Title Page
-
Site conducted
Audit Details
-
Auditor Name:
-
Conducted on:
Project Details
-
Workstream:
-
Client:
-
Project Manager:
-
Site No / Name:
-
Site Postcode:
-
Site Type:
-
Scope of Works:
-
Person in Charge of Works:
-
Other Team Members:
-
Contractors on Site: (Company Names)
Additional Comments
-
Please Insert any Additional Comments: (If Applicable)
Audit Questions
-
Activities being undertaken on site:
- * Site Management
- * Health and Safety Documentation
- * Health and Safety Equipment
- * Personal Protective Equipment (PPE)
- * Communications
- * Welfare
- Contractors
- Climbing Masts / Structures
- Rooftops
- Ladders
- Rope Access
- Radio Frequency (RF)
- Tools and Equipment
- Hazardous Substances
- Streetworks
- MEWPS
- Fixed Scaffolding
- Mobile Scaffold Towers
- Asbestos
- Excavations and Buried Services
- Plant Vehicles
- Lifting Operations
- Electrical
- Manual / Mechanical Lifting
- Environment
- Aborted Visit
Site Management
-
Is the Person in Charge of Works (PICOW) suitably trained? (EG Person in Charge of Works Training, SMSTS, SSSTS etc.)
-
Have all individuals booked on site correctly?
-
Is the site access permit available on site and correct? (EG Cellnex, WIG etc.)
-
Is there safe access and egress to and from the work area?
-
Is suitable and sufficient safety signage displayed?
-
Is the site secure from unauthorised visitors? (EG members of the public)
-
Are suitable and sufficient barriers, fencing and perimeter controls in place for the works?
-
Are there suitable and sufficient first aiders on site and do they hold valid and in date training?
-
Are works vehicles parked safely and legally?
-
Are works vehicles in good condition and fit for purpose?
Health and Safety Documentation
-
Where applicable, is the below documentation available on site, signed (where required) by all individuals, and is it suitable and sufficient for the activities being undertaken?
-
Method Statement
-
Risk Assessment
-
Dynamic Risk Assessment (DRA)
-
Construction Phase Plan (CPP)
-
Task Briefing Sheet (Rail)
-
Permits (EG Permit to Dig, Hot Works Permit, Electrical Permit etc.)
-
Have all required individuals completed a full site induction?
Working at Height - Climbing Structures
-
Do all climbers hold valid and in date climb and rescue training certificates?
-
Do all climbers hold a valid and in date Working at Height medical certificates?
-
Does all required fall arrest equipment have a valid and in date thorough inspection by a competent person?<br>(EG Latchway, Sala, Soll, Metreel)
-
Does the structure and fall arrest system have valid and in date safe to climb certification?
-
Is rescue equipment (EG rescue kit, first aid kit etc.) suitably located?
-
Does the rescue kit have a valid and in date thorough inspection by a competent person? (including tamper seal)
-
Are tools and equipment being suitably tethered?
-
Is a suitable and sufficient drop / exclusion zone in place?
Working at Height - Rooftop
-
Do all required individuals have valid and in date rooftop safety training?
-
Does the rooftop safety kit have a valid and in date thorough inspection by a competent person?
-
Is there suitable and sufficient edge protection / falling materials protection?
-
Have all fragile surfaces been identified and suitably protected?
Working at Height - Ladders
-
Do all required individuals have valid and in date ladder safety training?
-
Do all ladders being used on site have evidence of thorough inspection that is valid and in date?
-
Are all ladders setup and being used correctly?
-
Are non conductive, insulated ladders in use where working near electrical hazards?
Radio Frequency (RF)
-
Do all required individuals hold valid and in date Radio Frequency (RF) hazard awareness training?
-
Has the site been isolated correctly?
-
Has a Radio Frequency (RF) sweep of the working area been carried out using an RF monitor?
-
Is there suitable and sufficient RF monitors in use on site?
-
Do all RF monitors in use on site have valid and in date certificates of calibration?
Streetworks
-
- Streetworks sites MUST have a qualified supervisor appointed to oversee the works
- Operatives MUST be on site at all times during work activities
- The supervisor does not need to be on site at all times but MUST be able to suitably and
sufficiently carry out those duties
- One person cannot cover the duties of operative and supervisor at the same time
- Operatives and Supervisors MUST hold valid and in date Streetworks Cards and have
them accessible on site at all times
- Anyone acting as a supervisor or operative MUST hold the relevant streetworks units and
can only perform the activities to which they are fully qualified (as detailed below): -
Do all required individuals hold valid and in date streetworks cards with required units?
-
Where an EToN notice is required, is it available on site and being adhered to?
-
Is a statutory information board in place as required by the streetworks code of practice?
-
Is the TM / PM set up in line with the plan provided?
-
Is signing, lighting and guarding suitable and sufficient for the site location and activities being undertaken?
MEWP's
-
Does the MEWP operator have valid and in date training? (EG IPAF)
-
Is there evidence of a 6 monthly thorough examination (by a competent person) for the MEWP?
-
Is there a suitable and sufficient Method Statement and Risk Assessment on site for MEWP activities?
-
Is a suitable rescue plan in place (including designated person familiarised in MEWP controls on the ground) in case of equipment failure or emergency?
-
Is the MEWP correctly positioned and being operated in accordance with RAMS / plans?
