Title Page

  • Name of scheme or location

  • Conducted on

  • carried out by

  • Location/site
  • Contractor

  • Brief description of works

General Arrangements

  • Is the Construction Phase Plan available on site with suitable RAMS/Permits for the work being undertaken. (F10 displayed if applicable)

  • Is site signage suitable and clearly displayed

  • Are appropriate Welfare arrangements in place and suitable and sufficient for the scale of works

  • Are Emergency and first aid arrangements in place

  • Are fire risks managed, with suitable fire equipment on site

  • Traffic/Pedestrian routes suitable and managed effectively. Public protected from work activity

  • Site security - adequate for site and preventing unauthorised access

  • Storage/Parking appropriate for site and managed effectively

  • Are there records of site inductions taking place. Operative are trained and competent for the activities being undertaken. Water Hygiene tickets are valid

Environmental

  • Waste being managed appropriately or as per Waste Management Plan?

  • Environmental requirements,( e.g. GCN fencing, TPO), understood and being implemented

  • Spill kits/equipment in place and adequate for the risk?

  • Up to date Environmental Appendix and other required information on site

Behaviours

  • Appropriate PPE/RPE available and worn when required

  • Operatives observed working in a safe manner

  • Dust suppression being used (if applicable)

  • Is a clean shaven policy adopted and face fit testing carried out (if applicable)(not required for positive pressure RPE hoods)

Management of High Risk Activities

  • Underground/Overhead services- Being managed and controlled

  • Excavations - suitably protected and controlled. Safe access/egress provided

  • Lifting Operations - managed, controlled, supervised and operatives trained

  • Work At height - Managed, controlled and with appropriate supervision - Equipment in good order

  • Electrical work - Competent people, SSOW including isolations

  • Confined space activity being managed, controlled and operatives all appropriately trained.

  • Street Works - suitable for the site, managed, controlled, and operatives trained

  • Hazardous Substances being managed and controlled - storage and use

Other observations (Both Positive and negative)

  • other observations

  • other observations

  • other observations

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.