Title Page
-
Site conducted
-
Location
-
Rig number
-
Prepared by
-
Date
Drogue Assembly
-
Drogue general condition
-
Kill line length checked?
-
Bridle condition
-
Disk and screws
-
Soft link attachments
-
Inner bridle wear points
-
Photos of any issues or damage
Main Canopy, lines and risers
-
Main d-bag (2 connection points)
-
Canopy
-
Photos of any issues or damage
-
Line trim and line condition
-
Untwist brake lines
-
Wax A and B lines
-
Slider
-
Soft-link connection
-
Risers and toggles
Reserve assembly
-
Check reserve risers for wear
-
Reserve closing loop condition
-
Reserve ripcord seated correctly?
-
Reserve due date
-
Reserve due date on card match whiteboard?
-
Check for SB #20111109
-
Click link below for information on SB 20111109
https://www.pia.com/piapubs/ServiceBulletins/SigmaPSB20111109November2011.pdf -
Number of jumps on AAD
-
Photos of any issues or damage
Container
-
3 rings
- Correctly assembled and good for service
- Not serviceable
-
Webbing under D-ring attachment point
-
Remove and clean cutaway cable.
-
Confirm cutaway through Collins Lanyard
-
Bungee ripcord condtion
-
Main closing loop
-
Drogue pouch
-
Stretch out Main Lift Web
-
Rig condition overall
-
Photos of any issues or damage.
Work required
-
Is The Kras required!
-
Work required?
-
Photo of work required - for Kras purposes
Sign off
-
Was the Kras required?
-
Has the work been completed as required?
-
Photos if required.
-
Rig good for service?
-
Signature
-
Select date