Scaffolding
-
Has scaffolding been erected, altered or dismantled by operatives with valid and in date training? (EG CISRS)
-
Is there evidence of scaffolding inspection by a competent person?<br>(EG once erected, modified and not exceeding every 7 days)
-
Has scaffolding been setup correctly?
Excavations and Buried Services
-
Are utility plans available on site?
-
Have all services been identified and suitably marked on site?
-
Are safe digging practices being used on site?
-
Do Cable Avoidance Tools (CAT) have valid and in date certificates of calibration?
-
Do all individuals using Cable Avoidance Tools have valid and in date training?
-
Is there safe access and egress in place for the excavation?
-
Are all excavations suitably and sufficiently controlled? (EG shored, battered, spoil stored safely etc.)
-
Are insulated tools being used on site? (if digging near electrical services or equipment)
Lifting Operations
-
Does the Appointed Person (AP) or Lift Supervisor (LS) hold valid and in date training? (EG CPCS)
-
Does the crane operator have valid and in date training? (EG CPCS)
-
Do all slingers / signallers have valid and in date training? (EG CPCS)
-
Is there a Lift Plan available on site for lifting operations, including specific Risk Assessment and Method Statement?
-
Does the Lift Plan detail the correct lifting equipment and does the documentation match the equipment on site?
-
Does the crane have evidence of thorough inspection that is valid and in date?
-
Do all lifting accessories (EG slings, chains etc.) have evidence of thorough inspection that is valid and in date?
-
Is the crane and equipment positioned correctly and being used in accordance with the Lift Plan / RAMS?
Electrical
-
Do all electrical engineers have valid and in date training? (EG 18th Edition, ECS card?)
-
Has the site been isolated and locked off correctly?
-
Do all required tools (EG multitesters, earth testers etc.) have a valid and in date certificate of calibration?
-
Are insulated tools in use in accordance with IEC 60900 and EN-0900?
Hazardous Substances
-
Do all individuals using hazardous substances have valid and in date COSHH training?
-
Is there a COSHH pack (EG COSHH Assessment and Material Safety Data Sheet) in place for all hazardous substances being used on site?
-
Are the safety measures as detailed in the COSHH pack being adhered to on site?
Plant Vehicles
-
Do plant vehicle operators have valid and in date training? (EG CPCS)
-
Do plant vehicles have evidence of thorough examination / inspection by a competent person?
Asbestos
-
Do all individuals on site have valid and in date Asbestos Awareness training?
-
Has the Asbestos Register / Management Plan been reviewed and communicated?
-
Has the asbestos hazard potential been managed adequately?
Environment
-
If waste is being produced on site, is it being segregated and stored effectively?
-
If waste has been collected, has a Waste Transfer Note been provided?
Tools and Equipment
-
Are all hand / power tools in use fit for purpose and in suitable condition?
-
Do all required tools / equipment have evidence of servicing and maintenance?
-
Do all required electrical items have evidence of valid and in date PAT testing?<br>(EG chargers, extensions, transformers, power tools etc.)
-
Where in use, do all required individuals have valid and in date abrasive wheel training?<br>(EG grinders)
Manual / Mechanical Lifting
-
Do all required individuals have valid and in date manual handling training?
-
Do all required individuals have valid and in date rigging and lifting training?
-
Does all lifting equipment / accessories in use have evidence of valid and in date thorough inspection by a competent person?<br>(EG ropes, slings, shackles, chains, karabiners etc.)
Working at Height - Rope Access
-
Do all rope access operators / supervisors have valid and in date training? (EG IRATA)
-
Do all rope access operators / supervisors hold valid and in date Working at Height medical certificates?
-
Does all rope access equipment have a valid and in date thorough inspection by a competent person? <br>(EG ropes, karabiners, descenders, slings etc.)
-
Is rescue equipment (EG rescue kit, first aid kit etc.) suitably located?
-
Does the rescue kit have a valid and in date thorough inspection by a competent person? (including tamper seal)
-
Are tools and equipment being suitably tethered?
Mobile Access Towers
-
Have mobile towers been assembled, altered, dismantled, inspected and used by suitably trained persons? (EG PASMA)
-
Has the mobile access tower been setup correctly and in a safe / suitable location?
-
Reason for Abort:
-
Is an Oil Spill Kit available on site, in good condition?
-
Is there a BS-8599 first aid kit available on site with adequate stock?
-
Is there a fire extinguisher available on site, in good condition with evidence of inspection?
-
Is there a sharps kit available on site, in good condition?
-
Is there a HSE box / bag available on site, with adequate stock?<br>Content should include:<br> - 6x standard safety gloves<br> - 3x cut resistant gloves<br> - 20x ear defenders<br> - 3x safety glasses / goggles<br> - 6x FFP3 dust masks<br> - 1x sun protection cream
-
Is there suitable and sufficient welfare arrangements in place for the works?
-
Is site welfare clean and tidy?
-
Is there suitable means of communication in place between all individuals on site?
-
Are attendees aware of the latest QHSE Communication?
-
Do all required individuals have access to and understand how to use Microsoft Teams (Central)?
-
Is there suitable and sufficient PPE on site for all required workers, and in good condition?
-
Does all required PPE have a valid and in date thorough inspection by a competent person?<br>(EG climbing helmets, climbing harnesses, lanyards etc.)
-
Are contractors being used on site listed as "Approved" on the Approved Contractor List?
Additional Comments
-
Would any individuals like to raise any other health and safety questions, concerns or suggestions to the QHSE Department?
Audit Photos
-
Site Photos