Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Assessment
Scenting requirements
-
Intend to scent
- Food odor
- Tobacco odor
- Washroom odor
- New furniture odor
- Perspiration odor
- Rubbish odor
- Grease trap odor
- Gym mats rubber odor
- Brand enhancement
- Shopping enhancement
- Dead pests odor
-
Target area
-
Target space
Site AirCon specifications
-
Type of AirCon
-
AirCon start time
-
AirCon end time
-
Duct layout provided?
-
Air flow analysis sketch
System configurations
-
Fragrance selection
-
Capacity selection
-
Scenting system selection
- LK300
- LK400
- LK2000
- PS150
- PS270 Genie
- PS550
- PS570
- PS1200
- PS1270
-
Scenting start time P1
-
Scenting end time P1
-
Scenting days per week P1
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
Scenting start time P2
-
Scenting end time P2
-
Scenting hours per day P2
-
Scenting days per week P2
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
Cartridge life in days
Deployment
-
Installation method
-
Return vents and positive pressure entrance avoided?
-
Human traffic avoided at least 5 metres?
-
Access panel available?
-
Devoted 24 hours power socket provided
-
Is a two way adaptor socket required?
-
Is casing required?<br>
-
Is a ladder required?
Installation schedule
-
Secured installation date
-
Secured installation time range
-
Installation contact person's name and mobile number
-
Surveying scentarian