Title Page
-
Site conducted
-
Location
-
Conducted on
-
Prepared by
-
Company Position
Untitled Page
MANAGEMENT
-
Status
-
How many operatives & black hats do you have on site today?
-
Have all details of CSCS Card, Proof of Address & ID cards?
-
Do we have suitable PASMA/ IPAF trained/ certified operatives on site?
-
Who has briefed new starters on the current RAMs and have they all been signed onto?
-
Are Safe Starts delivered to all operatives daily with sufficient information recorded?
-
Are regular and Project Specific TBT being conducted Weekly?
-
Are we displaying Statutory Documents &Safety Information inclusive of Policies,F10,Insurance, H&S Poster, First aid & Fire marshal?
-
Is there adequate signage displayed around site?
-
Have any near misses been reported in the last week? Any further action required from these? Please state.
-
Have any personnel worked beyond 48 hours or worked 13 straight shifts during this period?
-
Speaking to the operatives, do you have any concerns with them speaking/understanding English?
-
Actions required/taken or other brief comment
WORKING AT HEIGHT
-
Status
-
What WAH activities are currently taking place on this project? (MEWPs, Hop Ups, Step Ladders, Podiums, Towers) Are they included in the RAMs?
-
Has the Access Equipment Inspection been completed within the last 7 days?
-
Do all Tower/ Podiums/ Steps/ Hop ups have Valid Scaftag/ Permit in place?
-
Do all MEWPs/ Pop ups/ Pecos have a pre-use checklist completed before use?
-
Are all WAH operations take place inside adequate exclusion zones or tool tethers being used if needed & do they meet the SWL?
-
Actions required/taken or other brief comment
HOUSEKEEPING
-
Status
-
Are enough bins available on site& close to our working areas?
-
Is Material Storage in good order, in line with best practices & agreed areas with Principle Contractor?
-
Are Work areas kept clean and tidy when in use and when unattended? Preventing slips ,trips and falls.
-
Are trailing leads being properly managed at high level when possible?
-
Actions required/taken or other brief comment
ACCESS & EGRESS
-
Status
-
Are floor surfaces free from obstructions around site?
-
Has the Principle Contractor provided an Adequate ‘Green Route’?
-
Are stairwell and access routes sufficiently lit?
-
Has the Principle Contractor provided adequate signage directing of Access & Egress,
-
Are banksmen and traffic marshals presentduring deliveries?
-
Has the Principle Contractor provided adequate signage directing of Access & Egress, Emergency exits around the site?
-
Actions required/taken or other brief comment
PPE
-
Status
-
Are operatives following site rules regarding PPE and is it fit for purpose/ good condition?<br>(Ankle + Mid sole protection footwear, Hi-vis, Cut gloves as per company policy ,glasses<br>(where appropriate)correct colour hard hat)
-
Is task specific PPE available & being usedwhen necessary?<br>(Ear Defenders, Face Fit Masks, goggles,Harnesses/Lanyards)
-
How many operatives require face fit testing?
-
Are there lens cleaning stations available onsite?
-
Actions required/taken or other brief comment
TOOLS & EQUIPMENT
-
Status
-
Are Tools/Equipment suitable for the task, in good condition & Display a Valid PAT tag?
-
Are Tools/Equipment Inspected within the 7- days under PUWER? And correspond with Live Plant Register?
-
Have operatives been competent assessed for use of task specific tools?
-
Have appropriate mixing or cutting stations been established?
-
Have site toolboxes been inspected in the last7 days under PUWER & Is an up to date Key Register in place?
-
Actions required/taken or other brief comment
WORK PLANNING
-
Status
-
Have future work areas been inspected for make ready needs and coordinated with other trades?
-
Are our work areas clear of obstructions &other trades?
-
Is adequate safety signage clearly displayed within our work areas?
-
Are any permits to work in operation?(Hot Works, Step Ladder, Permit to Work, Confined Space)
-
Actions required/taken or other brief comment
FIRE
-
Status
-
Are the Principle Contractor managing their fire responsibilities appropriately? (Fire Exits Clear, Fire Plan in place, Fire points located, Fire drills)
-
Are company fire extinguishers available and in date for Hot Work Activities? (2x 2.5kg)
-
Do we have an Appointed & Deputy Fire Marshal on the project?
-
Actions required/taken or other brief comment
Environmental
-
Status
-
Is there Suitable COSHH Containment provision? (Separate storage for Gas, Oxygen& Flammable items)
-
Has Appropriate Signage been displayed?<br>(Flammable Materials, Mandatory Hearing Zones)
-
Are controls in place to reduce dust?<br>(Extraction with correct bags, FFP3 Face Masks, Damping Down System)
-
Recycling and re-use of waste materials occurring where possible?
-
Where noisy works is being undertaken has<br>‘Best Practicable Means been employed to reduce noise levels to the lowest possible level?
-
Are Environmental Tool Box Talks happening?
-
Actions required/taken or other brief comment
WELFARE
-
Status
-
Has the Principle Contractor provided suitable& sufficient Sanitary Conveniences for the<br>current workforce?<br>(Toilets, Cold/Hot running water, Towels, Soap)
-
Has the Principle Contractor provided suitable & sufficient Welfare Facilities for the current work force?<br>(Canteen, Seats, Drinking Station, means to heat food, Drying room)
-
Has the Principle Contractor made provisions for ‘Female Toilets’ or provided lockable doors on shared toilets?
-
Has a First Aid Kit been provided on both Site& Project Office? Checked and re-filled?
-
Actions required/taken or other brief comment
SITE OFFICE
-
Status
-
Is the space provided adequate for the site team including comfortable Work Stations?
-
Are desk tops kept clean and tidy & in good order?
-
Has all Office Equipment been PAT tested and in good condition?
-
Is H&S documentation available upon request?
-
Actions required/taken or other brief comments
Other Items Identified
-
Additional Comments
-
Signature of Auditor
-
Signature of Drywall Solutions Manager