Title Page
-
Site conducted
-
Date and Time Report Started
-
Date and Time Strike(s) Occurred
-
Road name ref
-
Gang
-
Initially notified immediately by text/email to whom on H&S Team
-
Report prepared by
-
Location (including house No. & full postcode)
Initial report
General Information
-
Service Type
- GAS
- WATER
- CCTV CABLE
- ELECTRIC STREETLIGHT
- ELECTRIC CABLE HV
- ELECTRIC CABLE LV
- TELECOMMUNICATIONS - Copper
- SEWER
- TELECOMMUNICATIONS - Fibre
-
Describe briefly how the site was made safe
-
Date & Time Strike Reported to Service Owner
-
Date and Time Repaired (you must email it through to HS team once known if not included in this report)
-
Activity when Strike occurred
-
Damaged Service Depth
-
Recommended Depth
-
Surface Type
-
Name of Operative responsible for damage
-
Name of Foreman
-
If a subcontractor, name which
-
Was any person(s) injured (IF SO, NOTIFY H&S TEAM IMMEDIATELY)
-
Brief Injury Description, if any
Evidence Required
-
NOTE: for each of the following a CLEAR and sufficiently detailed photo(s) must be taken
-
1. Generic Street Works Risk Assessment available? (usually on Tablet - Copy or Photo Required)
-
2. Dynamic risk assessment (POWRA) completed Copy & Photo FRONT AND BACK
-
F91 FORM COMPLETED ? (PHOTO FRONT AND BACK)
-
3. Service drawings on site and checked (usually on Tablet - Copy & Photos Required)
-
Open up and photo evidence service prints of utility damaged.
-
4. Services marked up (Photo Required)
-
9.CAT & Genny Calibration Due Date (provide photo of both showing cal dates and cat in 3 phases)
-
11. Visual Signs- eg. Surface Scars, Furniture or Property (Photo Required)
-
12. Trial/Pilot Holes (Photos Required)
-
14. Utility Observer (banksman)
-
16. Is at least one Operative in the Gang NRSWA Qualified (Photo of card front and back required & ticket No)
-
17. Excavator operated by qualified person (Photo of Card Required)
-
19. What type of equipment damaged the service
- Excavator
- Floor Saw
- Stihl Saw
- Breaker
- Graft
- Shovel
- Other (specify)
-
As soon as a strike is known it must be reported ASAP to Contract Project Manager and HSEQ Manager
-
Please ensure the photographic evidence is as required- Full photos of marking up including property photos and photos of all documents be mindful of glare/reflections off tablet screens. background locations for actual strike area ,measurements etc
-
Please provide witness statements
-
Person causing damage statement ..
-
Name / position
-
Witness statement....
-
Name/position
General Comments and Observations
-
Please add additional comments and observations which may help in the consideration of the strike ( eg. Ground/ weather conditions, shallow or direction change of service damaged).
Sign Off
-
Prepared By Name and Signature
-
Date and time
HS TEAM CONCLUSIONS
CAUSE OF STRIKE
-
Immediate
-
Underlying
-
Avoidable?
-
Count towards strike KPI?
-
CHF REFERENCE
CORRECTIVE ACTIONS
-
Most relevant action applied
-
Please provide brief description of action taken
-
Signature
-
Date