Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Position:
-
Location
-
Client:
Checklist
Documentation
-
RAMS have seen read, understood and signed
-
Drawing or TG20 Compliance sheet is present
-
All operatives have skills cards to hand
-
Any site-specific permits
-
Scoffold pavement licence displayed if required
-
Vehicle Defect report available and completed correctly
-
Parking Dispensation displayed
-
All operatives signed the onsite register
Personal Protective Equipment
-
High visibility jackets
-
Steel toe copped boots EN ISO 20345
-
Helmets EN12492
-
Gloves EN388:2016
-
Glasses EN166:2001
-
Harness EN361:2002
-
Double Lonyard EN355:2002
-
Self-Retracting Line EN355:2002
-
All tools are tethered
-
Equipment at work
Equipment at Work
-
Scaff step being used
-
Barriers are being used
-
Barriers have been fitted with correct signage
-
SG4-15 is being followed
-
All uniform has logos only
-
Rope and wheel used by competent person and correctly
-
All materials stocked and stored safely
-
On site health and safety
Health and Safety
-
Work area is clean and tidy
-
Operatives are using correct smoking area
-
Restricted areas are not being used
-
Operatives aware of emergency procedures on site
-
Operatives aware of the accident reporting arrangements
-
Welfare facilities are in place and adequate
Any Further Observations
-
Comments: