Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location (attach marked up foundation plan)
Pre Pour Checks
Information Used
-
Revision of Quality Form/ITP
Site Checks
-
Formation - Setting out, Condition
-
Blinding/Mass Fill - Setting out
-
Reinforcement - Bar marks, Spacing, Cover
-
Formwork - Setting out
-
Cast In Items - Bolts, Penetrations, Starter Bars, Waterbar etc
Concrete Information
-
Cube References
-
Example Concrete Ticket
-
Principle Contractor Pre-Pour Acceptance
Post Pour Check
-
Cube Results
-
Concrete Setting Out/Quality
-
Cast Ins Setting Out/Quality
-
Principle Contractor Post-Pour Acceptance