Title Page

  • Site conducted

  • Location
  • Conducted on

  • Prepared by

  • Company Position

Untitled Page

MANAGEMENT

  • Status

  • How many operatives & black hats do you have on site today?

  • Have all details of CSCS Card, Proof of Address & ID cards?

  • Do we have suitable PASMA/ IPAF trained/ certified operatives on site?

  • Who has briefed new starters on the current RAMs and have they all been signed onto?

  • Are Safe Starts delivered to all operatives daily with sufficient information recorded?

  • Are regular and Project Specific TBT being conducted Weekly?

  • Are we displaying Statutory Documents &Safety Information inclusive of Policies,F10,Insurance, H&S Poster, First aid & Fire marshal?

  • Is there adequate signage displayed around site?

  • Have any near misses been reported in the last week? Any further action required from these? Please state.

  • Have any personnel worked beyond 48 hours or worked 13 straight shifts during this period?

  • Speaking to the operatives, do you have any concerns with them speaking/understanding English?

  • Actions required/taken or other brief comment

WORKING AT HEIGHT

  • Status

  • What WAH activities are currently taking place on this project? (MEWPs, Hop Ups, Step Ladders, Podiums, Towers) Are they included in the RAMs?

  • Has the Access Equipment Inspection been completed within the last 7 days?

  • Do all Tower/ Podiums/ Steps/ Hop ups have Valid Scaftag/ Permit in place?

  • Do all MEWPs/ Pop ups/ Pecos have a pre-use checklist completed before use?

  • Are all WAH operations take place inside adequate exclusion zones or tool tethers being used if needed & do they meet the SWL?

  • Actions required/taken or other brief comment

HOUSEKEEPING

  • Status

  • Are enough bins available on site& close to our working areas?

  • Is Material Storage in good order, in line with best practices & agreed areas with Principle Contractor?

  • Are Work areas kept clean and tidy when in use and when unattended? Preventing slips ,trips and falls.

  • Are trailing leads being properly managed at high level when possible?

  • Actions required/taken or other brief comment

ACCESS & EGRESS

  • Status

  • Are floor surfaces free from obstructions around site?

  • Has the Principle Contractor provided an Adequate ‘Green Route’?

  • Are stairwell and access routes sufficiently lit?

  • Has the Principle Contractor provided adequate signage directing of Access & Egress,

  • Are banksmen and traffic marshals presentduring deliveries?

  • Has the Principle Contractor provided adequate signage directing of Access & Egress, Emergency exits around the site?

  • Actions required/taken or other brief comment

PPE

  • Status

  • Are operatives following site rules regarding PPE and is it fit for purpose/ good condition?<br>(Ankle + Mid sole protection footwear, Hi-vis, Cut gloves as per company policy ,glasses<br>(where appropriate)correct colour hard hat)

  • Is task specific PPE available & being usedwhen necessary?<br>(Ear Defenders, Face Fit Masks, goggles,Harnesses/Lanyards)

  • How many operatives require face fit testing?

  • Are there lens cleaning stations available onsite?

  • Actions required/taken or other brief comment

TOOLS & EQUIPMENT

  • Status

  • Are Tools/Equipment suitable for the task, in good condition & Display a Valid PAT tag?

  • Are Tools/Equipment Inspected within the 7- days under PUWER? And correspond with Live Plant Register?

  • Have operatives been competent assessed for use of task specific tools?

  • Have appropriate mixing or cutting stations been established?

  • Have site toolboxes been inspected in the last7 days under PUWER & Is an up to date Key Register in place?

  • Actions required/taken or other brief comment

WORK PLANNING

  • Status

  • Have future work areas been inspected for make ready needs and coordinated with other trades?

  • Are our work areas clear of obstructions &other trades?

  • Is adequate safety signage clearly displayed within our work areas?

  • Are any permits to work in operation?(Hot Works, Step Ladder, Permit to Work, Confined Space)

  • Actions required/taken or other brief comment

FIRE

  • Status

  • Are the Principle Contractor managing their fire responsibilities appropriately? (Fire Exits Clear, Fire Plan in place, Fire points located, Fire drills)

  • Are company fire extinguishers available and in date for Hot Work Activities? (2x 2.5kg)

  • Do we have an Appointed & Deputy Fire Marshal on the project?

  • Actions required/taken or other brief comment

Environmental

  • Status

  • Is there Suitable COSHH Containment provision? (Separate storage for Gas, Oxygen& Flammable items)

  • Has Appropriate Signage been displayed?<br>(Flammable Materials, Mandatory Hearing Zones)

  • Are controls in place to reduce dust?<br>(Extraction with correct bags, FFP3 Face Masks, Damping Down System)

  • Recycling and re-use of waste materials occurring where possible?

  • Where noisy works is being undertaken has<br>‘Best Practicable Means been employed to reduce noise levels to the lowest possible level?

  • Are Environmental Tool Box Talks happening?

  • Actions required/taken or other brief comment

WELFARE

  • Status

  • Has the Principle Contractor provided suitable& sufficient Sanitary Conveniences for the<br>current workforce?<br>(Toilets, Cold/Hot running water, Towels, Soap)

  • Has the Principle Contractor provided suitable & sufficient Welfare Facilities for the current work force?<br>(Canteen, Seats, Drinking Station, means to heat food, Drying room)

  • Has the Principle Contractor made provisions for ‘Female Toilets’ or provided lockable doors on shared toilets?

  • Has a First Aid Kit been provided on both Site& Project Office? Checked and re-filled?

  • Actions required/taken or other brief comment

SITE OFFICE

  • Status

  • Is the space provided adequate for the site team including comfortable Work Stations?

  • Are desk tops kept clean and tidy & in good order?

  • Has all Office Equipment been PAT tested and in good condition?

  • Is H&S documentation available upon request?

  • Actions required/taken or other brief comments

Other Items Identified

  • Additional Comments

  • Signature of Auditor

  • Signature of Drywall Solutions Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.