Title Page
-
Site address:
-
Inspection Date:
-
Inspection by:
-
Location:
-
Personnel Present:
Site Set Up
-
Site signage displayed for every lot number?
-
After Hours contact name and numbers displayed in required places?
-
Energency phone numbers and evacuation point nominated?
Work Areas
-
Has barrier tape been erected and maintained to identify any unsafe areas?
-
Framing Carpenter has a specific SWMS for Truss Installation?
-
If carpenters are working from ladders to install roof trusses does their SWMS reflect this scope of works?
-
Supervisors have access to SWMS?
-
Do trades have a copy of their SWMS on site?
-
Are trades working to their SWMS?
Electrical Safety
-
Meterbox board Residual Current Device (RCD) tested and tagged every month?
-
Power tools and equipment protected by earth Leakage?
-
All electrical equipment tested and tagged?
-
Temporary wiring labelled as temporary?
-
Lead stands and insulated hooks used where required?
Mobile Plant and Equipment
-
Is there any mobile plant or equipment operating on site?
-
Does all plant have flashing lights and audible reversing beeper?
-
Does all plant on site has proof of maintenance and is in good working order?
-
Verify that concrete pumps and mobile crane records are available and up to date?
-
Are out riggers fully extended and on timber supports?
-
Safe working loads are marked on the gear?
-
Lifting slings and chains are in good condition and maintained?
Working at Heights
-
Has the void protection been signed off and certificate provided?
-
Is the void protection in place prior to first floor flooring being installed?
-
Is the void cover down while workers are working on first floor
-
Has the guardrail been signed off and certificate provided?
-
Is guardrail in place prior to installing first floor flooring?
-
Roof guardrails in place around perimeter of all lower roof where work is being undertaken?
-
Handrails, midrails and toe boards have been installed and maintained on balconies?
-
Is there appropriate fall protection in place such as scaffolding or hung scaffolds for all work being undertaken on the second floor?
-
Are all ladders secured, 1:4 vertical ratio, project 1 metre above platform?
-
Has the framer installed temporary handrails over window openings lower than one metre?
Scaffolding and Ladders
-
Is there any Scaffolding erected on site?
-
Is the scaffold certificate in place and signed off every 30 days? (Scafftag)
-
Sole boards must either pick up two standards or be a minimum of 450x225x32 hardwood or laminated. The scaffold must be fitted with base plates and screw jacks?
-
Handrails, midrails and toe boards have been installed and maintained?
-
Are diagonal bracing in place every 3rd bay front and rear?
-
Is scaffolding tied back into house?
-
Is there adequate clear access to the scaffold?
-
Are all transoms fitted every 2 metres and locked in, not left loose?
-
Are all ledgers fitted every 2 metres and locked in, not left loose?
-
Are all base plates sitting on the sole boards?
-
Are the work decks fully planked out? with no missing planks or holes in the scaffold?
-
Are all gaps no greater than 225mm adjacent to the face of the structure/building?
-
Are scaffold decks clear of debris?
-
Are all platforms fully planked?
-
Are trestle scaffolds set up on even ground or adequately packed to ensure stability, and fully planked out?
-
Are all ladders commercial grade and without structural damage?
-
Can a worker use both hands to climb and descend ladder?
Summary
-
Summary - Are high risk activities compliant?