Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Subject or Activity Assessed

  • Is the work being undertaken by an engineer or trainee

  • Name of engineer being assessed

Skills

  • Pre installation preparation

  • Relevant information gathered from Field Services work order

  • Route, MST and wayleaves information checked using Collector

  • Installation discussed with customer and plan agreed

  • POWRA completed

  • Underground work

  • Site setup

  • Appropriate tools used and correct use demonstrated

  • Rodding/Roping ducts

  • Cable pulling

  • Labelling and securing of cable

  • MST testing and connecting

  • Work site kept tidy

  • Health and safety compliant / correct PPE used / work site kept safe for engineers, customer and public

  • Working at height

  • Site setup

  • Appropriate tools used and correct use demonstrated

  • Pre-climb checks carried out if accessing pole

  • Appropriate procedures followed for drawing cable (pole to pole, pole to property)

  • Correct setup of ladder using relevant procedures at pole and property

  • Work site kept tidy

  • Health and safety compliant / correct PPE used / work site kept safe for engineers, customer and public

  • External work at property

  • Appropriate tools used and correct use demonstrated

  • Installation of cable mounting equipment

  • Installation of cable

  • Installation of external housing

  • Work site kept tidy

  • Health and safety compliant / correct PPE used / work site kept safe for engineers, customer and public

  • Internal work at property

  • Appropriate tools used and correct use demonstrated

  • Drilling cable entry hole (pre-drill preparation)

  • Installation of wall mounted equipment

  • Installation of internal cable

  • Installation of SC/APC connecter

  • Work site kept tidy

  • Health and safety compliant / correct PPE used / work site kept safe for engineers, customer and public

  • Greenfield

  • Appropriate tools used and correct use demonstrated

  • Route planning for sub-duct and checking for obstacles

  • Digging slit trench

  • Drilling into toby box

  • Installation of sub-duct from toby box to property

  • Work site kept tidy

  • Health and safety compliant / correct PPE used / work site kept safe for engineers, customer and public

  • Testing/Remediation

  • Services tested once live using appropriate tools

  • Service demonstrated to customer

  • Installation of additional equipment where required (i.e. boosters)

  • Post installation

  • Work site cleared of equipment and waste

  • Relevant notes, pictures and products added to work order

  • Customer Service

  • Call customer prior to arrival

  • Provide accurate information for using the service (i.e. connecting to Wi-Fi, Wi-Fi limitations)

  • Answer customer questions

  • Polite and courteous

Conclusion

  • Is the observed person deemed to demonstrate competency

  • Identify how this person will be supported to improve or other action required

  • Has the individual being observed got any comments about their performance?

  • Has the individual being observed got any comments or concerns about anything else?

  • Agreed actions and improvements

  • Observers signature to demonstrate that this is a true record of training/ competency assessment

  • Observers signature to demonstrate that this is a true record of training/ competency assessment

  • Engineer / Trainee Engineer signature to confirm this is a true record of training/ competency assessment

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.