Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Do you have the most recent Stamped building permit plans!!!!!!!!!!
-
Has set out been done and double checked
-
Sewer and stir water complete
-
Water tapping complete
-
Boxing level and measurements checked
-
Power bought in and meter box in position
-
Telstra conduit and NBN provision run in power trench
-
Water line bought in hard boxing
-
Conduit to Island bench
-
Hydronic slab heating complete
-
Is there any other under slab heating
-
Have plumbers cut pipes down to height
-
Blinding concrete in place if needed
-
Are ALL pipes lagged
-
Puddle flanges and pan bowls in place
-
Institute showers boxed out
-
Bath and shower boxes in place
-
Long shower grates boxed out if needed
-
Termite barriers in place to all penetrations
-
Drainage to alfresco if needed
-
Brick rebates in correct position
-
Starter bars for any brick retaining
-
Earth stake in position and tide to reo
-
Garage door rebates in correct position as per plan
-
Carpet and tile step downs / rebates for polished concrete
-
Double mesh for polished concrete
-
Garage step down and other step downs correct as per plan
-
Check pipes are in correct position and offsets suit specs
-
Strip footings dug and ready
-
Tank pad boxed in position<br>
-
Storm water pits in place as per plan
-
Reo minimum coverage as per standard ?????????
-
Plastic membrane in place, all joints taped and free from punctures
-
Form work close to ground to avoid exceeds spillage
-
Do sliding doors need to be rebated? If so are they in place, correct position and depth
-
Garden light conduit
-
Bar chairs at adequate spacings
-
Add signature