Information

  • Job No.

  • Warden Call Audit test

  • Hyde housing:

  • Conducted on

  • Engineer carrying out test:

  • Location
  • Add media

  • Manager name:

Before commencing test notify control centre of testing

Control cabinet test:

  • Mains failure

  • Mains restored

  • Low battery warning:

  • Power supply test voltages

  • Carry out battery testing and run system on standby:

Smoke detector testing:

  • Do all detectors operate correctly and signal control

Alarm signalling and communication

  • Do all signals from equipment work in all modes<br>On site<br>Off site<br>Remote off site

Handsets/Cordless phones

  • Do all functions on handset work correctly and is the condition of the handset acceptable for use and shows any sign of damage

Call points and pull cords test

  • Do all devices work correctly.report defects

Radio devices/receivers

  • Do all radio devices work .Report defects

Door entry panel test:

  • Carry out full functional panel test:report defects

Visual inspections

  • Cabling/trunking/modules etc are intact and no damage: Report defects

  • Engineer signature

  • Customer Signoff

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.