Title Page
-
Document No.
-
Conducted on
-
Personnel
-
Site Location
Pre use checks
-
Toe boards x4
-
Base Section x1
- Not Safe to use
- Safe to use
-
1.5m Section x4
- Safe to use
- Not Safe to use
- Checked All 1.5m (4) sections
-
1m Guard Section x2
- Safe to use
- Not safe to use
- Checked All 1m Guard Rail Section
-
Poles
- Safe to use
- Not Safe to use
- Checked All 1.8m Poles (7)
- Checked All 2.1m Poles
-
Stabilisers x4
- Not Safe to use
- Safe to use
-
Adjustable legs / Castors x4
-
Deck Boards x2
Pre use site inspection
-
Site checked for hazards / suitabilty
Erection of Scaffold Tower
-
Personal PASMA trained
-
Name:
-
Time / date of inspection
Components Returned and Checked
-
Components
- Base sectionreturned x1
- 1.5m section returned x4
- 1m Guard section returned x2
- 1.8m Poles returned x7
- 2.1m Poles returned x5
- Deck Board returned x2
- Stabilisers returned x4
- Adjusted legs / Castors x4
- Toe boards returned 4
- Safebrace returned
-
Comments:
-
Name: