Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. General:
-
1.1 Country:
-
1.2 Region:
-
1.3 Site name/ID:
-
1.4 Site type:
-
1.5 Project:
-
1.6 Audit date:
-
1.7 Auditor name:
-
1.8 Company is Ceragon ASP:
-
-
1.9 Sub-contractor name:
-
1.10 Team leader name:
-
1.11 ASP members are certified and quilified for equipment to be install:
2. Safety:
-
2.1 Site risk assessment done?
-
-
2.2 Safety preparations are done?
-
-
2.3
-
-
2.4
-
-
2.5 Safety procedures are followed throughout the work and all employees aware?
-
-
2.6 All required safety Hazard in place?
-
-
2.7 First Aid kit are available?
-
-
2.8 Test equipment in Use?
-
-
2.9
-
-
2.10
-
-
2.11
-
3. Documentation
-
3.1 Work was coordinate by Ceragon?
-
-
3.2 Permit to work by Customer?
-
-
3.3 Customer permit to access the SIte.
-
-
3.4 Customer permit to commence the work.
-
-
3.5 Site RFI by Customer?
-
-
3.6 Inventory list of Equipment is available.
-
-
3.7 HSE documents.
-
-
3.8 IP Plan.
-
-
3.9 TSS[Technical SIte Survey] document.
-
-
3.10 Checklist file.
-
-
3.11 Floor plan layout of Equipment room as per approved plan.
-
-
3.12
-
-
3.13 PL4/Budget link calculation are available.
-
-
3.14 Usage of Antenna brochures.
-
-
3.15 Usage of Ceragon best practice installation guides.
-
4. Logistic.
-
4.1 All equipment arrived in proper condition?
-
-
4.2 Equipment arrived without physical damage?
-
-
4.3 All equipment crosschecked to the inventory list.
-
-
4.4 All equipment was properly packed.
-
-
4.5 Equipment was lodged well till installation.
-
-
4.6 Equipment safety uploaded and unpacked.
-
-
4.7 No DDA[Dad ]
-
-
4.8 No missing materials.
-
5. Outdoor- Pol mount & Antenna
-
5.1 Antenna Pol mount is assembled in accordance with manufacturer instruction.
-
-
5.2 Antenna Pol mount is install in accordance with Ceragon instruction.
-
-
5.3 Antenna Pol mount have sufficient clearance from existing obstruction.
-
-
5.4 Antenna Pol mount is secured and vertical.
-
-
5.5 Antenna Pol mount is safely positioned and not causes a Safety Hazard.
-
-
5.6 Antenna assembled in accordance with Manufacturer instruction.
-
-
5.7 Antenna is installed in accordance with Manufacturer instruction.
-
-
5.8 Antenna was safety lifted.
-
-
5.9 Antenna is secured mounted to the AMB[Antenna mount bracket]
-
-
5.10 Antenna is installed with NO Physical damage?
-
-
5.11 Antenna offset element is installed in accordance with Link Azimuth angle.
-
-
5.12 Antenna is Azimuth & Elevated in accordance with Link Budget calculation report.
-
-
5.13 Antenna Feeder Horn polarization is installed in accordance with Link BUdget prediction report.
-
-
5.14 Antenna Arm strut is installed in accordance with manufacturer instruction.
-
-
5.15 Antenna Arm strut azimuth secured in accordance with manufacturer tolerance angles instruction.
-
-
5.16 OMT are installed in accordance to the manufacturer instruction.
-
-
5.17 Flex WG installed & clamped in accordance to the manufacturer instruction[both sides]
-
-
5.18 Flex WG sealed & waterproofed in accordance with Ceragon instructions.
-
6. Outdoor-ODU
-
6.1 ODU installed in accordance with Ceragon guide installation instruction.
-
-
6.2 ODU is securely mounted to the Antenna or Pol mount.
-
-
6.3 ODU has no physical damage.
-
-
6.4 ODU installed in a proper way for future maintenance.
-
-
6.5 ODU polarization positioned in accordance with Link Budget prediction report.
-
-
6.6 ODU is grounded in accordance with Ceragon standard installation to the closed tower TGB.
