Title Page
-
081716
-
Scissor Lift Checklist
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Which Scissor lift will you be using? Choose one
-
Genie GS 1930
-
JLG 1230
-
JLG 2630
-
Mark Lift CH20 NEP
-
MEC 2548
-
Other -
Pre - Operation Procedures (prior to operation)
-
check Hydraulic hoses and fittings
-
Check battery and wire connections
-
Check tires for wear and proper inflation
-
Report any issues in this category here -
Main Frame & Scissor lift (prior to operation)
-
Check frame and structure for visual cracks, corrosion bends
-
check to ensure all pivot pins and fasteners are in place and operable
-
Ensure ground control panel is operable and functioning
-
Test ground lift, lower and emergency stop functions
-
Report any issues in this category here -
Platform and Guard Rails (prior to operation)
-
Visually inspect the platform and guard rail system prior to mounting the lift
-
Ensure platform is free of unnecessary tools, equipment and materials
-
The operators manual is located on this lift
-
Report any issues in this category here -
Control Systems & Function Test
-
Check for damage to electrical cords, switches, indicators
-
Ensure platform control panel is operating correctly
-
Test steering, driveability and brakes to ensure proper operation
-
Test Emergency Stop Botton
-
Report any issues in this category here -
-
Request any work that needs to be completed here -
-
Print and Sign your name