Information
-
Document No.
-
Client /landowner
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Operation
Operation type
-
Roadline
-
Coupe
Harvest type
-
Clear fall
-
Thinning
-
Partial
Harvest system
-
Cable
-
Ground based
Status
-
New
-
% complete
-
Completed
General info
1. General
-
Is a copy of the FOP and any variations available at the operation at all times?
-
Is information available showing coupe and EMP number?
-
Are roads being maintained adequately - ie logging machinery kept off, culverts and table drains clear and road surfaces permitting proper drainage?
-
Is the operation and machinery clear of any litter or evidence of fuel or oil leaks or spills that may cause environmental harm or present ignition risk?
-
Is harvesting within planned boundaries (external and SSR) as shown on the FOP?
-
Is appropriate machinery and harvesting systems being used?
-
Has all waste and rubbish been removed in accordance with the FOP?
-
Have issues identified in previous monitoring reports been addressed?
-
Has contractor confirmed that all machinery has been washed down as per requirements prior to entering the coupe?
-
If cartage restrictions ( eg. School bus times, load limits) are in place are trucks complying with them?
Entrance to worksite
2. Roads
-
Is road construction being undertaken?
-
Are the roads located and constructed in accordance with the FOP?
-
Are table drains clear and constructed properly?
-
Has drainage been diverted before stream crossing?
-
Have borrow pits been rehabilitated?
-
Is road drainage adequate?
-
Are culvert size spacing and depth correct?
-
Have temporary stream crossings been removed and water barred?
-
Have temporary tracks been drained?
-
Are roads in a safe, sound condition?
-
Are warning signs displayed/positioned correctly?
Landings
3. Landings
-
Are the landings located and constructed (size, cording, drainage) in accordance with the FOP?
-
Do Snig tracks approach the landing appropriately?
-
Has water flowing towards the landing been diverted?
-
For temporary landings has soil been stockpiled?
-
Have bark and butts been returned to the forest or placed in aerated heaps clear of surrounding trees?
-
Are the crosscutting, classification and segregation duties being performed correctly?
-
Are all products being segregated into seep rate stockpiles?
-
Have all potentially hazardous trees been removed from around the landing?
Fire equipment
4. Fire Equipment
-
Is fire equipment on site?
-
Is the following equipment on site?
-
Portable 300l tank (filled), pump and hose
-
2 X rake hoes
-
30 mtrs of hose plus 30 mtrs canvas length
-
Knapsack and or air water extinguisher for every chainsaw and every machine
-
Can all personnel use the pump?
Snig tracks
5. Snig tracks
-
Are snig tracks located in accordance with the FOP? ( Avoid streams, facilitate drainage, minimise number)
-
Are snig tracks free of turbid running water or mud over 20 metres?
-
Are stream crossings constructed in accordance with the FOP?
-
Has blading of mud or soil been avoided?
-
Is rutting depth within acceptable limits (less than 30cm over 20m)?
-
Are all wet weather limitations being observed?
Water course management
6. Water Course Management
-
Are streamside reserves clearly marked, correct width, and undisturbed by machinery?
-
Are all streams and drainage lines being treated in accordance with the FOP?
-
Unless allowed in the FOP, are the streamside reserves clear of logging debris?
-
Has machinery damage to stream banks been avoided?
-
Are streams clear of visible evidence of sediment?
-
Has mud from landings been prevented from entering streams?
-
Are fuels and lubricants stored in a location where leaks cannot enter streams either directly or indirectly through table drains?
Utilisation
7. Utilisation
-
Is timber being felled systematically, and to the prescription stipulated in the FOP?
-
Is timber being felled to minimise damage to high value log products?
-
Is damage to retained trees within acceptable limits?
-
Are felled trees processed to maximise value recovery?
-
Are all saleable high value products being segregated correctly at the landing?
Conservation
8. Conservation - Natural and Cultural Values
-
Have the conservation prescriptions in the FOP been followed?
Restoration
9. Restoration
-
Is drainage and restoration being done progressively?
-
Have road, snig tracks, landings and other restoration been completed as specified and is effective?
-
Have log crossings been removed?
-
Is this the final visit?
-
Is there a need for burning of bark heaps or residual fuel loads?
-
Please advise the forest planner for inclusion in burning program!
-
Does a regen survey need to be completed at a later date?
-
Please advise the forest planner for inclusion in regen survey program!
-
Seed present?
-
Seed worth collecting?
-
Were any forest health issues evident, including new sites of declared weeds?
Sign off
10. Comments
-
Any WH&S issues raised?
-
Enter all WHS issues raised
WHS issue
-
Enter information
-
Enter any comments regarding the operation
Comments
-
Enter Comments
-
Enter any photos of operation
Photos
-
Take image
11. Corrective actions
-
Enter corrective actions
Corrective action
-
Corrective action
-
Person responsible
-
By date
Sign off
-
Landowner
-
Contractor or agent
-
SFM or Assessor