Information

  • job no

  • Client

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Engineer on site

  • The installation is in accordance with the specification and any changes have been agreed with the customer in writing

  • All cables into door panel clearly marked

  • Is the door panel secured properly to prevent water ingress

  • Door panel

  • Door panel manufacturer and model number including camera unit / digital keypad any other parts

  • Has the audio on the panel been set to suit the environment it being used ( sound level)

  • What calling mode is the system

  • Has a functional panel been installed and have all buttons been programed and tested

  • Is the panel audio or audio/video

  • What type of lock has been installed

  • Lock manufacturer and part number

  • Is the lock a fail safe or fail secure lock

  • Has a MOV or diode been installed on the lock

  • Has the lock been checked for correct operations

  • Has the lock been installed by SCCI

  • Lock

  • Cables are segregated and suitably supported in riser and central equipment cabinet

  • Field wiring is labelled and adequately terminated in all devices/controllers.

  • Manufacturer and model no of power supply equipment and control equipment and any switch units

  • State location of central equipment and junction box within building

  • Central equipment

  • Do you require a door key to access central equipment

  • What type of key is required

  • What access equipment do you require

  • Control equipment / rise cabling

  • Manufacturer and model of handset and back plate

  • Handsets have been installed correctly and addressed

  • Have the following functional test been performed (door release/speech/audio)

  • If no to the above question give details

  • Picture of handset installed with flat number on written card for less then 20 handsets

  • Mains connection is permanently connected and NOT by plug and socket

  • Is the mains supply a 3A unswitched fuse connection unit

  • All reader, keypad and egress button have been checked for correct operation and response time

  • Reader/PTE/BGU

  • The operation of each door has been checked for correct operation under fire/emergency conditions.

  • At least 5 tags have been issued and checked for correct operation

  • Has the system got a CPS installed

  • Is the CPS in full working order

paper work

  • The customer has been shown how to operate the system and full training has been offered.

  • System training has been given to

  • Signature

  • User manual and schematic drawing printouts are available to the operator.

  • Service telephone label complete with contract number is located appropriately

  • Have all the cables in the riser been clipped or tied and made good

  • All surplus materials and equipment have been cleared from the site.

  • The customer premises have been left in a tidy condition.

  • Is the system in full operation condition

  • Have any major joint have been made if yes list locations

  • Notes or comments

  • I confirm that the installation is complete as recorded above and the system has passed its acceptance test (any items which are not complete has been recorded )

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.