted to all elevations including the haki staircases
-
7.4 - Are the Ladder Gates / Trap Doors in place and operable?
-
7.5 - Is the edge protection secured and undamaged. <br>
-
7.6 - Are Loading Bay Gates in place an operable?
8.0 - Boards
-
8.1 Are boards free from defect?
-
8.2 - Are all boards in the correct position and not been tampered with by others?
-
8.3 - Are the boards secured where applicable?
-
8.4 - Are boards correctly supported by the Transoms?
-
8.5 - Are boards placed so they don't cause slips , trips and falls ?
9.0 - Bracing
-
9.1 - Has the Facade bracing been fitted correctly?
-
9.2 - Has the Ledger bracing been fitted correctly?
-
9.3 - Has Plan bracing been fitted where applicable?
-
9.4 - Have the correct couplers been fitted?
10.0 - Ladders
-
10.1 - Are the ladders adequate length and rise above the platform by a minimum 1.00m?
-
10.2 - Are the ladders correctly secured?
-
10.3 - Are all ladders free from defect?
-
10.4 - Have the ladders been inspected within the last three months?
-
10.5 - Are all ladders set at the correct angle i.e 1 to 4?
11.0 - Security and Protection
-
11.1 - Are controls in place for public protection if required?
-
11.2 - Is the means to prevent public access adequate ?
-
11.3 - Is safe passage available to the public
-
10.4 Is the relevant signage adequate and fixed into place?
12.0 Ties
-
12.1 - Are ties fitted to right angle couplers ,
-
12.2 - Is the pull testing up-to date as per company policy (10 percent) ?
-
12.3 - Is the tie test certification in the site health and safety folder?
-
12.4 - Have ties been fitted as per the scaffold design or inaccordance with TG20?
13.0 Miscellaneous
-
13.2 - Has the scaffold structure been erected to the design or the compliance sheets in accordance with TG20?
-
13.3 - Is the SWL of the scaffold being adhered to ?
-
13.4 - Has the sheeting / netting been fitted correctly?
Quality Inspection Check sheet
-
Are Exclusion Zones adequate and being maintained?
-
Have all actions been closed out from the previous visit , if not detail those outstanding!
-
Have all personnel completed the Alandale Plant & Scaffolding induction?
-
Are harness been worn correctly by operatives?
-
Does the lorry require a lifting plan and is it available?
-
Is house keeping on site to a good standard?
-
Are the welfare facilities on site to a good standard and and do they conform with CDM2015?
-
Have any relevant warning signs have been erected i.e locations and elevations.
-
Have all scaffolding operatives been issued with tethered tools ?
14.0 - Details of issues arising from this scaffolding inspection
-
14.1. Recommendations/Person Responsible /Target Date
15.0 - details of actions to be taken.
-
15.1 - Details of actions taken by competent persons to rectify issues/ date / completed
Sign Off
-
On site representative
-
Auditor's signature