Title Page
-
Engineer Visited
-
Line manager
-
Address where report is being carried out
-
Job number
-
Number of operatives on site
-
Prepared by
-
Location
Welfare
-
Are welfare facilities provided?
-
Are Welfare facilities adequate?
RAMS
-
Are RAMS records indicative of the known previous movements of the engineer?
-
Are all RAMS Relevant?
-
Are all RAMS signed?
-
Are all RAMS in Date?
Inspections
-
Have DABS been completed? (where relevant)
-
Have Daily check Sheets been completed?
-
Is the site safety log being used?
Assessments
-
Are COSHH Assessments in place?
-
Are COSHH Assessments relevant?
-
Are Manual Handling Assessments in place?
-
Are Noise Assessments in place?
-
Are Noise Assessments relevant?
-
Have all operatives completed a vibration register?
-
Are each of these documents understood by all operatives?
Plant And PPE
-
Are all PPE and Plant Registers complete?
-
Are registers indicative of works being undertaken?
-
Is all plant properly signed off with tags fixed?
Toolbox Talks
-
Are Toolbox talks being completed?
-
Are Toolbox talks being selected for relavance?
-
Are Toolbox talks being understood by all site staff?
Accident Reporting
-
Have any accidents been reported?
-
What is the nature of the accidents reported?
-
Have any Positive interventions been reported?
-
Are all operatives aware of how to report accidents and Positive interventions?
Work Areas
-
Are there Hazards in the work area?
-
Is Dust Being Properly Controlled?
-
Do all COSHH materials have datasheets available and assessments logged?
-
Are all cabled power tools PAT tested?
-
Are all tools in good condition?
-
Do all Working at height areas have correct barriers and edge protection?
Sign Off
-
Supervisor in charge of site.
-
Person Completing report.