-
-
6.7 IF Cable/N Type connector assembled in accordance to manufacturer instruction.
-
-
6.8 IF Cable/N Type connector connected to the ODU & sealed waterproofed with accordance to Ceragon instruction.
-
7. Outdoor-IF Cable & Connectors
-
7.1 IF Cables are routed in accordance with Ceragon installation guide instruction.
-
-
7.2 IF Cables are fastened with Cable Ties/Clamps across Tower ladders every 90cm.
-
-
7.3 IF Cables dressing are done without any cable overlapping & crisscrossing.
-
-
7.4 IF Cables are Earthed in accordance with Ceragon instruction.
-
-
7.5 Lighting arresters in accordance with Country regulation.
-
-
7.6 IF Cable connector assembled in accordance with manufacturer instructions.
-
-
7.7 IF Cable connector is sealed & waterproofed in accordance with Ceragon guide instructions.
-
8. Site GND
-
8.1 Site Main System[Tower&Shelter] to be measured with value of =5 Ohm.
-
-
8.2 Tower is properly grounded to MGB[Main Terminal Ground Bar]
-
-
8.3 Shelter is properly grounded to MGB[Main Terminal Ground Bar]
-
-
8.4 Proper color is using for Ground cable[Yellow/Green]
-
9. Indoor-Installation
-
9.1 19" Rack install in accordance with the room layout plan.
-
-
9.2 19" Rack leveled.
-
-
9.3 19" Rack TGB placed on bottom level,
-
If not please take a picture.
-
9.4 19" Rack is Earthed to the MGB.
-
-
9.5 PDU in place & positioned[Top of the Rack]
-
If not please take a picture.
-
9.6 PDU is Earthed to the 19" Rack TGB?
-
-
9.7 PDU Circuit breaker fuses are available for Ceragon equipment?
-
If not please take a picture.
-
9.8 PDU Circuit breaker fuses suitable to Ceragon equipment power consumption.
-
If not please take a picture.
-
9.9
-
-
9.10 IDU is located in a proper ventilated environment?
-
-
9.11 IDU is Earthed to the 19" Rack TGB.
-
If not please take a picture.
-
9.12 IDU ground cable is routed properly inside the 19" Rack.
-
-
9.13 Type of IF Cable that used on site?
-
-
9.14 IF Cable are routed in accordance with Ceragon guide installation instruction.
-
-
9.15 IF Cable labeled in accordance with Customer instructions.
-
-
9.16 IF Cable/N Type connector assembled in accordance to manufacturer instructions.
-
-
9.17 IF Cable/N Type connectors are properly connected to the IDU.
-
-
9.18 Power connector is properly connected to the IDU.
-
-
9.19 Power connector labeled in accordance with Customer instructions.
-
-
9.20 IDU power cable is routed properly inside the 19" Rack.
-
-
9.21 E1 Cables are properly routed.
-
-
9.22 E1 connector is properly connected and tied to the IDU.
-
-
9.23 E1 connector is properly connected and tied to the Protection Panel.
-
-
9.24 E1 cable is terminated to the DDF and following standard color code.
-
-
9.25 E1 cable label done as per Customer instruction.
-
10. Commission
-
10.1 Equipment staged and per configured.
-
-
10.2 Equipment power up.
-
-
10.3 RFU's frequency is configured in accordance to the Link calculation[PL4]
-
Please enter the frequency:<br>
-
10.4 Output power is configured in accordance to the Link calculation[PL4]
-
-
10.5 Expected RSL level compared to the Link calculation, deviation recommended +/-3DBm.
-
Please enter the value:<br>
-
10.6 IP Address is configured in accordance to the IP Plan.
-
Please enter the IP:
-
10.7 License throughout loaded.
-
-
10.8 NMS connectivity.
-
-
10.9 Traffic/Transmission is configured in accordance to the Transmission plan.
-
-
Add signature