Title Page
-
Conducted on
-
Prepared by
-
Location
-
Select date
-
Inspected By
-
Project
- Richmond
- Twickenham
- Feltham
- East Anglia LX
- East Putney
- Redhill
- Waterloo
- Reading 10 Car
- Other
-
Site
-
Site
- Wokingham
- Feltham
- Virginia Water
- Feltham
- Egham
- Sunningdale
-
Project
1. Site Documentation
-
1.1 Construction Phase Plan
-
1.2 Health & Safety Policy
-
1.3 F10
-
1.4 Emergency Contact List
-
1.5 Insurance
-
1.6 Law Poster
-
1.7 Risk Assessments
-
1.8 WPP / TB / MS
- Work Package Plan
- Task Brief
- Method Statement
-
1.9 Permits (hot works, dig, C Form...)
-
1.10 Inspection Registers (Statutory Registers)
-
1.11 Subcontractor Documentation
-
Comments or Nil Return:
2. Monitoring
-
2.1 Fire Control
-
2.2 First Aid
-
2.3 Toolbox Talks
-
2.4 Welfare Facilities
-
2.5 Competence
-
2.6 Induction
-
Comments or Nil Return:
3. Railway Related Specifics
-
3.1 SSOW (Briefing, Protection Arrangements, Signed off...etc)
-
3.2 Sentinel Checks (Validity, Sponsor, Competence...)
-
3.3 WPP / TB (Briefing, Compliance..)
-
3.4 Access Points
-
3.5 COSS Performance (Briefing, Work Group Control...)
-
3.6 ES Performance (COSS Briefing...)
-
3.7 OLE / OTP / ALO / CC – MC
-
3.8 Emergency Arrangements
-
3.9 Life Saving Rules (Communication, Compliance...)
-
Comments or Nil Return:
4. Work Task Performance
-
4.1 PPE (Compliance)
-
4.2 Work at Height (Access, Falls, Edge Protection...)
-
4.3 Housekeeping
-
4.4 COSHH (Hazardous / Flammable Substances)
-
4.5 Security
-
4.6 Buried / Overhead Services
-
4.7 Signage
-
4.8 Electricity (PA Test, Trailing Leads...)
-
4.9 Work Platforms (Towers, Scaffolds, MEWP's...)
-
4.10 Noise / Vibration (Safe Use, Assessment...)
-
4.11 Excavations (Guarded, Exclusion Zones, Inspected...)
-
4.12 Access & Egress Routes (Signed, Clear of Obstruction...)
-
4.13 Asbestos (Register, Survey, Training...)
-
4.14 Manual Handling (Assessment, Technique...)
-
4.15 Abrasive Wheels (Safe Use, PPE, Training...)
-
4.16 LOLER / Lifting (RAMS, Lift Plan, Inspection, TE, Competency...)
-
4.17 Confined Spaces (Permits, RAMS, Competency...)
-
4.18 Plant / Equipment (PUWER...)
-
4.19 Other - State: Foul weather clothing
-
Comments or Nil Return:
5. Environmental / Ecology
-
5.1 WPP / TB / MS (Reference to Environment / Ecological Performance)
-
5.2 Waste (In Accordance with WPP / TB / MS, Segregation, Skip ID...)
-
5.3 Ecology (Briefings, Habitats, Surveys...)
-
Comments or Nil Return:
6. Management / Supervision
-
6.1 Is management structure clearly defined and understood?
-
6.2 Is a management organogram displayed?
-
6.3 Are on-site management meetings held and attended?
-
6.4 Are statutory registers completed and supervisor inspections carried-out weekly?
-
Comments or Nil Return:
7. Surveillance
-
7.1 Does member of staff have the necessary competencies to work on the equipment in their area?
-
7.2 Has all new work been carried-out / completed to the requirements of the appropriate standards?
-
7.3 Have the correct tools / equipment been used to undertake the work?
-
7.4 Have all the records been completed and signed off correctly?
-
Comments or Nil Return:
-
Additional Comments