Title Page

  • Audit Title

  • Client / Site

  • Date on site

  • Prepared by

  • Site address

Project Details

  • Customer Contact name

  • Customer contact phone

  • Customer Email

  • Add location
  • Work Order Number

  • Commissioning details

  • FSE involved

EVlink Information

  • Description

  • Model Number

  • Serial Number

  • Firmware version

  • Firmware Build

Test Equipment Used

  • 1. Laptop

  • 2. EV Simulator Tool

  • 3. Fluke multi-meter

  • 4. Sparkymate

Commissioning

  • Sign in / H&S

  • Documentation completion: SENZ HIRA and customer sign in.

  • Established work area, equipment setup and isolations where required.

  • Visual checks

  • Visual check of charger externals for damage/wear.

  • Visual check of internal hardware.

Uploads

  • Upload customer configuration parameters.

  • Upload customer maintenance logs.

  • Firmware revision check

Tests - Socket #1

  • Check cable integrity

  • a. Visual Cable Check

  • b. Electrical Cable Check (Earth Continuity less than 1 Ohm)

  • c. Insulation Resistance Check Earth to Red phase (greater than 1 MOhm)

  • d. Insulation Resistance Check Earth to White phase (greater than 1 MOhm)

  • e. Insulation Resistance Check Earth to Blue phase (greater than 1 MOhm)

  • f. Insulation Resistance Check Earth to Neutral (greater than 1 MOhm)

  • Trip the Power Auxiliary Breaker (welded contactor test) to test under voltage release

  • Test RCD charger using Schneider Electric Vehicle Simulation Tool

  • Confirm RCD tripping time is less than 300 milliseconds @ 30 mA – Red Phase

  • Confirm RCD tripping time is less than 300 milliseconds @ 30 mA – White Phase

  • Confirm RCD tripping time is less than 300 milliseconds @ 30 mA – Blue Phase

  • Test earth continuity monitoring with EV Simulation Tool

  • Function test with Schneider Electric vehicle simulation tool.

  • Function test charger using a customer supplied vehicle (if applicable/vehicle readily available).

Tests - Socket #2

  • Check cable integrity

  • a. Visual Cable Check

  • b. Electrical Cable Check (Earth Continuity less than 1 Ohm)

  • c. Insulation Resistance Check Earth to Red phase (greater than 1 MOhm)

  • d. Insulation Resistance Check Earth to White phase (greater than 1 MOhm)

  • e. Insulation Resistance Check Earth to Blue phase (greater than 1 MOhm)

  • f. Insulation Resistance Check Earth to Neutral (greater than 1 MOhm)

  • Trip the Power Auxiliary Breaker (welded contactor test) to test under voltage release

  • Test RCD charger using Schneider Electric Vehicle Simulation Tool

  • Confirm RCD tripping time is less than 300 milliseconds @ 30 mA – Red Phase

  • Confirm RCD tripping time is less than 300 milliseconds @ 30 mA – White Phase

  • Confirm RCD tripping time is less than 300 milliseconds @ 30 mA – Blue Phase

  • Test earth continuity monitoring with EV Simulation Tool

  • Function test with Schneider Electric vehicle simulation tool.

  • Function test charger using a customer supplied vehicle (if applicable/vehicle readily available).

Record

  • Record the Type of Socket #1 RCD and confirm compliance (Type B)

  • Record the Type of Socket #2 RCD and confirm compliance (Type B)

  • Verify/Record the Rating of Socket #1 RCD is compliant (current rating in Amps and Sensitivity in mA)

  • Verify/Record the Rating of Socket #2 RCD is compliant (current rating in Amps and Sensitivity in mA)

  • Record supply circuit breaker rating – Socket #1 (Amps)

  • Record supply circuit breaker rating – Socket #2 - result below (Amps)

  • Verify the correct Rating of all overcurrent protection

Completion

  • Record assessment/inspection on the Electrical and Gas High Risk Database

  • Attach Schneider Electric service/inspection tag.

  • Removed isolations where required and cleared site appropriately.

  • Report completion.

Findings

  • List all the Findings (click "Add Finding")

  • Finding
  • Add media

Conclusions

  • List all the Conclusions (click "Add Conclusion")

  • Conclusion

Recommendations

  • List all the Recommendations (click "Add Recommendation")

  • Recommendation

Completion

  • Sign off

  • For further information and maintenance offers, please contact our Services sales team on 0800 652 999.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.